Article 38

SCHEDULE 14E+W+SDOCUMENTS AND PLANS TO BE CERTIFIED

Commencement Information

I1Sch. 14 in force at 3.4.2019, see art. 1

[F1Table 11

(1)Document name(2)Document reference(3)Revision number(4)Date
access road visibility splay plan (contained in appendix 2.1 of appendix 12.1 of the environmental statement)Drawing reference 31116/2001/008BApril 2018
book of reference4.33August 2018
design principles statement10.20October 2017
environmental statement, Main statement6.10October 2017
Appendix Volume A: 1.1 Glossary6.20October 2017
Appendix Volume B: 1.2 Scoping Report and Scoping Opinion6.20October 2017
Appendix Volume C: 2.6-2.14 Legislation and Policy6.20October 2017
Appendix Volume D: 3.1 Mitigation Roadmap6.20October 2017
Appendix Volume E: 3.2 Outline CEMP6.22July 2018
Appendix Volume F: 5.1 CHP Statement6.20October 2017
Appendix Volume G: 6.1-6.3 Air Quality6.20October 2017
Appendix Volume H: 7.1 Noise6.20October 2017
Appendix Volume H: 7.2 and 7.3 Noise6.21April 2018
Appendix Volume I: 8.1-8.5 Ecology6.20October 2017
Appendix Volume J: 10.1 Ground Conditions6.20October 2017
Appendix Volume K: 11.1 and 11.2 LVIA6.20October 2017
Appendix Volume K: 11.3 LVIA6.21April 2018
Appendix Volume L: 12.1 TA (save in respect of Appendix 2.1)6.20October 2017
Appendix Volume L: Appendix 2.1 of the TA

6.2

Drawing reference 31116/2001/0008

BApril 2018
Appendix Volume M: 13.1-13.3 Historic Environment6.20October 2017
Appendix Volume N: 15.1 Electric and Magnetic Fields Assessment Report6.20October 2017
Figures (save in respect of Figure 11.1)6.30October 2017
Figure 11.16.31April 2018
Non-technical summary6.40October 2017
the indicative site layout plans2.32June 2019
land plans2.52June 2019
the low level restoration scheme baseline works planDrawing reference: J0008128-4090April 2018
the outline construction environment management plan (contained in appendix 3.2 of the environmental statement)6.22July 2018
the outline construction traffic management measures (contained in the outline construction environment management plan and appendices 5.2 to 5.5 of appendix 12.1 of the environmental statement)6.20October 2017
the outline landscape and ecological mitigation and management strategy (contained in appendix 11.2 of the environmental statement)6.22June 2019
the outline lighting strategy (contained in appendix 11.3 of the environmental statement)6.20October 2017
the outline travel plan (contained in appendix 12.1 of the environmental statement)6.20October 2017
the rights of way, streets and access plan2.73June 2019
Works plans2.62June 2019]

Textual Amendments