Articles 2 and 8

SCHEDULE 1SCHEDULED WORKS

In the County of West Yorkshire, District of Kirklees—

Work No. 1A - A railway (990 metres in length) partly in tunnel, on the course of the existing railway (Manchester to Dewsbury line) commencing at a point 300 metres south of the junction of Gledholt Bank with Greenhead Road and terminating at a point 85 metres north of the junction of Upperhead Row with George Street. Work No. 1A includes the lowering of track through Gledholt Tunnel and Huddersfield Tunnel.

Work No. 1B - A railway (1,001 metres in length) partly in tunnel, on the course of the existing railway (Manchester to Dewsbury line) commencing at a point 110 metres north of the junction of Gledholt Bank with Longroyd Place and terminating at a point 60 metres north-east of the junction of Upperhead Row with Half Moon Street. Work No. 1B includes the lowering of track through Gledholt Tunnel and Huddersfield Tunnel.

Work No. 1C - A railway (1,051 metres in length) partly in tunnel and partly on viaduct, on the course of the existing railway (Manchester to Dewsbury and Huddersfield to Dewsbury lines) commencing at a point 65 metres north-west of the junction of Half Moon Street with Sergeantson Street and terminating at a point 32 metres south of the junction of Willow Lane East with Alder Street. Work No. 1C includes the reconfiguration of Huddersfield Station and remedial and reconfiguration works to Huddersfield Viaduct MVL3 Underbridge 92.

Work No. 2 - A railway (2,196 metres in length) on the course of the existing railway (Huddersfield to Dewsbury line) commencing at a point 35 metres south-east of the junction of Willow Lane East with Alder Street and terminating at a point 205 metres east of Peel’s Pit, MVL3 Underbridge 100. Work No.2 includes the infill of Peel’s Pit MVL3 Underbridge 100.

Work No. 2A - A railway (494 metres in length) forming a siding commencing at a point 25 metres east of the junction of Willow Lane East with Alder Street and terminating at a point 110 metres south-east of the junction of Alder Street with Abbey Road.

Work No. 2B - A railway (286 metres in length) forming a spur off the existing railway (Huddersfield to Dewsbury line) commencing at a point 180 metres east of the junction of Hammond Street with Abbey Road and terminating by a junction with the existing railway (Huddersfield to Dewsbury line) at a point 105 metres south of the junction of Aquamarine Drive with Topaz Close.

Work No. 2C - Reconstruction of Red Doles Road MVL3 Underbridge 96 carrying Red Doles Road under Work No.2 and the existing railway (Huddersfield to Dewsbury line) commencing at a point 80 metres south of the junction of Aquamarine Drive with Jacinth Court and terminating at a point 15 metres south-east of its commencement.

Work No. 3 - Reconstruction of Field House MVL3 Overbridge 98 carrying Footpath HUD/42/10 over Work No.2 and the existing railway (Huddersfield to Dewsbury line) commencing at a point 160 metres south-east of the junction of Footpath HUD/42/10 with Footpath HUD/39/10 and terminating at a point 25 metres south-east of its commencement.

Work No. 4 - Reconstruction of Ridings MVL3 Underbridge 99 carrying Footpath HUD/44/30 under Work No.2 and the existing railway (Huddersfield to Dewsbury line) commencing at a point 23 metres south of the junction of Footpath HUD/44/20 with Footpath HUD/44/40 and terminating at a point 20 metres south of its commencement.

Work No. 5 - A railway (1,411 metres in length) on the course of the existing railway (Huddersfield to Dewsbury line) commencing at a point 310 metres north-west of the junction of A62 Leeds Road with Ashgrove Road and terminating at a point 230 metres east of the junction of A62 Leeds Road with Station Road. Work No. 5 includes the reconstruction of Deighton Station.

Work No. 6 - Realignment of Whitacre Street (including a bridge over Work No.5 and the existing railway (Huddersfield to Dewsbury line)) commencing at a point on that road 195 metres south-west of the junction of that road with Deighton Road and terminating at a point 145 metres south-east of its commencement. Work No. 6 includes the demolition of the existing Whiteacre Street MVL3 Overbridge 101 carrying Whitacre Street over the existing railway (Huddersfield to Dewsbury line) and the infill of the existing stone arch of that bridge.

Work No. 7 - Realignment of A62 Leeds Road (including a bridge over Work No.5 and the existing railway (Huddersfield to Dewsbury line)) commencing at a point on that road 210 metres north-east of the junction of A62 Leeds Road with Whitacre Street and terminating at a point 75 metres east of the junction of Deighton Road with Glenfield Avenue. Work No. 7 includes the demolition of the existing A62 Leeds Road MVL3 Overbridge 102 carrying A62 Leeds Road over the existing railway (Huddersfield to Dewsbury line).

Work No. 8 - Reconstruction of Wheatley’s MVL3 Overbridge 103 carrying National Cycle Network Route 66 (Calder Valley Greenway) over Work No.5 and the existing railway (Huddersfield to Dewsbury line) commencing at a point 135 metres south-east of the junction of A62 Leeds Road with Brooklands and terminating at a point 35 metres south-east of its commencement.

Work No. 9A - A railway (692 metres in length) on the course of the existing railway (Huddersfield to Dewsbury line), partly on viaduct, commencing at a point 230 metres south-east of the junction of A62 Leeds Road with Station Road and terminating at a point 692 metres north-east of its commencement. Work No.9A includes reconfiguration works to Huddersfield Broad Canal MVL3 Underbridge 108 and Huddersfield Broad Canal MVL3 Underbridge 108S.

Work No. 9B - A railway (1,025 metres in length), partly on viaduct, commencing at a point 200 metres west of Heaton Lodge Sewage Works and terminating at a point 110 metres north-west of the junction of Helm Lane with Wood Lane.

Work No. 9C - A railway (1,107 metres in length) on the course of the existing railway (Huddersfield to Dewsbury line), partly on viaduct, commencing at a point 195 metres west of Heaton Lodge Sewage Works and terminating at a point 55 metres south-west of the junction of Waterside Walk with Wood Lane.

Work No. 9D - A railway (655 metres in length) on the course of the existing railway (Huddersfield to Dewsbury line) commencing at a point 110 metres north of the junction of Helm Lane with Wood Lane passing and terminating at a point 310 metres south of the junction of A644 Huddersfield Road with Stocks Bank Road.

Work No. 10 - Realignment of B6118 Colne Bridge Road (including a bridge over Work No.9A and the existing railway (Huddersfield to Dewsbury line)) commencing at a point on that road 160 metres south of the junction of A62 Leeds Road with Bradley Road and terminating at a point 165 metres south-east of its commencement. Work No. 10 includes the demolition of the existing B6118 Bridge Road MVL3 Overbridge 107 carrying B6118 Colne Bridge Road over the existing railway (Huddersfield to Dewsbury line) and the infill of existing spans 1 and 4 of that bridge.

Work No. 11 - Reconstruction of Parks MVL3 Overbridge 110 and MVL4 Overbridge 1 carrying an access road over Work No. 9B, Work No. 9C and the existing railway (Huddersfield to Dewsbury line) commencing at a point 145 metres east of the viaduct carrying the existing railway (Huddersfield to Dewsbury line) over the River Colne and terminating at a point 45 metres south-east of its commencement.

Work No. 11A - Diversion of a high-pressure gas main, commencing beneath a point 170 metres north-west of the junction of Helm Lane with Footpath KIR/240/10 and terminating beneath a point 115 metres south-east of its commencement.

Work No. 11B - Diversion of a high-pressure gas main, commencing beneath a point 210 metres west of the junction of Waterside Walk with Wood Lane and terminating beneath a point 45 metres south of its commencement.

Work No. 12 - Reconstruction of Heaton Lodge Footbridge MVL4 Footbridge 4 carrying Footpath KIR/240/10 over Work No.9C and the existing railway (Huddersfield to Dewsbury line) commencing at a point 215 metres west of the junction of Waterside Walk with Wood Lane and terminating at a point 30 metres south-east of its commencement.

Work No. 13 - Reconstruction of Helm Lane MVN2 Underbridge 188 carrying Footpath KIR/240/10 under Work No.9B and the existing railway (Huddersfield to Dewsbury line) commencing at a point 140 metres west of the junction of Waterside Walk with Wood Lane and terminating at a point 45 metres south of its commencement.

Work No. 14 - A railway (2,588 metres in length) on the course of the existing railway (Huddersfield to Dewsbury line), partly on viaduct, commencing at a point 310 metres south of the junction of A644 Huddersfield Road with Stocks Bank Road and terminating at a point 295 metres south-east of the junction of Steanard Lane with Sands Lane. Work No. 14 includes the reconstruction of Mirfield Station.

Work No. 15 - A railway (3,048 metres in length) partly on the course of the existing railway (Huddersfield to Dewsbury line), partly on viaduct, commencing at a point 295 metres south-east of the junction of Steanard Lane with Sands Lane and terminating at a point 65 metres south-east of the junction of A644 Huddersfield Road with Pinfold Hill. Work No. 15 includes a viaduct over the Calder and Hebble Navigation and the River Calder, the demolition of Ravensthorpe station, the construction of a station at Ravensthorpe, the reconfiguration of B6117 Fall Lane, Thornhill Road MDL1 Underbridge 9 and the infill of underbridges Occupation MDL1 Underbridge 10, Toad Holes MDL1 Underbridge 12 and Ming Hill MDL1 Underbridge 14.

Work No. 16 - A railway (550 metres in length) commencing at a point 190 metres south-west of Thornhill Power Station and terminating at a point 50 metres west of the bridge carrying the existing railway over the Calder and Hebble Navigation. Work No.16 includes the infill of Lees Hall Farm MVN2 Underbridge 204.

Work No. 17 - Realignment of Calder Road (including a bridge over Work No.15 and the existing railway (Huddersfield to Dewsbury line)) commencing at a point on that road 235 metres east of Thornhill Power Station and terminating at a point 270 metres south of its commencement. Work No. 17 includes the demolition of the existing Calder Road MVN2 Overbridge 202 carrying Calder Road over the existing railway (Huddersfield to Dewsbury line) and the demolition of Gas Pipe MVN2 Pipe Bridge 202A.

Work No. 17A - Realignment of Ravensthorpe Road commencing by a junction with Work No.17 at a point 260 metres south of the bridge carrying Calder Road over the River Calder and terminating at a point 185 metres east of its commencement.

Work No. 17B - An access road, commencing by a junction with Work No.17 at a point 110 metres south of the bridge carrying Calder Road over the River Calder and terminating at a point 55 metres south-east of that junction.

Work No. 18 - A diversion of a high pressure gas main commencing beneath a point 80 metres south-east of Thornhill Power Station and terminating beneath a point 85 metres south of its commencement.

Work No. 19 - Realignment of Fall Lane commencing at a point on that road 105 metres east of the junction of A644 Huddersfield Road with Temple Road and terminating by a junction with Work No.20 at a point 170 metres north of the junction of Thornhill Road with Tenter Fields.

Work No. 20 - Realignment of Thornhill Road commencing at a point on that road 165 metres south of the junction of Cemetery Road with Quarry Road and terminating at a point 70 metres south-east of its commencement.

Work No. 21 - A temporary bridge, carrying an temporary access road over the Calder and Hebble Navigation, commencing at a point 270 metres south-east of the bridge carrying the existing railway over the Calder & Hebble Navigation and terminating at a point 75 metres north-east of its commencement.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources