PART 1PRELIMINARY
Interpretation2.
(1)
In this Order, unless otherwise stated—
“AB Ports” means Associated British Ports, (company number ZC000195), whose registered office address is 25 Bedford Street, London WC2E 9ES;
“address” includes any number or address for the purposes of electronic transmission;
“apparatus” has the same meaning as in Part 3 of the 1991 Act;
“appointed person” means—
(a)
a person acting in the course of that person’s duties who—
- (i)
is an employee, agent, contractor or sub-contractor of the undertaker; or
- (ii)
is authorised by the undertaker to exercise one or more of its functions under this Order; or
(b)
“authorised development” means the development described in Schedule 1 (authorised development) and any other development within the meaning of section 32 of the 2008 Act that is authorised by this Order;
“book of reference” means the document of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the book of reference for the purposes of this Order;
“building” includes any structure or erection or any part of a building, structure or erection;
“capital dredge” means a dredge which comprises the excavation of the seabed, in an area or down to a level (relative to ordnance datum) not previously dredged during the preceding 10 years;
“carriageway” has the same meaning as in the 1980 Act;
“classification of roads plan” means the plans of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the classification of roads plan for the purposes of this Order;
“construct” includes carrying out, placing, altering, replacing, relaying and removal and “construction” is to be construed accordingly;
“electronic transmission” means a communication transmitted—
(a)
by means of an electronic communications network; or
(b)
by other means but in an electronic form;
“engineering section drawings and plans” means the documents of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the engineering section drawings and plans for the purposes of this Order;
“environmental statement” means the documents of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the environmental statement for the purposes of this Order;
“footpath” and “footway” have the same meaning as in the 1980 Act;
“general arrangement plans” means the plans of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the general arrangement plans for the purposes of this Order;
“harbour limits plan” means the plan of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the harbour limits plan for the purposes of this Order;
“harbour master” means the harbour master appointed by the harbour authority and includes that person’s authorised deputies and assistants;
“highway” and “highway authority” have the same meaning as in the 1980 Act;
“interim design guidance manual” means the document of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the interim design guidance manual for the purposes of this Order and which sets out the principles for the detailed design of the authorised development;
“Lake Lothing” means the navigable saltwater lake within the town of Lowestoft in the area of East Suffolk Council between the North Sea and Oulton Broad, as identified by reference points 652111E, 292801N, 655207E, 292615;
“land plans” means the plans of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the land plans for the purposes of this Order;
“level of high water” means the level of mean high water springs;
“limits of deviation” means the limits of deviation referred to in article 5 (limits of deviation);
“limits of dredging” means the lines marked “limits of dredging” on the limits of dredging plan;
“limits of dredging plan” means the plan of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the limits of dredging plan for the purposes of this Order;
“local highway authority” means Suffolk County Council in its role as highway authority for the county of Suffolk pursuant to the 1980 Act;
“local planning authority” means East Suffolk Council, or any successor to it as planning authority;
“Lowestoft Harbour” means the harbour over which the harbour authority has jurisdiction as is delineated on the harbour limits plan together with any quays, docks or other land held in connection with that harbour;
“maintain” includes inspect, repair, adjust, alter, remove, replace, or reconstruct in relation to the authorised development and any derivative of “maintain” is to be construed accordingly;
“maintenance dredge” means any activity which comprises the removal of recently-accumulated sediments such as mud, sand and gravel in order to keep channels, berths and other areas at their designed depths and which takes place in circumstances where—
(a)
the level of the seabed to be restored by the dredging is not lower than it has been at any time during the past 10 years; and
(b)
there is evidence that dredging has previously been undertaken to that level (or lower) during that period;
“MMO” means the Marine Management Organisation;
“mooring” means any buoy, pile, post, chain, pillar, pontoon, fixed rail or like apparatus or convenience provided or used for the mooring of vessels;
“new bridge” means Work Nos. 1B, 1C, 1D and 1E (including without limitation the piers, bridge deck, carriageway and parapets);
“new bridge area” means the new bridge, the new bridge approaches, the new bridge control building area and the new bridge infrastructure, as shown on the new bridge area plans;
“new bridge approaches” means the northern and southern approaches to the new bridge (respectively “the new bridge northern approach” and “the new bridge southern approach”), the centrelines of which are shown on the new bridge area plans;
“new bridge area plans” means the plans of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the new bridge area plans for the purposes of this Order;
“new bridge control building area” means the area outlined in green on Sheet 2 of the new bridge area plans;
“new bridge infrastructure” means the infrastructure elements supporting the new bridge including (without limitation) the cables, drainage, electricity and water supplies, and fenders relating to the new bridge, as well as any plant and machinery and any emergency, safety or communications equipment required for the construction, maintenance or operation of the new bridge;
“Order land” means the land shown coloured pink and the land shown coloured blue on the land plans and which is described in the book of reference;
“Order limits” means the limits of land to be acquired permanently or used temporarily as shown on the land plans, and the limits of land within which the authorised development, as shown on the works plans, may be carried out;
“
” means the document of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the preliminary navigation risk assessment for the purposes of this Order and which sets out the measures to be undertaken to ensure that risks to navigation from the construction and operation of the new bridge are as low as reasonably practicable;“PMSC Stakeholder Group” means the group comprising the group maintained and consulted by the harbour authority in accordance with its duties under the Port Marine Safety Code, and the undertaker;
“rights of way and access plans” means the plans of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the rights of way and access plans for the purposes of this Order;
“Scheme of Operation” means the document of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the scheme of operation for the purposes of this Order, or any variation to or replacement of that scheme approved by the harbour authority or the undertaker under article 41(2), or by the Secretary of State under article 41(5), as the case may be;
“statutory undertaker” means any statutory undertaker for the purposes of section 127(8) (statutory undertakers’ land) of the 2008 Act;
“statutory utility” means—
(a)
a statutory undertaker; or
(b)
“street” means a street within the meaning of section 48 (streets, street works and undertakers) of the 1991 Act, together with land on the verge of a street or between two carriageways, and includes part of a street;
“street authority”, in relation to a street, has the same meaning as in Part 3 of the 1991 Act;
“tidal work” means so much of any work authorised by this Order as is in, under or over tidal waters or tidal lands below the level of high water;
“traffic regulation measures plans” means the plans of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the traffic regulation measures plans for the purposes of this Order;
“tree preservation order trees location plan” means the plan of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the tree preservation order trees location plan for the purposes of this Order;
“tribunal” means the Lands Chamber of the Upper Tribunal;
“Trinity House” means the Corporation of Trinity House of Deptford Strond;
“undertaker” means Suffolk County Council of Endeavour House, 8 Russell Road, Ipswich, Suffolk IP1 2BX;
“watercourse” includes all rivers, streams, ditches, drains, canals, cuts, culverts, dykes, sluices, sewers and passages through which water flows except a public sewer or drain; and
“works plans” means the plans of that description as referenced in Schedule 14 (documents to be certified) certified by the Secretary of State as the works plans for the purposes of this Order.
(2)
References in this Order to rights over land include references to rights to do or to place and maintain, anything in, on or under land or in the airspace above its surface and references in this Order to the imposition of restrictive covenants are references to the creation of rights over land which interfere with the enjoyment of interests or rights and are for the benefit of land which is acquired under this Order or is otherwise comprised in the Order land.
(3)
All distances, directions and lengths referred to in this Order are approximate and distances between points on a work comprised in the authorised development are taken to be measured along that work.
(4)
For the purposes of this Order, all areas described in square metres in the book of reference are approximate.
(5)
References in this Order to points identified by letters or numbers are to be construed as references to points so lettered or numbered on the plan to which the reference applies.
(6)
References in this Order to numbered works are references to the works as numbered in Schedule 1 (authorised development).