xmlns:atom="http://www.w3.org/2005/Atom"
Article 23(2)
(1) Plot Reference Number shown on Land Plans | (2) Purpose for which rights over land may be acquired |
---|---|
Land Plans – Sheet 1 | |
1/34c | To construct, operate, access and maintain Skippool bridge (Work No.25) |
Land Plans – Sheet 4 | |
4/02e, 4/06i | To construct, operate, access and maintain a culvert/ditch outfall (Work No.41) |
4/06j, 4/08h | To construct, operate, access and maintain a culvert/ditch outfall (Work No.96) |
4/08i | To construct, operate, access and maintain a culvert/ditch outfall (Work No.44) |
4/08j | To construct, operate, access and maintain a culvert/ditch outfall (Work No.45) |
4/08k | To operate, access and maintain a bridge |
Land Plans – Sheet 5 | |
5/01m | To operate, access and maintain a bridge |
5/01n, 5/02a, 5/02, 5/01d, 5/03, 5/04, 5/05a, 5/06f | To operate, access and maintain a drainage outfall (Work No.62) |
5/14a, 5/13c, 5/09g, 5/13b | To construct, operate, access and maintain Lodge Lane Bridge (Work No.70) |
Land Plans – Sheet 7 | |
7/10, 7/04e, 7/04d | To construct, operate, access and maintain a culvert/ditch outfall (Work No.92) |