SCHEDULES

Schedule 2, Requirement 5

SCHEDULE 12E+WDESIGN PARAMETERS

[F1Table 9

(1)

Building or structure

(2)

Maximum length (metres)

(3)

Maximum width (metres)

(4)

Maximum height (metres above 0 meters above ordnance datum)

(5)

Maximum diameter (metres)

Single gas turbine and generator312020-
Gas turbine building503529-
Exhaust stack--5612
Air intakes241640-
Fin-fan cooler301517-
Control room, workshops, stores352016-
Demineralised tank, firewater tank--3224]