The Lake Lothing (Lowestoft) Third Crossing Order 2020

Status:

This is the original version (as it was originally made).

Principal powers

Development consent, etc., granted by the Order

4.—(1) Subject to the provisions of this Order, including the requirements in Schedule 2 (requirements), the undertaker is granted development consent for the authorised development to be carried out within the Order limits.

(2) Any enactment applying to land within, adjoining, or sharing a common boundary with the Order limits has effect subject to the provisions of this Order.

Limits of deviation

5.—(1) Subject to the following provisions of this article, the undertaker must construct the authorised development within the Order limits.

(2) In constructing and maintaining the non-linear works comprised in the authorised development, the undertaker may deviate laterally within the limits of deviation for those works shown on the works plans.

(3) In constructing or maintaining the linear works comprised in the authorised development—

(a)in the case of linear works for which limits of deviation are shown on the works plans, the undertaker may deviate laterally from the lines or situations shown on those plans to the extent of the limits of deviation; and

(b)in the case of linear works for which limits of deviation are not shown on the works plans, the undertaker may deviate laterally from the lines or situations shown on those plans to the extent of the Order limits.

(4) In constructing and maintaining the part of the new bridge comprising Work No.1D, the undertaker—

(a)must not, unless otherwise agreed with the harbour authority, construct any tidal work within the part of Lake Lothing which is located between the two areas identified in paragraph (5); and

(b)must safeguard the width of the navigable channel within Lake Lothing by preserving a distance of no less than 32 metres between the outer edge of the fenders referred to in each of paragraphs (5)(a) and (5)(b).

(5) The two areas referred to in paragraph (4) are—

(a)in relation to the pier located to the south of the north quay of Lowestoft Harbour, the area between the north quay wall and the outer edge of the fenders surrounding that pier; and

(b)in relation to the pier located to the north of the south quay of Lowestoft Harbour, the area between the south quay wall and the outer edge of the fenders surrounding that pier.

(6) In constructing and maintaining the authorised development, the undertaker may deviate vertically from the levels shown on the engineering section drawings and plans—

(a)to any extent upwards as the undertaker considers to be necessary or convenient but not exceeding 0.5 metres or, in relation to the parts of the authorised development referred to in column (1) of the table below, not exceeding the limit for each such part set out in the corresponding entry in column (2) of that table; and

(b)subject to paragraph (7), to any extent downwards as the undertaker considers to be necessary or convenient, except in relation to the parts of the authorised development referred to in column (1) of the table below, where the extent of permitted downwards deviation for each such part is set out in the corresponding entry in column (3) of that table.

(1)

Numbered Work

(2)

Upwards vertical limit of deviation

(3)

Downwards vertical limit of deviation

Work No. 1A1 metre1.5 metres
Work No. 1B1 metre2.3 metres
Work No. 1C1 metre4 metres
Work No. 1D1 metre2.5 metres
Work No. 1E1 metre1.1 metres
Work No. 51.5 metres-
Work No. 65 metres2.5 metres

(7) Paragraph (6)(b)

(a)does not prevent the undertaker, in constructing the piles comprising part of each of Work Nos. 1B, 1C, 1D and 1E, from deviating to any extent downwards as the undertaker considers to be necessary or convenient;

(b)does not permit the undertaker in constructing the bridge deck between piers within Lake Lothing, comprising part of Work No. 1D, to deviate downwards to a level which is less than 12 metres above Highest Astronomical Tide;

(c)does not prevent the undertaker, in constructing the lifting elements of the superstructure of the new bridge, comprising part of Work No. 1D, from deviating by up to 2.5 metres above the levels shown on the engineering section drawings and plans (mainline long section sheet 2 of 2), and to any extent downwards as the undertaker considers to be necessary or convenient; and

(d)does not permit the undertaker in constructing the bridge deck comprising part of Work No. 1B, to deviate downwards to a level which provides less than 4.9 metres headroom above the running rail of the railway.

(8) The undertaker must not undertake any capital dredge to a depth lower than—

(a)6.4m below chart datum in respect of works in Lake Lothing except Work No.7; and

(b)3m below chart datum in respect of Work No.7,

unless the undertaker has demonstrated to the MMO and the MMO has agreed in writing that dredging to a depth lower than those set out in sub-paragraphs (a) and (b) would not give rise to any materially new or materially different environmental effects than those assessed in the environmental statement.

(9) Without limitation on the scope of paragraphs (2) to (7) in constructing or maintaining the authorised development the undertaker may—

(a)deviate by up to 3 metres from the points of commencement and termination of any of the linear works, except in the case of the coterminous point of termination and commencement of Work Nos 1A and 1B, from which the undertaker may deviate by up to 10 metres in a north-easterly direction following the centreline of Work No. 1A, and by up to 3 metres in a south-westerly direction following the centreline of Work No. 1B; and

(b)deviate from the design of the new bridge or bridge structure shown on the engineering section drawings and plans, provided that any such deviation is in accordance with the final version of the design guidance manual approved under paragraph 3(2) of Schedule 2.

(10) In this article, references to—

(a)“linear works” are references to any works shown on the works plans by way of centre lines; and

(b)“non-linear works” are references to any other works shown on the works plans.

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources