10. In this Part—
(a)“initial survey” means a survey by a surveyor completed before a ship is put into service, or before a Sewage Certificate is first issued in respect of that ship, to verify that at the date of the survey, the surveyor is satisfied that the structure, equipment, systems, fittings, arrangements and materials of the ship fully comply with the requirements of Part 3 (equipment);
(b)“renewal survey” means a survey by a surveyor to verify that at the date of the survey, the surveyor is satisfied that the structure, equipment, systems, fittings, arrangements and materials of the ship fully comply with the requirements of Part 3 (equipment); and
(c)“additional survey” means a survey by a surveyor to verify that at the date of the survey the surveyor is satisfied that—
(i)the repair or renewal has been made effectively;
(ii)the materials used in, and the workmanship of, the repair or renewal are satisfactory in all respects; and
(iii)the ship complies in all respects with the requirements of Part 3 (equipment).
Commencement Information
I1Reg. 10 in force at 22.7.2020, see reg. 1(2)