Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
1. Documents for certification that they are true copies of the documents referred to in this Order—U.K.
(1) Document/Plan | (2) Document Number | (3) Document date/Plan number with revision number |
---|---|---|
Access and rights of way plans | ||
Key Plan | 2.3 | WSP-70001979-SK-060 Rev I |
Sheet 1 | 2.3A | WSP-70001979-SK-060 Rev H |
Sheet 2 | 2.3B | WSP-70001979-SK-060 Rev G |
Sheet 3 | 2.3C | WSP-70001979-SK-060 Rev F |
Sheet 4 | 2.3D | WSP-70001979-SK-060 Rev F |
Sheet 5 | 2.3E | WSP-70001979-SK-060 Rev F |
Sheet 6 Sheet 7 | 2.3F 2.3G | WSP-70001979-SK-060 Rev F WSP-70001979-SK-060 Rev B |
The book of reference | 4.3B | 21 August 2019 |
The bridge plans | ||
Proposed road bridges plan and long section | 2.18A | 1516-04250WDK-SI-C-301-010 Rev P8 |
Proposed bridge B1 section and elevation | 2.18B | 1516-04250WDK-SI-C-301-006 Rev P11 |
Proposed road bridge B2 and B3 section and elevation | 2.18C | 1516-04250WDK-SI-C-301-006 Rev P11 |
Proposed road bridge B4 section and elevation | 2.18D | 1516-04250WDK-SI-C-301-008 Rev P14 |
The design and access statement | 7.5 | 3 August 2018 |
The environmental statement | 6.2 | 3 August 2018 (subject to the substitutions set out below): (i) Figures 10.001, 10.002, 10.003 and 10.004 – 12 September 2018; (ii) Annex 10.1.1 – 12 September 2018; (iii) Addendum to Chapter 13 (Noise and Vibration) – 5 April 2019 (iv) Appendix I to Transport Assessment (Appendix 15.1) (Site Wide HGV Management Plan) – 7 May 2019 (v) Appendix H to Transport Assessment (Appendix 15.1) (Site Wide Travel plan) – 5 July 2019 (vi) Appendix 2.3 (Outline Demolition and Construction Management Plan) – 5 July 2019 (vii) Appendix 10.4 (Framework Ecological Mitigation and Management Plan) – 5 July 2019 (viii) Updated Chapter 7 (Air Quality) and Appendices 7.2, 7.3, 7.4, 7.6 and 7.7 – 7 August 2019 |
The future highway maintenance plans | ||
Key Plan | 2.10 | WSP-70001979-SK-091 Rev F |
Sheet 1 | 2.10A | WSP-70001979-SK-091 Rev F |
Sheet 2 | 2.10B | WSP-70001979-SK-091 Rev C |
Sheet 3 | 2.10C | WSP-70001979-SK-091 Rev C |
The highway classification plans | ||
Key Plan | 2.13 | WSP-70001979-SK-068 Rev I |
Sheet 1 | 2.13A | WSP-70001979-SK-068 Rev H |
Sheet 2 | 2.13B | WSP-70001979-SK-068 Rev E |
Sheet 3 | 2.13C | WSP-70001979-SK-068 Rev E |
Sheet 4 | 2.13D | WSP-70001979-SK-068 Rev E |
The highway general arrangement plans | ||
Key Plan/Highway Masterplan | 2.9 | WSP-70001979-GA-100 Rev L |
General Arrangement Plan 101 | 2.9A | WSP-70001979-GA-101 Rev E |
General Arrangement Plan 102 | 2.9B | WSP-70001979-GA-102 Rev E |
General Arrangement Plan 103 | 2.9C | WSP-70001979-GA-103 Rev I |
General Arrangement Plan 104 | 2.9D | WSP-70001979-GA-104 Rev L |
General Arrangement Plan 105 | 2.9E | WSP-70001979-GA-105 Rev E |
General Arrangement Plan 106 | 2.9F | WSP-70001979-GA-106 Rev G |
General Arrangement Plan 107 | 2.9G | WSP-70001979-GA-107 Rev H |
General Arrangement Plan 108 | 2.9H | WSP-70001979-GA-108 Rev F |
General Arrangement Plan 109 | 2.9I | WSP-70001979-GA-109 Rev G |
General Arrangement Plan 110 | 2.9J | WSP-70001979-GA-110 Rev H |
General Arrangement Plan 111 | 2.9K | WSP-70001979-GA-111 Rev G |
The land plans | ||
Key Plan | 2.1 | Key Plan v1 |
Sheet 1 | 2.1A | Sheet 1 of 12 v0 |
Sheet 2 | 2.1B | Sheet 2 of 12 v0 |
Sheet 3 | 2.1C | Sheet 3 of 12 v0 |
Sheet 4 | 2.1D | Sheet 4 of 12 v1 |
Sheet 5 | 2.1E | Sheet 5 of 12 v0 |
Sheet 6 | 2.1F | Sheet 6 of 12 v0 |
Sheet 7 | 2.1G | Sheet 7 of 12 v0 |
Sheet 8 | 2.1H | Sheet 8 of 12 v0 |
Sheet 9 | 2.1I | Sheet 9 of 12 v0 |
Sheet 10 | 2.1J | Sheet 10 of 12 v0 |
Sheet 11 | 2.1K | Sheet 11 of 12 v0 |
Sheet 12 | 2.1L | Sheet 12 of 12 v0 |
Order limits plan | 2.4 | 4049-10 Rev 05 |
The parameters plans | ||
Development Zone Parameters Plan | ||
Key Plan | 2.5 | 4049-1030 Rev 07 |
Sheet 1 | 2.5A | 4049-1035 Rev 07 |
Sheet 2 | 2.5B | 4049-1036 Rev 07 |
Sheet 3 | 2.5C | 4049-1037 Rev 08 |
Sheet 4 | 2.5D | 4049-1038 Rev 06 |
Floor Levels and Building Heights Parameters Plan | ||
Key Plan | 2.6 | 4049-1031 Rev 07 |
Sheet 1 | 2.6A | 4049-1040 Rev 06 |
Sheet 2 | 2.6B | 4049-1041 Rev 06 |
Sheet 3 | 2.6C | 4049-1042 Rev 07 |
Sheet 4 | 2.6D | 4049-1043 Rev 06 |
Green Infrastructure Parameters Plan | ||
Key Plan | 2.7 | 4049-1033 Rev 10 |
Sheet 1 | 2.7A | 4049-1050 Rev 09 |
Sheet 2 | 2.7B | 4049-1051 Rev 09 |
Sheet 3 | 2.7C | 4049-1052 Rev 10 |
Sheet 4 | 2.7D | 4049-1053 Rev 08 |
The illustrative arrangement of railway alignment | 2.14 | TRS-DRG-FA-001003 Rev 3 |
The rail terminal – illustrative expanded rail terminal layout plan | 2.15B | TRS-DRG-FA-001010 Rev 02 |
The rail section plans | ||
Cross sections rail alignment Sheet 1 | 2.16A | TRS-DRG-FA-001005 Rev 01 |
Cross sections rail alignment Sheet 2 | 2.16B | TRS-DRG-FA-001006 Rev 02 |
Cross sections rail alignment Sheet 3 | 2.16C | TRS-DRG-FA-001007 Rev 01 |
Long sections rail alignment Sheet 1 | 2.16D | TRS-DRG-FA-001004 Rev 01 |
Long sections rail alignment Sheet 2 | 2.16E | TRS-DRG-FA-001008 Rev 01 |
The speed limit plans | ||
Key Plan | 2.12 | WSP-70001979-SK-062 Rev I |
Sheet 1 | 2.12A | WSP-70001979-SK-062 Rev K |
Sheet 2 | 2.12B | WSP-70001979-SK-062 Rev F |
Sheet 3 | 2.12C | WSP-70001979-SK-062 Rev E |
SI facility plan | 2.20 | 01 |
The traffic regulation plans | ||
Key Plan | 2.11 | WSP-70001979-SK-061 Rev I |
Sheet 1 | 2.11A | WSP-70001979-SK-061 Rev H |
Sheet 2 | 2.11B | WSP-70001979-SK-061 Rev E |
Sheet 3 | 2.11C | WSP-70001979-SK-061 Rev F |
Sheet 4 | 2.11D | WSP-70001979-SK-061 Rev A |
The works plans | ||
Key Plan | 2.2 | Key Plan v1 |
Sheet 1 | 2.2A | Sheet 1 of 9 v1 |
Sheet 2 | 2.2B | Sheet 2 of 9 v1 |
Sheet 3 | 2.2C | Sheet 3 of 9 v1 |
Sheet 4 | 2.2D | Sheet 4 of 9 v1 |
Sheet 5 | 2.2E | Sheet 5 of 9 v1 |
Sheet 6 | 2.2F | Sheet 6 of 9 v1 |
Sheet 7 | 2.2G | Sheet 7 of 9 v1 |
Sheet 8 | 2.2H | Sheet 8 of 9 v1 |
Sheet 9 | 2.2I | Sheet 9 of 9 v1 |
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: