- Latest available (Revised)
- Original (As made)
This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
5.—(1) Subject to paragraph (3), Network Rail may construct and maintain within the Order limits such works as are required—
(a)to provide the public rights of way to the extent specified in column (4) of Part 1 of Schedule 1 (closure of level crossings);
(b)in connection with the extinguishment of the rights of way specified in column (3) of Part 1 and column (3) of Part 2 of Schedule 1; and
(c)in connection with the redesignation of the highways specified in column (1) and (2) of Schedule 2 (redesignation of highways) to the extent specified in column (2);
including—
(d)works to lay out footpaths, footways, bridleways and cycle tracks, including any surfacing, fencing, stiles, gates, signs, ramps, steps, other means of access, and mounting blocks;
(e)works or other operations, for the purposes of drainage and flood prevention, including embankments, including ground reprofiling, culverts and retention ponds;
(f)works or other operations to level or stabilise the condition of any land, including ground reprofiling and embankments;
(g)works to install or alter the position of apparatus, including mains, sewers, drains and cables;
(h)works in the highway including provision of lighting, bollards and other traffic restraint systems, and signage,
or other conveniences as may be necessary or expedient for the purposes of the provision of or extinguishment of the rights of way or redesignation of highways.
(2) Subject to paragraph (3), Network Rail may carry out such other works (of whatever nature) as may be necessary or expedient for the purposes of, or for purposes ancillary to, the construction of the authorised works described in paragraph (1).
(3) Paragraphs (1) and (2) only authorise the carrying out or maintenance of works if such works are carried out on—
(a)land specified in columns (1) and (2) of Schedule 3 (land in which only new rights etc. may be acquired) for the purposes specified in column (3) of that Schedule; or
(b)land specified in columns (1) and (2) of Schedule 4 (land of which temporary possession may be taken) for the purposes specified in column (3) of that Schedule.
(4) Network Rail may, within the Order limits—
(a)carry out and maintain landscaping and other works to mitigate any adverse effects of the construction, maintenance and operation of the authorised works (other than works authorised by this paragraph); and
(b)carry out and maintain works for the benefit or protection of land affected by the authorised works (other than works authorised by this paragraph).
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: