Search Legislation

The Construction Products (Amendment etc.) (EU Exit) Regulations 2019

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes to legislation:

There are currently no known outstanding effects for the The Construction Products (Amendment etc.) (EU Exit) Regulations 2019, PART 11. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

PART 11U.K.Amendments to the Annexes

Substitution of Annex 2U.K.

66.  For Annex 2 (procedure for adopting a European Assessment Document), substitute—

ANNEX 2U.K.PROCEDURE FOR ADOPTING A UK ASSESSMENT DOCUMENT
Request for a UK Technical Assessment

1.  When a manufacturer makes a request for a UK Technical Assessment to any TAB for a construction product, and after the manufacturer and the responsible TAB have signed an agreement of commercial secrecy and confidentiality, unless the manufacturer decides otherwise, the manufacturer must submit to the responsible TAB a technical file describing the product, its use as foreseen by the manufacturer and details of the factory production control the manufacturer intends to apply.

Requirements in relation to relevant TABs

2.  For construction products referred to in Article 21(1)(c) for which there are other relevant TABs, the responsible TAB must within three weeks of the receipt of the technical file:

(a)agree a work programme for the development of the UK Assessment Document with the relevant TABs;

(b)establish a working group of the relevant TABs to develop the UK Assessment Document.

A representative from each relevant TAB must participate in the working group established by the responsible TAB.

Contract

3.  For construction products referred to in Article 21(1)(c), within 1 month from the receipt of the technical file, a contract must be concluded between the manufacturer and the responsible TAB for the production of the UK Technical Assessment, defining the work programme for drawing up the UK Assessment Document, including:

  • — the organisation of work between any relevant TABs,

  • — if applicable, the composition of the working group referred to in section 2.

Work programme

4.  After the conclusion of the contract with the manufacturer, the responsible TAB must inform the Secretary of State of the work programme for drawing up the UK Assessment Document and the schedule for its execution and indicate the assessment programme. This communication must take place within 3 months of receipt of the request for a UK Technical Assessment.

The draft UK Assessment Document

5.  The responsible TAB must finalise a draft UK Assessment Document with the working group referred to in section 2 and must share this draft with the parties concerned within 6 months of the date the Secretary of State was informed of the work programme.

Secretary of State participation

6.  The Secretary of State may participate, as an observer, in all the parts of the execution of the work programme.

Extension and delay

7.  Any delay in relation to the time limits set in sections 1 to 5 in this Annex must be reported by the responsible TAB to the Secretary of State.

If an extension of the time limits for developing the UK Assessment Document can be justified, notably by the absence of a Secretary of State decision on the applicable system of assessment and verification of constancy of performance for the construction product or by the need to develop a new test method, the Secretary of State is to set an extended time limit.

Amendments and adoption of a UK Assessment Document

8.  The responsible TAB must communicate the draft UK Assessment Document to the manufacturer. The manufacturer has [F121 days] to provide representations to the responsible TAB. Thereafter, the responsible TAB must:

(a)consider any representations from the manufacturer with the working group referred to in section 2 and agree any changes to the draft UK Assessment Document with that group;

(b)if applicable, inform the manufacturer as to how the manufacturer's reactions have been taken into account;

(c)adopt the draft UK Assessment Document; and

(d)send a copy to the Secretary of State.

If, within [F121 days] of receipt, the Secretary of State provides observations to the responsible TAB on the draft UK Assessment Document, the responsible TAB, after it and any relevant TABs have been given the opportunity to comment, must amend the draft accordingly and must send a copy of the adopted UK Assessment Document to the manufacturer and to the Secretary of State.

F2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Final UK Assessment Document to be published

9.  As soon as the first UK Technical Assessment is issued by the responsible TAB on the basis of the adopted UK Assessment Document, the responsible TAB must adjust the UK Assessment Document, if appropriate, based on experiences gained and with the agreement of any relevant TABs.

The responsible TAB must adopt the final UK Assessment Document and must send a copy of it to the Secretary of State for publication of its reference.

As soon as the UK mark is affixed to the product, the responsible TAB must inform any relevant TABs and all the relevant TABs (including the responsible TAB) must keep the UK Assessment Document publicly available by electronic means.

Use of final UK Assessment Document

10.  Once the reference to the final UK Assessment Document is published by the Secretary of State under Article 22, it may be used by any relevant TAB for the purpose of issuing UK Technical Assessments..

Textual Amendments

F1Words in Sch. 1 para. 66 substituted (31.12.2020 immediately before S.I. 2019/465 comes into force) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1359), reg. 1, Sch. 1 para. 12(a)

F2Words in Sch. 1 para. 66 omitted (31.12.2020 immediately before S.I. 2019/465 comes into force) by virtue of The Construction Products (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1359), reg. 1, Sch. 1 para. 12(b)

Commencement Information

I1Sch. 1 para. 66 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendments to Annex 3U.K.

67.—(1) Annex 3 (declaration of performance) is amended as follows.

(2) In point 6a—

(a)for “Harmonised” substitute “ Designated ”;

(b)for “Notified” substitute “ Approved ”.

(3) In point 6b—

(a)for “European”, in both places, substitute “ UK ”;

(b)for “Notified” substitute “ Approved ”.

(4) In point 8, after “Regulation (EU) No 305/2011” insert “ as it has effect in the United Kingdom [F3in respect of Great Britain].

(5) In the instructions for drawing up the declaration of performance—

(a)in paragraph 1, after “Regulation (EU) 305/2011”, in the first place it occurs, insert “ as it has effect in the United Kingdom [F4in respect of Great Britain].

(b)in paragraph 2, in point 4—

(i)for “harmonised” substitute “ designated ”;

(ii)for “European” substitute “ UK ”.

(c)in paragraph 3, in the table—

(i)in the instruction for point 1, for “CE” substitute “ UK ”;

(ii)in the instruction for points 6a and 6b—

(aa)for “harmonised”, in each place it occurs, substitute “ designated ”;

(bb)for “European”, in each place it occurs, substitute “ UK ”;

(cc)for “notified”, in each place it occurs, substitute “ approved ”.

Textual Amendments

F3Words in Sch. 1 para. 67(4) inserted (31.12.2020 immediately before S.I. 2019/465 comes into force) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1359), reg. 1, Sch. 1 para. 13

F4Words in Sch. 1 para. 67(5) inserted (31.12.2020 immediately before S.I. 2019/465 comes into force) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1359), reg. 1, Sch. 1 para. 13

Commencement Information

I2Sch. 1 para. 67 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendments to Annex 4U.K.

68.  In Annex 4 (product areas and requirements for TABs), in table 2, in the requirement set out in the third column in relation to the first three competences—

[F5(a)in point b, for “the Member States where it is designated” substitute “Great Britain”;]

(b)in point e, for “harmonised” substitute “ designated ”.

Textual Amendments

Commencement Information

I3Sch. 1 para. 68 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendments to Annex 5U.K.

69.—(1) Annex 5 (assessment and verification of constancy of performance) is amended as follows.

(2) In points 1.1 to 1.5, for “notified”, in each place it occurs, substitute “ approved ”.

(3) In point 1.6—

(a)for “European”, in both places (including the heading) substitute “ UK ”;

(b)for “Notified”, in both places, substitute “ Approved ”.

(4) In point 2, for “notified”, in each place it occurs, substitute “ approved ”.

(5) In point 3, in the heading, for “notifications” substitute “ approvals ”.

Commencement Information

I4Sch. 1 para. 69 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources