The West Midlands Rail Freight Interchange Order 2020

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: SCHEDULE 1

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The West Midlands Rail Freight Interchange Order 2020, SCHEDULE 1. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Article 2

SCHEDULE 1U.K.AUTHORISED DEVELOPMENT

PART 1 U.K.NSIP: THE CONSTRUCTION OF A RAIL FREIGHT INTERCHANGE

In the County of Staffordshire and the District of South Staffordshire—

Works No. 1

Within the area of land described on the works plans as Works No. 1—

The construction of a new railway line from the rail freight terminal (Works No. 2) to connect with the existing West Coast Main Line Loop railway line the general arrangement of which is shown on the illustrative arrangement of railway alignment plan and including—

(a)construction of a new railway track and associated rail infrastructure;

(b)formation of new railway embankments and all necessary earthworks and drainage;

(c)new arrival and departure rail tracks adjacent to the existing railway;

(d)the alteration of the existing railway infrastructure including points and signals;

(e)acoustic and security fencing;

(f)temporary drainage lagoon;

(g)the removal of telecommunications mast;

(h)the removal of Footpath 29 footbridge over the West Coast Main Line Loop railway;

(i)works to accommodate the removal of masonry bridge (part of existing Gravelly Way) over the West Coast Main Line Loop railway;

(j)the removal and replacement of pipework and boreholes associated with the remediation strategy for the SI land;

(k)the stopping up of Gravelly Way to the east and west of the existing railway bridge;

(l)the stopping up of the length of Footpath 29 shown on the access and rights of way plans;

(m)the construction of new maintenance access points to the east and west of the West Coast Main Line Loop railway including interface with Works No. 6; and

(n)the construction of a new culvert under the rail lines to connect services either side of the West Coast Main Line Loop railway.

Works No. 2

Within the area of land described on the works plans as Works No. 2—

The construction of a rail freight terminal, the general arrangement of which is shown on the rail terminal – illustrative expanded rail terminal layout plan, to connect with the rail infrastructure described in Works No. 1 including—

(a)earthworks to achieve a terminal plateau;

(b)access and circulation roads;

(c)an intermodal rail freight loading/unloading terminal including—

(i)rail sidings to load/unload freight;

(ii)freight storage areas; and

(iii)gantry cranes and reach stackers;

(d)railtracks and associated rail infrastructure;

(e)drainage and attenuation ponds;

(f)security fencing;

(g)cripple sidings, rail freight terminal refuelling and maintenance areas;

(h)alteration of the existing rail infrastructure including signalling;

(i)terminal entry and exit gates, loading lanes, internal roads, gatehouses and vehicle/cycle parking areas;

(j)rail freight terminal gateway/office including staff and visitor welfare facilities;

(k)storage and workshop buildings;

(l)the removal and replacement of pipework and boreholes associated with the remediation strategy for the SI land;

(m)works to accommodate removal of bridge over West Coast Main Line Loop railway; and

(n)the stopping up of Gravelly Way.

Works No. 3

Within the area of land described on the works plans as Works No. 3—

(1) The construction of rail served warehousing (including ancillary offices and other buildings) within the areas annotated as Zones A1 to A7 including—

(a)earthworks to provide development plateaus;

(b)construction of development plateaus;

(c)warehouses and ancillary buildings such as gatehouses;

(d)service yards and vehicle/cycle parking;

(e)rail infrastructure within Zones A1 and A2 to facilitate rail connected warehousing;

(f)vehicle access routes;

(g)solar energy provision;

(h)vehicle maintenance units including washing and refuelling;

(i)vehicle electricity charging facilities;

(j)container storage;

(k)removal of telecommunication masts;

(l)the removal and replacement of pipework and boreholes associated with the remediation strategy for the SI land;

(m)drainage and attenuation structures;

(n)on plot landscaping and bunding;

(o)signage; and

(p)the stopping up of the length of Footpath 29 shown on the access and rights of way plans.

(2) The demolition of existing farmhouses and associated outbuildings, other buildings and structures.

Works No. 4

Within the area of land described on the works plans as Works No. 4—

The A5/A449 link road the general arrangement of which is shown on the highway general arrangement plans and bridge plans including—

(a)footways and cycleways;

(b)construction of a new three arm roundabout on the A5;

(c)construction of a left in and left out junction with Harrisons Lane;

(d)construction of a new four arm roundabout on the A449;

(e)new bridges over the railway and canal as shown on the bridge plans;

(f)works comprising the interface with Works Nos. 5 and 7;

(g)removal of existing laybys on the A5;

(h)closure of the existing accesses on the A5 as shown on the access and rights of way plans;

(i)upgrading of existing footway on the north side of the A5 to a cycleway;

(j)bus stops and bus laybys on the A5/A449 link road;

(k)bus laybys on the A449;

(l)removal of bridge over West Coast Main Line Loop railway;

(m)street lighting;

(n)construction of new maintenance access points to the rail lines on the east and west (the latter through the rail terminal) of the West Coast Main Line Loop railway;

(o)drainage and attenuation structures;

(p)diversion and culverting of the existing canal feeder drain; and

(q)installation of new service crossings below the public highway.

Works No. 5

Within the area of land described on the works plans as Works No. 5—

(1) The construction of infrastructure the general arrangement of which is shown on the highway general arrangement plans including—

(a)principal on site private estate roads and associated junctions;

(b)works comprising the interfaces with Works Nos. 4 and 7;

(c)footways and cycleways;

(d)signage;

(e)street lighting; and

(f)bus stop.

(2) The demolition of buildings and structures.

PART 2 U.K.ASSOCIATED DEVELOPMENT

Associated development within the meaning of section 115(2) M1 (development for which development consent may be granted) of the 2008 Act comprising—

Marginal Citations

M1Section 115(2) was amended by section 160(1) and (3) of the Housing and Planning Act 2016 (s. 22) and section 43(1) and (2) of the Wales Act 2017 (c. 4).

In the County of Staffordshire and the District of South Staffordshire—

Works No. 6

Within the area of land described on the works plans as Works No. 6—

The provision of structural landscaping and two community parks including—

(a)a community park in the location identified as Croft Lane Community Park on the parameters plans;

(b)a community park in the location identified as Calf Heath Community Park on the parameters plans;

(c)earthworks including the creation of screening bunds;

(d)drainage and attenuation structures;

(e)boundary treatments including acoustic fencing;

(f)habitat creation;

(g)canal enhancement;

(h)demolition of buildings and structures;

(i)retention of existing woodland;

(j)vehicle and pedestrian accesses to Zones A2 to A7;

(k)removal of two steel pipe bridges and a concrete bridge over the canal;

(l)the removal and replacement of pipework and boreholes associated with the remediation strategy for the SI land;

(m)the stopping up of the length of Footpath 29 shown on the access and rights of way plans;

(n)the stopping up of Gravelly Way and landscaping/highway verge associated with the revised highway arrangements to Four Ashes industrial area;

(o)closure of private accesses as shown on the access and rights of way plans (Document 2.3);

(p)vehicle access and parking and cycle parking facilities within community parks;

(q)cycle track adjacent to Zone A6;

(r)new public car parks for the community parks;

(s)diversion of the existing land drainage network;

(t)interface with Works Nos. 1 and 10a for the construction of new maintenance access points to the east of the West Coast Main Line Loop railway;

(u)the construction of culverts under the A449 adjacent to Zone A1 and, if necessary, adjacent to Zone A2 as an alternative to use of the existing culvert situated adjacent to Zone A2, under Vicarage Road between Zone A5b and A7c and under Straight Mile south of Zone A7c to connect services either side of the public highway;

(v)the construction of a new culvert under the West Coast Main Line Loop railway, and under the Staffordshire and Worcestershire Canal to connect services either side of the rail lines and the canal; and

(w)construction of new drainage outfalls to Staffordshire and Worcestershire Canal and the existing ditch along Woodlands Lane.

Works No. 7

Within the area of land described on the works plans as Works No. 7—

Works to the public highway the general arrangement of which is shown on the highway general arrangement plans including—

(a)upgrading of the existing footway on the north side of the A5 to a cycleway/footway;

(b)works of improvement to the A449 including—

(i)removal of the A449/Station Drive right turn lane;

(ii)upgrading the cycleway/footway along the east side of the A449 from Station Drive to the A5; and

(iii)laybys on the west and east side of the A449 between Gravelly Way and the A5;

(c)realignment of Vicarage Road and provision of access roundabout;

(d)the closure of three gaps in the central reservation on the A449 between the A5 and Gravelly Way;

(e)closure of the existing access on the A449 as shown on the access and rights of way plans;

(f)works comprising the interfaces with Work Nos. 4 and 5;

(g)the addition of cycleway/footway along a length of Vicarage Road from the south-east corner of Zone A6 to the new roundabout;

(h)provision of a pedestrian/cycle crossing point along Vicarage Road to the south west of the new access roundabout;

(i)provision of HGV turning area on Station Drive to the west of the railway bridge;

(j)the provision of two pedestrian/cycle crossing points along Straight Mile between Vicarage Road and Kings Road;

(k)amendments to Crateford Lane to create a one-way road;

(l)closure of the existing accesses on the A5 as shown on the access and rights of way plans;

(m)upgrading of existing footway on the north side of the A5 to a cycleway;

(n)an amended left in/left out junction to The Poplars;

(o)improved visibility splay at the junction of Vicarage Road and Straight Mile;

(p)footway works at junction of Straight Mile and Woodlands Lane with Kings Road including pedestrian crossing points;

(q)installation of new service crossings below the public highway;

(r)the construction of culverts under the A449 adjacent to Zone A1 and, if necessary, adjacent to Zone A2 as an alternative to use of the existing culvert situated adjacent to Zone A2, under Vicarage Road between Zone A5b and A7c and under Straight Mile south of Zone A7c to connect services either side of the public highway;

(s)signage; and

(t)street lighting.

Works No. 8

Within the area of land described on the works plans as Works No. 8—

(1) Conversion of Gravelly Way Farm buildings to use for the purposes of estate management offices, training facilities, meeting rooms, amenity and welfare facilities, with ancillary parking and landscaping.

(2) Provision of buildings for the storage of estate management plant and machinery, and related workshop facilities.

Works No. 9a

Within the area of land described on the works plans as Works No. 9a—

(a)the removal and replacement of the existing 132kv tower with a new terminal tower;

(b)restringing to the new terminal tower;

(c)installation of underground cabling to connect into the underground cabling in Works No. 4; and

(d)a temporary access and set down and assembly area for the demolition of existing tower and construction of new tower to include a temporary office and welfare facility.

Works No. 9b

Within the area of land described on the works plans as Works No. 9b—

(a)the removal and replacement of the existing 132kv tower with a new terminal tower;

(b)restringing to the new terminal tower;

(c)installation of underground cabling to connect into the underground cabling in Works No. 6; and

(d)a temporary access and set down and assembly area for the demolition of existing tower and construction of new tower to include a temporary office and welfare facility.

Works No. 10a

Within the area of land described on the works plans as Works No. 10a, the provision of revised access arrangements for the SI facility the general arrangement of which is shown on the highway general arrangement plans incorporating access also to Zone A3 and Works No. 8 including—

(a)an underpass under the A5/A449 link road;

(b)interface with Works Nos. 1 and 6 for the construction of new maintenance access points to the east of the West Coast Main Line Loop railway;

(c)interface with Works No. 3 (Zone A3);

(d)interface with Works No. 4;

(e)interface with Works No. 8;

(f)interface with Works No. 10b;

(g)at grade junction with the A5/A449 link road;

(h)footways/cycleways;

(i)footpaths/cycle tracks;

(j)signage;

(k)street lighting; and

(l)the construction of new maintenance access points to the east of the West Coast Main Line Loop railway.

Works No. 10b

Within the area of land described on the works plans as Works No. 10b and as shown on the access and rights of way plans (Document 2.3C), the provision of revised access arrangements to Four Ashes industrial area the general arrangement of which is shown on the highway general arrangement plans including—

(a)the provision of at grade access from the A5/A449 link road leading to an amended roundabout with new accesses off to adjacent land;

(b)closure of part of Gravelly Way to all traffic;

(c)retention of use of part of Gravelly Way to public cycle path and footpath proceeding under the A5/A449 link road to connect with the canal towpath;

(d)footpath/cycle track adjacent to the west of the new road leading to the amended roundabout; and

(e)the provision of footpath alongside Works No. 8, the access to Works No. 8 and Works No. 10a connecting to the footway/cycle way provided as part of Works No. 4.

Works No. 11

Within the area of land described on the works plans as Works No. 11, the provision of improved access to Avenue Cottages from the A5 including the provision of a turning area the general arrangement of which is shown on the highway general arrangement plans.

Further works

The following further works provided that such works do not give rise to any materially new or materially different significant effects on the environment that have not been assessed in the environmental statement or in any updated environmental information supplied under the 2017 EIA Regulations—

(1) Within the area of land described on the works plans as Works Nos. 1 to 3 the provision of—

(a)weighbridges;

(b)diversion and provision of utilities services including underground cabling to connect into Work Nos. 9a and 9b; and

(c)such other works as may be necessary or expedient for the purpose of or in connection with the construction of the authorised development.

(2) Within the area of land described on the works plans as Works Nos. 1 to 6 and Works No. 8 the provision of—

(a)bunds, embankments, swales, landscaping and boundary treatments, earthworks and earthwork retaining structures;

(b)the provision of footways, cycle tracks, permissive cycle tracks, bridleways and footpath linkages;

(c)water supply works, foul drainage provision, foul pumping stations, surface water management systems, balancing ponds (surface and underground), attenuation and culverting;

(d)connections to mains services and provision of utilities infrastructure including primary and secondary substations and pressure reducing stations;

(e)diversion and provision of utilities services including underground cabling to connect into Work Nos. 9a and 9b;

(f)the relocation/erection of telecommunications masts following the removal thereof as part of Works Nos. 1 and 3;

(g)demolition of surface structures;

(h)fencing and boundary treatments;

(i)temporary concrete batching plants;

(j)temporary construction compounds and materials and aggregate store;

(k)lighting;

(l)CCTV and vehicle monitoring equipment; and

(m)such other works as may be necessary or expedient for the purpose of or in connection with the construction of the authorised development.

(3) Within the area of land described on the works plans as Works Nos. 4, 5, 7, 10a, 10b and 11 the provision of—

(a)fencing;

(b)surface water drainage works;

(c)landscaping and boundary treatments;

(d)earthworks and earthwork retaining structures;

(e)pavements, surface treatments, kerbs and channels;

(f)traffic signs, traffic signals and road markings;

(g)diversion and provision of utilities services including underground cabling to connect into Work Nos. 9a and 9b;

(h)temporary earthworks material stockpiles; and

(i)such other works as may be necessary or expedient for the purpose of or in connection with the construction of the authorised development.

(4) Within the area of land described on the works plans as Works Nos. 1, 2, 3, 4, 6, 10a and 10b the stopping up of the public right of way shown coloured purple on sheet 7 of the access and rights of way plans if added to the definitive map pursuant to an order under section 53 (duty to keep definitive map and statement under continuous review) of the Wildlife and Countryside Act 1981.

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources