SCHEDULE 17Protective Provisions
PART 7For the protection of the Environment Agency and drainage authorities
72.
In this Part—
“construction” includes execution, placing, altering, replacing, relaying and removal; and
“construct” and “constructed” must be construed accordingly;
“drainage authority” means—
(a)
(b)
in relation to a main river or any sea defence work, the Environment Agency;
“drainage work” means any watercourse and includes any land that provides or is expected to provide flood storage capacity for any watercourse and any bank, wall, embankment or other structure, or any appliance, constructed or used for land drainage, flood defence, sea defence or tidal monitoring;
“plans” includes sections, drawings, specifications and method statements;
“specified work” means so much of any work or operation authorised by this Order as is in, on, under, over or within 16 metres of a drainage work or is otherwise likely to—
(a)
affect any drainage work or the total volume or volumetric rate of flow of water in or flowing to or from any drainage work;
(b)
affect the flow, purity, or quality of water in any watercourse; or
(c)
affect the conservation, distribution or use of water resources.