Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
Article 46
Commencement Information
I1Sch. 16 in force at 30.10.2019, see art. 1
Document/Plan | Document Number | Document date/Plan number with revision number |
---|---|---|
Access and rights of way plans | ||
Key Plan | 2.3 | NGW-BWB-LSI-XX-DR-C-00170-P5 |
Sheet 1 | 2.3A | NGW-BWB-LSI-01-DR-C-00171-P6 |
Sheet 2 | 2.3B | NGW-BWB-LSI-02-DR-C-00172-P5 |
Sheet 3 | 2.3C | NGW-BWB-LSI-03-DR-C-00173-P7 |
Sheet 4 | 2.3D | NGW-BWB-LSI-04-DR-C-00174-P7 |
Sheet 5 | 2.3E | NGW-BWB-LSI-05-DR-C-00175-P5 |
The book of reference | 4.3B | 26 March 2019 |
The design and access statement | 6.9 | Rev S2 18 May 2018 |
The environmental statement | 5.2 | 18 May 2018 (subject to the substitutions set out below): (i) Figures 2.1, 2.2, 2.3 and 10.1 – 13 August 2018; (ii) Appendix 2.1 (Construction and Environmental Management Plan) –19 March 2019; (iii) Appendix 2.4 (Comparative Assessment of Northampton Gateway and Rail Central) – 8 January 2019; (iv) Appendix 5.12 (Landscape and Ecological Management Plan) – 30 November 2018 (v) Chapter 9 (Air Quality) – 26 February 2019 |
The highway classification plans | ||
Key Plan | 2.5 | NGW-BWB-LSI-XX-DR-C-180-P5 |
Sheet 1 | 2.5A | NGW-BWB-LSI-01-DR-C-181-P5 |
Sheet 2 | 2.5B | NGW-BWB-LSI-02-DR-C-182-P5 |
Sheet 3 | 2.5C | NGW-BWB-LSI-03-DR-C-183-P6 |
Sheet 4 | 2.5D | NGW-BWB-LSI-04-DR-C-184-P5 |
The highway plans | ||
Key Plan | 2.4 | NGW-BWB-HGN-XX-DR-C-100-P6 |
General Arrangement Sheet 1 | 2.4A | NGW-BWB-HGN-01-DR-C-101-P8 |
General Arrangement Sheet 2 | 2.4B | NGW-BWB-HGN-02-DR-C-102-P9 |
General Arrangement Sheet 3 | 2.4C | NGW-BWB-HGN-03-DR-C-103-P9 |
General Arrangement Sheet 4 | 2.4D | NGW-BWB-HGN-04-DR-C-104-P10 |
General Arrangement Sheet 5 | 2.4E | NGW-BWB-HGN-05-DR-C-105-P8 |
General Arrangement Sheet 6 | 2.4F | NGW-BWB-HGN-06-DR-C-106-P9 |
Cross Sections Sheet 1 | 2.4G | NGW-BWB-HGN-01-DR-C-131-P7 |
Cross Sections Sheet 2 | 2.4H | NGW-BWB-HGN-02-DR-C-132-P5 |
Cross Sections Sheet 3 | 2.4J | NGW-BWB-HGN-03-DR-C-133-P5 |
Cross Sections Sheet 4 | 2.4K | NGW-BWB-HGN-04-DR-C-134-P6 |
Cross Sections Sheet 5 | 2.4L | NGW-BWB-HGN-05-DR-C-135-P4 |
Long Sections Sheet 1 | 2.4M | NGW-BWB-HGN-01-DR-C-141-P7 |
Long Sections Sheet 2 | 2.4N | NGW-BWB-HGN-02-DR-C-142-P6 |
Long Sections Sheet 3 | 2.4P | NGW-BWB-HGN-03-DR-C-143-P6 |
Long Sections Sheet 4 | 2.4Q | NGW-BWB-HGN-04-DR-C-144-P4 |
Long Sections Sheet 5 | 2.4R | NGW-BWB-HGN-05-DR-C-00145-P4 |
Long Sections Sheet 6 | 2.4S | NGW-BWB-HGN-06-DR-C-146-P3 |
General Arrangement Alternative to Document 2.4A | 2.4T | NGW-BWB-HGN-01-DR-C-107-P3 |
General Arrangement Alternative to Document 2.4B | 2.4U | NGW-BWB-HGN-02-DR-C-108-P4 |
The illustrative rail terminal plan | 2.8 | 4054-17-S1 |
The land plans | ||
Key Plan | 2.1 | 62241114-001 2.1 08 |
Sheet 1 | 2.1A | 62241114-001 2.1A 06 |
Sheet 2 | 2.1B | 62241114-001 2.1B 08 |
Sheet 3 | 2.1C | 62241114-001 2.1C 06 |
Sheet 4 | 2.1D | 62241114-001 2.1D 09 |
Sheet 5 | 2.1E | 62241114-001 2.1E 06 |
Sheet 6 | 2.1F | 62241114-001 2.1F 07 |
The parameters plan | 2.10 | 4054-R007-S2 |
The railway plans | ||
General Arrangement | 2.9A | NGW-BWB-RGN-XX-DR-C-110-P6 |
Long Sections Sheet 1 of 2 | 2.9B | NGW-BWB-RGN-01-DR-C-111-P4 |
Long Sections Sheet 2 of 2 | 2.9C | NGW-BWB-RGN-02-DR-C-112-P4 |
Cross Sections | 2.9D | NGW-BWB-RGN-XX-DR-C-113-P4 |
The Rail Central footpath connections plan | 2.15 | NGW-BWB-GEN-XX-SK-C-SK91-P3 |
The speed limit plans | ||
Key Plan | 2.7 | NGW-BWB-LSI-XX-DR-C-00190-P5 |
Sheet 1 | 2.7A | NGW-BWB-LSI-01-DR-C-00191-P6 |
Sheet 2 | 2.7B | [F1NGW-BWB-LSI-02-DR-C-00192-P6] |
Sheet 3 | 2.7C | NGW-BWB-LSI-03-DR-C-00193-P7 |
Sheet 4 | 2.7D | [F2NGW-BWB-LSI-04-DR-C-00194-P5] |
The traffic regulation plans | ||
Key Plan | 2.6 | NGW-BWB-LSI-XX-DR-C-00150-P5 |
Sheet 1 | 2.6A | NGW-BWB-LSI-01-DR-C-00151-P3 |
Sheet 2 | 2.6B | NGW-BWB-LSI-02-DR-C-00152-P3 |
Sheet 3 | 2.6C | NGW-BWB-LSI-03-DR-C-00153-P1 |
The works plans | ||
Key Plan | 2.2 | NGW-BWB-LSI-XX-DR-C-00160-P13 |
Sheet 1 | 2.2A | NGW-BWB-LSI-01-DR-C-00161-P10 |
Sheet 2 | 2.2B | NGW-BWB-LSI-02-DR-C-00162-P7 |
Sheet 3 | 2.2C | NGW-BWB-LSI-03-DR-C-00163-P8 |
Sheet 4 | 2.2D | NGW-BWB-LSI-04-DR-C-00164-P6 |
Sheet 5 | 2.2E | NGW-BWB-LSI-05-DR-C-00165-P6 |
Sheet 6 | 2.2F | NGW-BWB-LSI-06-DR-C-00166-P6 |
Sheet 7 | 2.2G | NGW-BWB-LSI-XX-DR-C-00167-P5 |
[F3The rail infrastructure plan | - | NGW-BWB-GEN-XX-SK-C-SK315-S2-P01] |
Textual Amendments
F1Word in Sch. 16 substituted (7.10.2020) by The Northampton Gateway Rail Freight Interchange (Correction) Order 2020 (S.I. 2020/1670), arts. 1, 2(4)(a)
F2Word in Sch. 16 substituted (7.10.2020) by The Northampton Gateway Rail Freight Interchange (Correction) Order 2020 (S.I. 2020/1670), arts. 1, 2(4)(b)
F3Words in Sch. 16 table inserted (7.4.2023) by The Northampton Gateway Rail Freight Interchange (Amendment) Order 2023 (S.I. 2023/418), arts. 1, 2(4)
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: