Search Legislation

The Norfolk Vanguard Offshore Wind Farm (Amendment) Order 2022

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)
 Help about opening options

Opening OptionsExpand opening options

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Amendments to Part 1 (Authorised Development) of Schedule 1 (Authorised Project)

3.  In Part 1 (Authorised development) of Schedule 1 (Authorised project), in paragraph (a) of the description of Work No. 1—

(a)for “with an electrical export capacity of up to 1,800 MW at the point of connection to the offshore electrical platform(s) referred to at Work No. 2” substitute “with a gross electrical output of over 100 MW”; and

(b)for “up to 158 wind turbine generators” substitute “up to 145 wind turbine generators”.

Back to top

Options/Help