PART 2WORKS PROVISIONS
Principal powers
Power to deviate12
In constructing or maintaining any of the scheduled works, Network Rail may—
a
deviate laterally from the lines or situations shown on the deposited plans to the extent of the limits of deviation for that work; and
b
deviate vertically from the levels shown on the deposited sections—
i
to any extent upwards not exceeding 0.5 metres in relation to Work Nos. 1A and 1B;
ii
to any extent upwards not exceeding 3 metres; or
iii
to any extent downwards as may be found to be necessary or convenient.