xmlns:atom="http://www.w3.org/2005/Atom"

SCHEDULES

Article 23(2)

SCHEDULE 5LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED

(1)

Plot Reference Number shown on Land Plans

(2)

Purpose for which rights over land may be acquired

Land Plans – Sheet 1
1/34cTo construct, operate, access and maintain Skippool bridge (Work No.25)
Land Plans – Sheet 4
4/02e, 4/06iTo construct, operate, access and maintain a culvert/ditch outfall (Work No.41)
4/06j, 4/08hTo construct, operate, access and maintain a culvert/ditch outfall (Work No.96)
4/08iTo construct, operate, access and maintain a culvert/ditch outfall (Work No.44)
4/08jTo construct, operate, access and maintain a culvert/ditch outfall (Work No.45)
4/08kTo operate, access and maintain a bridge
Land Plans – Sheet 5
5/01mTo operate, access and maintain a bridge
5/01n, 5/02a, 5/02, 5/01d, 5/03, 5/04, 5/05a, 5/06fTo operate, access and maintain a drainage outfall (Work No.62)
5/14a, 5/13c, 5/09g, 5/13bTo construct, operate, access and maintain Lodge Lane Bridge (Work No.70)
Land Plans – Sheet 7
7/10, 7/04e, 7/04dTo construct, operate, access and maintain a culvert/ditch outfall (Work No.92)