The Lake Lothing (Lowestoft) Third Crossing Order 2020

Concrete and cementE+W

10.—(1) The licence holder must ensure that waste concrete, slurry or wash water from concrete or cement activities are not discharged, intentionally or unintentionally, into the marine environment.

(2) Unless otherwise agreed in writing by the MMO in approving a construction method statement under condition 4, the licence holder must contain and site concrete and cement mixing and washing areas away at least 10 metres away from Lake Lothing or any surface water drain to minimise the risk of run off entering Lake Lothing or any surface water drain.

(3) If concrete is to be sprayed, suitable protective sheeting must be provided to prevent rebounded or windblown concrete from entering the marine environment.

(4) Rebounded concrete material must be cleared away before protective sheeting is removed.

Commencement Information

I1Sch. 12 para. 10 in force at 21.5.2020, see art. 1