Article 2, 3, 5

SCHEDULE 1AUTHORISED DEVELOPMENT

In the County of Nottinghamshire and District of Bassetlaw a nationally significant infrastructure project as defined in sections 14(1) (nationally significant infrastructure projects: general) and 15 (generating stations) of the 2008 Act, comprising—

Work No.1 — a gas fired generating station located on the West Burton Power Station Site with a gross electrical output capacity of up to 299MW comprising—

(a)up to 5 OCGT units and associated generators, potentially housed within buildings with stacks, transformers, air inlet filters and exhaust gas diffusers;

(b)associated switchgear and ancillary equipment; and

(c)auxiliary closed loop cooling equipment/system.

Work No.1 may also include a banking compound comprising up to 6 transformers, overhead busbars, cable sealing ends and associated switchgear and ancillary equipment.

Work No.2 – a gas receiving area, gas treatment and control facilities, a compression station, generator and other auxiliary control cabinets and equipment.

Work No.3 – electrical connection works comprising—

Work No. 3A – up to 400 kV electrical cables and control systems cables to and from the existing West Burton B switchyard; and

Work No. 3B – works within or adjacent to the existing West Burton B switchyard, including electrical cables, connections to busbars and upgraded or replacement equipment.

Work No.4 – auxiliary buildings, structures and equipment, comprising—

(a)emergency diesel generator and associated diesel fuel tank;

(b)contained road tanker diesel unloading area;

(c)workshop, store, control, administration and welfare building;

(d)above ground raw water and fire water storage tanks and associated infrastructure;

(e)area of hardstanding for maintenance laydown and erection of temporary buildings associated with the commissioning, operation and maintenance of the OCGT units;

(f)pipework, pipe runs and pipe racks;

(g)fire-fighting equipment, buildings and distribution pipework; and

(h)chemical storage facilities, other minor infrastructure and auxiliaries/services.

Work No. 5 – a new surface water drainage system comprising pond or a tank or similar including connection to an existing surface water drainage system on the West Burton Power Station Site.

Work No. 6 – gas supply pipeline connection works for the transport of natural gas to Work No. 1 from an existing gas receiving facility within West Burton B comprising -

Work No. 6A - on or below ground high pressure steel pipeline of up to 500 millimetres (nominal bore) in diameter and up to 150 metres in length including controls and instrumentation; and

Work No. 6B - an extension to the existing West Burton B gas receiving facility comprising –

(i)an offtake connection;

(ii)gas compressor (if required);

(iii)above and below ground valves, flanges and pipework;

(iv)an above or below ground remotely operated valve;

(v)an above or below ground remotely operated valve bypass;

(vi)an above or below ground pressurisation bridle;

(vii)instrumentation and electrical kiosks; and

(viii)telemetry equipment kiosks and communications equipment.

Work No. 7 – water supply and pipeline from Work No. 1 to an existing water supply within West Burton B.

Work No. 8 – low voltage electrical, control, metering and other cables and associated switchgear and ancillary equipment and cabinets required to connect Work Nos 1- 6 with West Burton B.

Associated development within the meaning of section 115(2(2)) of the 2008 Act in connection with Work Nos. 1 - 8 comprising—

Work No. 9 – a rail offloading area from the existing rail loop ‘merry-go-round’ on the West Burton Power Station site.

Work No. 10 – a Landscaping and Biodiversity Management and Enhancement Area.

And to the extent that it does not otherwise form part of any such works, further associated development within the meaning of section 115(2) of the 2008 Act comprising such other works or operations as may be necessary or expedient for the purpose of or in connection with the construction, operation and maintenance of the works in this Schedule whether or not shown on the land plans, Order limit plans and works plans and falling within the scope of the works assessed in the environmental statement comprising—

(a)vehicle parking and cycle storage facilities;

(b)construction laydown areas and contractor facilities including materials and plant storage and laydown areas; generators; concrete batching facilities; vehicle and cycle parking facilities; pedestrian and cycle routes and facilities; offices and staff welfare facilities; security fencing and gates; external lighting; roadways and haul routes; wheel wash facilities; and signage;

(c)internal access roads, roadways and footpaths;

(d)noise attenuation features;

(e)landscaping, fencing and security provisions; and

(f)lighting columns and lighting.

(1)

The are no relevant amendments to section 14 or section 15.

(2)

There are no relevant amendments to section 115(2).

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources