PART 1PRELIMINARY
Citation and commencementI11
This Order may be cited as the A57 Link Roads Development Consent Order 2022 and comes into force on 7th December 2022.
InterpretationI22
1
In this Order—
“the 1961 Act” means the Land Compensation Act 196110
“the 1965 Act” means the Compulsory Purchase Act 196511;
“the 1980 Act” means the Highways Act 198012;
“the 1981 Act” means the Compulsory Purchase (Vesting Declarations) Act 198113;
“the 1984 Act” means the Road Traffic Regulation Act 198414;
“the 1990 Act” means the Town and Country Planning Act 199015;
“the 1991 Act” means the New Roads and Street Works Act 199116;
“the 2004 Act” means the Traffic Management Act 200417;
“the 2008 Act” means the Planning Act 200818;
“the 2017 Regulations” means the Compulsory Purchase of Land (Vesting Declarations) (England) Regulations 201719;
“address” includes any number or address for the purposes of electronic transmission;
“apparatus” has the same meaning as in Part 3 (street works in England and Wales) of the 1991 Act;
“authorised development” means the development described in Schedule 1 (authorised development) or any part of it, which is development within the meaning of section 32 (meaning of “development”) of the 2008 Act;
“the book of reference” means the book of reference referred to in Schedule 10 (documents to be certified) and certified by the Secretary of State as the book of reference for the purposes of this Order;
“British Telecommunications PLC” means the company registered in England and Wales, company number 01800000, whose registered address is 1 Braham Street, London, United Kingdom, E1 8EE;
“building” includes any structure or erection or any part of a building, structure or erection;
“bridleway” has the same meaning as in the 1980 Act and for the purposes of this Order includes a right of way on pedal cycles;
“Cadent Gas Limited” means the Company registered in England and Wales, company number 10080864, whose registered address is Cadent, Pilot Way, Ansty, Coventry, England, CV7 9JU;
“carriageway” has the same meaning as in section 329(1) (further provision as to interpretation) of the 1980 Act;
“the classification of roads plans” means the plans of that description referred to in Schedule 10 (documents to be certified) and certified by the Secretary of State as the classification of road plans for the purposes of this Order;
“commence” means beginning to carry out any material operation (as defined in section 56(4)20 (time when development begun) of the 1990 Act) forming part of the authorised development other than operations consisting of archaeological investigations and mitigation works, ecological surveys and mitigation works, environmental surveys and monitoring, investigations for the purpose of assessing and monitoring ground conditions and levels, remedial work in respect of any contamination or other adverse ground conditions, erection of any temporary means of enclosure, establishment of work areas and compounds, receipt of construction plant and equipment, erection of construction plant and equipment for the preliminary works (as defined in paragraph 1 of Schedule 2 (requirements)), diversion and laying of underground apparatus and site clearance, and the temporary display of site notices or information and “commencement” and “commencing” are to be construed accordingly;
“cycle track” has the same meaning as in section 329(1) of the 1980 Act and includes part of a cycle track21;
“cycleway” means a way constituting or comprised in a highway, being a way over which the public have the following, but no other, rights of way: a right of way on pedal cycles (other than pedal cycles which are motor vehicles within the meaning of the Road Traffic Act 198822) with a right of way on foot or a right of way on horseback or leading a horse;
“Electricity North West Limited” means the company registered in England and Wales, company number 02366949, whose registered address is Electricity North West, Borron Street, Stockport, England, SK1 2JD;
“electronic transmission” means a communication transmitted—
- a
by means of an electronic communications network; or
- b
by other means but while in electronic form,
and in this definition “electronic communications network” has the same meaning as in section 32(1) (meaning of electronic communications networks and services) of the Communications Act 200323;
- a
“the engineering drawings and sections” means the drawings and sections referred to in Schedule 10 (documents to be certified) and certified as the engineering drawings and sections by the Secretary of State for the purposes of this Order ;
“the environmental statement” means the document of that description submitted with the application for this Order and referred to in Schedule 10 (documents to be certified) and certified as the environmental statement by the Secretary of State for the purposes of this Order;
“footway” and “footpath” have the same meaning as in section 329(1) of the 1980 Act;
“highway” and “highway authority” have the same meaning as in the 1980 Act and “highway” includes part of a highway;
“the land plans” means the plans referred to in Schedule 10 (documents to be certified) and certified as the land plans by the Secretary of State for the purposes of this Order;
“local highway authority” has the same meaning as in section 329(1)24 of the 1980 Act;
“maintain” in relation to the authorised development includes, to the extent that is unlikely to give rise to any materially new or materially worse environmental effects in comparison with those reported in the environmental statement, inspect, repair, adjust, alter, remove or reconstruct and any derivative of “maintain” is to be construed accordingly;
“the Order land” means the land shown on the land plans which is within the limits of land to be acquired or used permanently or temporarily, and described in the book of reference;
“the Order limits” means the limits of land to be acquired or used permanently or temporarily shown on the land plans and works plans within which the authorised development may be carried out;
“owner”, in relation to land, has the same meaning as in section 7 (interpretation) of the Acquisition of Land Act 198125;
“relevant planning authority” has the same meaning as in section 173 (the relevant local planning authority) of the 2008 Act;
“special road” means a highway which is a special road in accordance with section 16 (general provisions as to special roads) of the 1980 Act or by virtue of an order granting development consent;
“the speed limits and traffic regulations plans” means the plans referred to in Schedule 10 (documents to be certified) and certified by the Secretary of State as the speed limits and traffic regulations plans for the purposes of this Order;
“statutory undertaker” means any statutory undertaker for the purposes of section 127(8) (statutory undertakers’ land), of the 2008 Act;
“street” means a street within the meaning of section 4826 (streets, street works and undertakers) of the 1991 Act, together with land on the verge of a street or between two carriageways;
“street authority” has the same meaning as in Part 327 of the 1991 Act;
“streets, rights of way and access plans” means the plans referred to in Schedule 10 (documents to be certified) and certified as the streets, rights of way and access plans by the Secretary of State for the purposes of this Order;
“traffic authority” has the same meaning as in section 121A28 (traffic authorities) of the 1984 Act;
“TPO and hedgerow plans” means the document referred to in Schedule 10 (documents to be certified) and certified as the TPO and hedgerow plans by the Secretary of State for the purposes of this Order;
“trunk road” means a highway which is a trunk road by virtue of—
“the undertaker” means National Highways Limited (Company No. 09346363) whose registered office is at Bridge House, 1 Walnut Tree Close, Guildford, Surrey, GU1 4LZ;
“United Utilities Water Limited” means the Company registered in England and Wales, company number 02366678, whose registered office is at Haweswater House, Lingley Mere Business Park, Lingley Green Avenue, Great Sankey, Warrington WA5 3LP;
“watercourse” includes all rivers, streams, ditches, drains, canals, cuts, culverts, dykes, sluices, sewers and passages through which water flows except a public sewer or drain; and
“the works plans” means the plans referred to in Schedule 10 (documents to be certified) and certified as the works plans by the Secretary of State for the purposes of this Order.
2
References in this Order to rights over land include references to rights to do, or to place and maintain, anything in, on or under land or in the airspace above its surface and references in this Order to the imposition of restrictive covenants are references to the creation of rights over land which interfere with the interests or rights of another and are for the benefit of land which is acquired under this Order or is otherwise comprised in the Order land.
3
References in this Order to the creation and acquisition of rights over land includes references to rights to oblige a party having an interest in land to grant those rights referenced in the Order, at the discretion of the undertaker, either—
a
to an affected person directly, whether that person’s land or rights over land have been adversely affected by this Order, and, where that is the case, the rights referenced in the Order are to be granted for the benefit of the land in which that affected person has an interest at the time of the making of this Order; or
b
to any statutory undertaker for the purposes of their undertaking.
4
All distances, directions, areas and lengths referred to in this Order are approximate and distances between points on a work comprised in the authorised development are taken to be measured along that work.
5
For the purposes of this Order, all areas described in square metres in the book of reference are approximate.
6
References in this Order to points identified by letters or numbers are to be construed as references to points so lettered or numbered on the relevant plans.
7
References in this Order to numbered works are references to the works as numbered in Schedule 1 (authorised development).
PART 2PRINCIPAL POWERS
Development consent etc. granted by the OrderI33
1
Subject to the provisions of this Order including the requirements in Schedule 2 (requirements), the undertaker is granted development consent for the authorised development to be carried out within the Order limits.
2
Any enactment applying to land within or adjacent to the Order limits has effect subject to the provisions of this Order.
Maintenance of authorised developmentI44
The undertaker may at any time maintain the authorised development, except to the extent that this Order, or an agreement made under this Order, provides otherwise.
Maintenance of drainage worksI55
1
Nothing in this Order, or the construction, maintenance or operation of the authorised development under it, affects any responsibility for the maintenance of any works connected with the drainage of land, whether that responsibility is imposed or allocated by or under any enactment, or otherwise, unless otherwise agreed in writing between the undertaker and the person responsible except where access to works connected with the drainage of land is restricted by the undertaker. During any period where access is restricted, the undertaker is responsible for the maintenance of any works connected with the drainage of land..
2
In this article “drainage” has the same meaning as in section 72 (interpretation) of the Land Drainage Act 199131.
Planning PermissionI66
If planning permission is granted under the powers conferred by the 1990 Act for development any part of which is within the Order limits following the coming into force of this Order that is—
a
not itself a nationally significant infrastructure project under the 2008 Act or part of such a project; or
b
required to complete or enable the use or operation of any part of the development authorised by this Order,
then the carrying out, use or operation of such development under the terms of the planning permission does not constitute a breach of the terms of this Order.
Limits of deviationI77
In carrying out the authorised development the undertaker may—
a
deviate laterally from the lines or situations of the authorised development shown on the works plans to the extent of the limits of deviation shown on those plans; and
b
deviate vertically from the levels of the authorised development shown on the engineering drawings and sections to a maximum of 0.5 metres upwards or 0.5 metres downwards, with the exception of the following—
i
Work No. 23 (realignment of Carrhouse Lane), where the maximum deviations are 1.0 metres upwards or downwards;
ii
Work No. 31 (Old Mill Underpass), where the maximum deviations are 1.0 metres upwards or downwards;
iii
Work No. 32 (Roe Cross Bridge), where the maximum deviations are 1.0 metres upwards or downwards;
iv
Work No. 33 (Mottram Moor Underpass), where the maximum deviations are 1.0 metres upwards or downwards;
v
Work No. 34 (Carrhouse Lane Underpass), where the maximum deviations are 1.0 metres upwards or downwards; and
vi
Work No. 35 (River Etherow Bridge/Underpass), where the maximum deviations are 1.0 metres upwards or downwards;
except that these maximum limits of horizontal and vertical deviation do not apply where it is demonstrated by the undertaker to the Secretary of State’s satisfaction and the Secretary of State, following consultation with the relevant planning authority, certifies accordingly that a deviation in excess of these limits would not give rise to any materially new or materially worse environmental effects (including environmental effects at any individual receptor) in comparison with those reported in the environmental statement.
Benefit of OrderI88
1
Subject to paragraph (2) and article 9 (consent to transfer benefit of Order), the provisions of this Order conferring powers on the undertaker have effect solely for the benefit of the undertaker.
2
Paragraph (1) does not apply to the works for which consent is granted by this Order for the express benefit of owners and occupiers of land, statutory undertakers and other persons affected by the authorised development.
Consent to transfer benefit of OrderI99
1
Subject to paragraph (4), the undertaker may—
a
transfer to another person (“the transferee”) any or all of the benefit of the provisions of this Order and such related statutory rights as may be agreed between the undertaker and the transferee; or
b
grant to another person (“the lessee”) for a period agreed between the undertaker and the lessee any or all of the benefit of the provisions of this Order and such related statutory rights as may be so agreed.
2
Where an agreement has been made in accordance with paragraph (1) references in this Order to the undertaker, except in paragraph (3), includes references to the transferee or the lessee.
3
The exercise by a person of any benefits or rights conferred in accordance with any transfer or grant under paragraph (1) is subject to the same restrictions, liabilities and obligations as would apply under this Order if those benefits or rights were exercised by the undertaker.
4
The consent of the Secretary of State is required for a transfer or grant under this article, except where the transfer or grant is made to—
a
Electricity North West Limited for the purposes of undertaking Work No. 61, 62(i), and 64;
b
United Utilities Water Limited for the purposes of undertaking Work No. 58, 59, 60, 62(iv) and 65;
c
Cadent Gas Limited for the purposes of undertaking Work No. 62(iii) and 63; and
d
British Telecommunications PLC for the purposes of undertaking Work No. 62(ii).
provided that any transfer or grant under this paragraph must not include the transfer or grant of any benefit of the provisions of Part 5 (powers of acquisition and possession) of this Order without the consent of the Secretary of State.
PART 3STREETS
Street WorksI1010
1
The undertaker may, for the purposes of the authorised development, enter on so much of any of the streets as are within the Order limits and may—
a
break up or open the street, or any sewer, drain or tunnel under it;
b
tunnel or bore under the street;
c
place apparatus in the street;
d
maintain apparatus in the street or change its position; and
e
execute any works required for, or incidental to, any works referred to in sub-paragraphs (a), (b), (c) and (d).
2
The authority given by paragraph (1) is a statutory right for the purposes of sections 48(3) (streets, street works and undertakers) and 51(1) (prohibition of unauthorised street works) of the 1991 Act.
3
Subject to article 11 (application of the 1991 Act), the provisions of section 54 to 106 of the 1991 Act apply to any street works carried out under paragraph (1).
Application of the 1991 ActI1111
1
Works executed under this Order in relation to a highway which consists of or includes a carriageway are to be treated for the purposes of Part 3 (street works in England and Wales) of the 1991 Act as major highway works if—
a
they are of a description mentioned in any of paragraphs (a), (c) to (e), (g) and (h) of section 86(3) (which defines what highway authority works are major highway works) of that Act; or
2
In Part 3 of the 1991 Act, references to the highway authority concerned are, in relation to works which are major highway works by virtue of paragraph (1), to be construed as references to the undertaker.
3
The following provisions of Part 3 the 1991 Act do not apply in relation to any works executed under the powers conferred by this Order—
section 5634 (power to give directions as to timing of street works);
section 56A35 (power to give directions as to placing of apparatus);
section 5836 (restriction on works following substantial road works);
section 58A37 (restriction on works following substantial street works);
Schedule 3A38 (restriction on works following substantial street works).
4
The provisions of the 1991 Act referred to in paragraph (5) (which, together with other provisions of that Act, apply in relation to the execution of street works) and any regulations made, or code of practice issued or approved under those provisions apply (with the necessary modifications) in relation to any stopping up, alteration or diversion of a street of a temporary nature by the undertaker under the powers conferred by article 14 (temporary alteration, diversion, prohibition and restriction of the use of streets), whether or not the alteration or diversion constitutes street works within the meaning of that Act.
5
The provisions of the 1991 Act39 referred to in paragraph (4) are—
section 5440 (advance notice of certain works), subject to paragraph (6);
section 5541 (notice of starting date of works), subject to paragraph (6);
section 5742 (notice of emergency works);
section 5943 (general duty of street authority to co-ordinate works);
section 60 (general duty of undertakers to co-operate);
section 68 (facilities to be afforded to street authority);
section 69 (works likely to affect other apparatus in the street);
section 75 (inspection fees);
section 76 (liability for cost of temporary traffic regulation); and
section 77 (liability for cost of use of alternative route),
and all such other provisions as apply for the purposes of the provisions mentioned above.
6
Sections 54 and 55 of the 1991 Act as applied by paragraph (4) have effect as if references in section 57 of that Act to emergency works were a reference to a stopping up, alteration or diversion (as the case may be) required in a case of emergency.
7
Nothing in article 12 (construction and maintenance of new, altered or diverted streets)—
a
affects the operation of section 87 (prospectively maintainable highways) of the 1991 Act, and the undertaker is not by reason of any duty under that article to maintain a street, to be taken to be the street authority in relation to that street for the purposes of Part 3 of that Act; or
b
has effect in relation to maintenance works which are street works within the meaning of the 1991 Act, as respects which the provisions of Part 3 of the 1991 Act apply.
Construction and maintenance of new, altered or diverted streets and other structuresI1212
1
Any highway (other than a trunk road or special road) to be constructed under this Order must be completed to the reasonable satisfaction of the local highway authority in whose area the highway lies and, unless otherwise agreed in writing with the local highway authority, the highway including any culverts or other structures laid under it must be maintained by and at the expense of the local highway authority from its completion.
2
Where a highway (other than a trunk road or a special road) is altered or diverted under this Order, the altered or diverted part of the highway must, when completed to the reasonable satisfaction of the local highway authority in whose area the highway lies and, unless otherwise agreed in writing with the highway authority, that part of the highway including any culverts or other structures laid under it must be maintained by and at the expense of the highway authority from its completion.
3
Where a street which is not and is not intended to be a public highway is constructed, altered or diverted under this Order, the street (or part of the street as the case may be) must, when completed to the reasonable satisfaction of the street authority and unless otherwise agreed in writing with the street authority, be maintained by and at the expense of the undertaker for a period of 12 months from its completion and at the expiry of that period by and at the expense of the street authority.
4
Where the highway described in Part 4 (road to be detrunked) of Schedule 3 (classification of roads, etc.) is detrunked under this Order—
a
section 26544 (transfer of property and liabilities upon a highway becoming or ceasing to be a trunk road) of the 1980 Act applies in respect of that highway; and
b
any alterations to that highway undertaken under powers conferred by this Order prior to and in connection with that detrunking must, unless otherwise agreed in writing with the local highway authority, be maintained by and at the expense of the local highway authority from the date of detrunking.
5
In the case of—
a
the Carrhouse Lane Underpass to be constructed pursuant to Work No. 34, and the River Etherow Bridge to be constructed pursuant to Work No. 35, must be maintained by and at the expense of the local highway authority, unless otherwise agreed in writing with the local highway authority;
b
the highways above the structure of the Mottram Underpass and Roe Cross Road Bridge to be constructed pursuant to Work Nos. 32 and 33 must be maintained by and at the expense of the local highway authority and the structure of the Mottram Underpass and Roe Cross Road Bridge together with the Mottram Moor Link Road to be constructed pursuant to Work Nos. 5 and 6 must be maintained by and at the expense of the undertaker, unless otherwise agreed in writing with the local highway authority;
6
In any action against the undertaker in respect of loss or damage resulting from any failure by it to maintain a street or other structure under this article, it is a defence (without prejudice to any other defence or the application of the law relating to contributory negligence) to prove that the undertaker had taken such care as in all the circumstances was reasonably required to secure that the part of the street or other structure to which the action relates was not dangerous to traffic.
7
For the purposes of a defence under paragraph (6), the court must in particular have regard to the following matters—
a
the character of the street or structure and the traffic which was reasonably to be expected to use it;
b
the standard of maintenance appropriate for a street or structure of that character and used by such traffic;
c
the state of repair in which a reasonable person would have expected to find the street or structure;
d
whether the undertaker knew, or could reasonably have been expected to know, that the condition of the part of the street or structure to which the action relates was likely to cause danger to users of the street or other structure; and
e
where the undertaker could not reasonably have been expected to repair that part of the street or structure before the cause of action arose, what warning notices of its condition had been displayed,
but for the purposes of such a defence it is not relevant to prove that the undertaker had arranged for a competent person to carry out or supervise the maintenance of the part of the street or structure to which the action relates unless it is also proved that the undertaker had given the competent person proper instructions with regard to the maintenance of the street or structure and that the competent person had carried out those instructions.
Classification of roads etc.I1313
1
The road described in Part 1 (special roads) of Schedule 3 (classification of roads, etc.) is to be—
a
classified as a special road for the purposes of any enactment or instrument which refers to highways classified as special roads; and
b
provided for the use of traffic of Classes I and II of the classes of traffic set out in Schedule 4 to the 1980 Act.
2
From the date on which the undertaker notifies the Secretary of State that the road described in Part 1 (special roads) of Schedule 3 has been completed and is open for traffic—
a
the undertaker is the highway authority for that road; and
b
it is classified as a trunk road for the purposes of any enactment or instrument which refers to highways classified as trunk roads.
3
On the date on which the authorised development is open for traffic the roads described in Part 2 (trunk roads) of Schedule 3 are to become trunk roads as if they had become so by virtue of an order under section 10(2)45 (general provision as to trunk roads) of the 1980 Act specifying that date as the date on which they were to become trunk roads.
4
On the date on which the authorised development is open for traffic the roads described in Part 3 (classified roads) of Schedule 3 are to become classified roads for the purpose of any enactment or instrument which refers to highways classified as classified roads as if such classification had been made under section 12(3) (general provision as to principal and classified roads) of the 1980 Act.
5
On a date to be determined by the undertaker, the road described in Part 4 (road to be detrunked) of Schedule 3 is to cease to be trunk road as if it had ceased to be a trunk road by virtue of an order made under section 10(2) of the 1980 Act specifying that date as the date on which it was to cease to be a trunk road.
6
On or after the date on which the roads specified in Part 5 (speed limits) of Schedule 3 are open for traffic, no person is to drive any motor vehicle at a speed exceeding the limit in miles per hour specified in column (3) of Part 5 of Schedule 3 along the lengths of road identified in the corresponding row of column (1) of that Part to the extent described in column (2) of that Part.
7
Subject to article 17 (clearways), on or after a date determined by the undertaker, the prohibitions specified in column (3) of Part 6 (clearways and other prohibitions) of Schedule 3 are to apply to the length of road identified in column (2) of that Part and those prohibitions are to have effect as if contained in an order made under the 1984 Act.
8
On a date to be determined by the undertaker, the order specified in column (3) of Part 7 (revocations and variations of existing traffic regulation order) of Schedule 3 is to be varied or revoked as specified in the corresponding row of column (4) of that Part in respect of the length of road specified in column (2) of that Part.
9
The proposed public rights of way described in Part 8 (public rights of way) of Schedule 3 and identified in the streets, rights of way and access plans will, on or after the date that they are first open for use, be of the type described in column (1) of that Part to the extent described in column (2) and, unless otherwise agreed with the local highway authority, are to be constructed by the undertaker in the specified locations and open for use no later than the date on which the authorised development is open for traffic.
10
An agreement may not be made with a local highway authority under paragraph (9) if it would include a provision that would result in any materially new or materially worse environmental effects than those reported in the environmental statement.
11
Unless otherwise agreed with the relevant land owner, the private means of access specified in column (2) of Part 9 (private means of access) of Schedule 3 and as identified on the rights of way and access plans are to be constructed by the undertaker in the specified locations and open for use no later than the date on which the authorised development is open for traffic.
12
The application of paragraphs (1) to (11) may be varied or revoked by any instrument made under any enactment which provides for the variation or revocation of such matters, including by an instrument made under the 1984 Act where the matter in question could have been included in an order made under that Act.
Temporary alteration, diversion, prohibition and restriction of the use of streetsI1414
1
The undertaker, during and for the purposes of carrying out the authorised development, may temporarily alter, divert, prohibit or restrict the use of any street and may for any reasonable time—
a
divert the traffic from the street; and
b
subject to paragraph (3), prevent all persons from passing along the street.
2
Without limitation on the scope of paragraph (1), the undertaker may use any street where the use has been temporarily prohibited or restricted under the powers conferred by this article, and which is within the Order limits, as a temporary working site.
3
The undertaker must provide reasonable access for pedestrians going to or from premises abutting a street affected by the temporary alteration, diversion, prohibition or restriction of a street under this article if there would otherwise be no such access.
4
Save as to streets in respect of which the undertaker is the street authority, the undertaker must not temporarily alter, divert, prohibit or restrict the use of any street without the consent of the street authority, which may attach reasonable conditions to any consent but such consent must not be unreasonably withheld or delayed.
5
Any person who suffers loss by the suspension of any private right of way under this article is entitled to compensation to be determined, in case of dispute, as if it were a dispute under Part 1 of the 1961 Act.
6
Subject to the undertaker complying with paragraph (7), if a street authority which receives an application for consent under paragraph (4) fails to notify the undertaker of its decision before the end of the period of 28 days beginning with the date on which the application was made, it is deemed to have granted consent.
7
When making an application for consent under paragraph (4), the undertaker must notify the street authority of the effect of paragraph (6).
Permanent stopping up and restriction of use of highways, streets and private means of accessI1515
1
Subject to the provisions of this article, the undertaker may, in connection with the carrying out of the authorised development, stop up each of the streets and private means of access specified in column (1) of Parts 1 and 2 of Schedule 4 (permanent stopping up and alteration of highways, streets and private means of access) to the extent specified and described in column (2) of that Schedule.
2
No street or private means of access specified in column (1) of Parts 1 and 2 of Schedule 4 is to be wholly or partly stopped up under this article unless—
a
the new street or private means of access to be constructed and substituted for it, which is specified in column (3) of those Parts of that Schedule, is open for use and, in the case of a street has been completed to the reasonable satisfaction of the street authority; or
b
a temporary alternative route for the passage of such traffic as could have used the street or private means of access to be stopped up is first provided, to the reasonable satisfaction of the street authority, between the commencement and termination points for the stopping up of the street or private means of access and subsequently maintained by the undertaker to the reasonable satisfaction of the street authority, until the completion and opening of the new street or private means of access in accordance with sub-paragraph (a).
3
Where a street or private means of access has been stopped up under this article—
a
all rights of way over or along the street or private means of access so stopped up are extinguished; and
b
the undertaker may appropriate and use for the purposes of the authorised development so much of the site of the street or private means of access as is bounded on both sides by land owned by the undertaker.
4
The undertaker may, in connection with the carrying out of the authorised development alter the private means of access specified in column (1) of Part 3 (alterations to private means of access) of Schedule 4 to the extent specified in column (2) of that Part.
5
Any person who suffers loss by the suspension or extinguishment of any private right of way under this article is entitled to compensation to be determined, in case of dispute, as if it were a dispute under Part 1 of the 1961 Act.
6
This article is subject to article 34 (apparatus and rights of statutory undertakers in stopped up streets).
Access to worksI1616
The undertaker may, for the purposes of the authorised development, form and lay out means of access, or improve existing means of access, at such locations within the Order limits as the undertaker reasonably requires for the purposes of the authorised development.
ClearwaysI1717
1
On or after the date on which the roads described in Part 1 of Schedule 3 (classification of roads, etc.) and in Part 6 of Schedule 3 (clearway and other restrictions) are open to traffic, except as provided in paragraph (2), no person is to cause or permit any vehicle to wait on any part of those roads, other than a lay-by, except upon the direction of, or with the permission of, a uniformed constable or uniformed traffic officer.
2
Nothing in paragraph (1) applies—
a
to render it unlawful to cause or permit a vehicle to wait on any part of a road, for so long as may be necessary to enable that vehicle to be used in connection with—
i
the removal of any obstruction to traffic;
ii
the maintenance, improvement, reconstruction or operation of the road;
iii
the laying, erection, inspection, maintenance, alteration, repair, renewal or removal in or near the road of any sewer, main pipe, conduit, wire, cable or other apparatus for the supply of gas, water, electricity or any electronic communications apparatus as defined in Schedule 3A (the electronic communications code) to the Communications Act 200346; or
iv
any building operation or demolition;
b
in relation to a vehicle being used—
i
for police, ambulance, fire and rescue authority or traffic officer purposes;
ii
in the service of a local authority, safety camera partnership or Driver and Vehicle Standards Agency in pursuance of statutory powers or duties;
iii
in the service of a water or sewerage undertaker within the meaning of the Water Industry Act 199147; or
iv
by a universal service provider for the purposes of providing a universal postal service as defined by the Postal Services Act 200048; or
c
in relation to a vehicle waiting when the person in control of it is—
i
required by law to stop;
ii
obliged to stop in order to avoid an accident; or
iii
prevented from proceeding by circumstances outside the person’s control.
3
No person is to cause or permit any vehicle to wait on any part of the roads described in paragraph (1) for the purposes of selling, or dispensing of, goods from that vehicle, unless the goods are immediately delivered at, or taken into, premises adjacent to the land on which the vehicle stood when the goods were sold or dispensed.
4
Paragraphs (1), (2) and (3) have effect as if made by order under the 1984 Act, and their application may be varied or revoked by an order made under that Act or any other enactment which provides for the variation or revocation of such orders.
5
In this article, “traffic officer” means an individual designated under section 2 (designation of traffic officers) of the 2004 Act.
Traffic regulationI1818
1
This article applies to roads in respect of which the undertaker is not the traffic authority.
2
Subject to the provisions of this article, and the consent of the traffic authority in whose area the road concerned is situated, which consent must not be unreasonably withheld, the undertaker may, for the purposes of the authorised development—
a
revoke, amend or suspend in whole or in part any order made, or having effect as if made, under the 1984 Act;
b
permit, prohibit or restrict the stopping, waiting, loading or unloading of vehicles on any road;
c
authorise the use as a parking place of any road;
d
make provision as to the direction or priority of vehicular traffic on any road; and
e
permit or prohibit vehicular access to any road,
either at all times or at times, on days or during such periods as may be specified by the undertaker.
3
The power conferred by paragraph (2) may be exercised at any time prior to the expiry of 12 months from the opening of the authorised development for public use but subject to paragraph (7) any prohibition, restriction or other provision made under paragraph (2) may have effect both before and after the expiry of that period.
4
The undertaker must consult the chief officer of police and the traffic authority in whose area the road is situated before complying with the provisions of paragraph (5).
5
The undertaker must not exercise the powers conferred by paragraph (2) unless it has—
a
given not less than—
i
12 weeks’ notice in writing of its intention so to do in the case of a prohibition, restriction or other provision intended to have effect permanently; or
ii
4 weeks’ notice in writing of its intention so to do in the case of a prohibition, restriction or other provision intended to have effect temporarily,
to the chief officer of police and to the traffic authority in whose area the road is situated; and
b
advertised its intention in such manner as the traffic authority may specify in writing within 28 days of its receipt of notice of the undertaker’s intention in the case of sub-paragraph (a)(i), or within 7 days of its receipt of notice of the undertaker’s intention in the case of sub-paragraph (a)(ii).
6
Any prohibition, restriction or other provision made by the undertaker under paragraph (2)—
a
has effect as if duly made by, as the case may be—
i
the traffic authority in whose area the road is situated, as a traffic regulation order under the 1984 Act; or
ii
the local authority in whose area the road is situated, as an order under section 32 (power of local authorities to provide parking places) of the 1984 Act,
and the instrument by which it is effected may specify savings and exemptions to which the prohibition, restriction or other provision is subject; and
b
is deemed to be a traffic order for the purposes of Schedule 7 (road traffic contraventions subject to civil enforcement) to the 2004 Act.
7
Any prohibition, restriction or other provision made under this article may be suspended, varied or revoked by the undertaker from time to time by subsequent exercise of the powers conferred by paragraph (2) within a period of 24 months beginning with the date of the opening of the authorised development.
8
Before exercising the powers conferred by paragraph (2) the undertaker must consult such persons as it considers necessary and appropriate and must take into consideration any representations made to it by any such person.
9
Expressions used in this article and in the 1984 Act have the same meaning in this article as in that Act.
10
The powers conferred on the undertaker by this article with respect to any road have effect subject to any agreement entered into by the undertaker with any person with an interest in (or who undertakes activities in relation to) premises served by the road.
11
Subject to the undertaker complying with paragraph (12), if the traffic authority fails to notify the undertaker of its decision within 28 days of receiving an application for consent under paragraph (2) the traffic authority is deemed to have granted consent.
12
When making an application for consent under paragraph (2) the undertaker must notify the traffic authority of the effect of paragraph (11).
PART 4SUPPLEMENTAL POWERS
Discharge of waterI1919
1
Subject to paragraphs (3) and (4), the undertaker may use any watercourse or any public sewer or drain for the drainage of water in connection with the carrying out or maintenance of the authorised development and for that purpose may lay down, take up and alter pipes and may, on any land within the Order limits, make openings into, and connections with, the watercourse, public sewer or drain.
2
Any dispute arising from the making of connections to or the use of a public sewer or drain by the undertaker under paragraph (1) is to be determined as if it were a dispute under section 106 (right to communicate with public sewers) of the Water Industry Act 199149.
3
The undertaker must not discharge any water into any watercourse, public sewer or drain except with the consent of the person to whom it belongs; and such consent may be given subject to such terms and conditions as that person may reasonably impose, but must not be unreasonably withheld.
4
The undertaker must not make any opening into any public sewer or drain except—
a
in accordance with plans approved by the person to whom the sewer or drain belongs, but such approval must not be unreasonably withheld; and
b
where that person has been given the opportunity to supervise the making of the opening.
5
The undertaker must not, in carrying out or maintaining works under this article, damage or interfere with the bed or banks of any watercourse forming part of a main river.
6
The undertaker must take such steps as are reasonably practicable to secure that any water discharged into a watercourse or public sewer or drain pursuant to this article is as free as may be practicable from gravel, soil or other solid substance, oil or matter in suspension.
7
Nothing in this article overrides the requirement for an environmental permit under regulation 12 (requirement for environmental permit) of the Environmental Permitting (England and Wales) Regulations 201650.
8
In this article—
a
“public sewer or drain” means a sewer or drain which belongs to Homes England, the Environment Agency, an internal drainage board, a joint planning board, a local authority, a sewerage undertaker or an urban development corporation; and
b
other expressions, excluding watercourse, used both in this article and in the Water Resources Act 199151 have the same meaning as in that Act.
9
Subject to the undertaker complying with paragraph (10), if a person who receives an application for consent under paragraph (3) or approval under paragraph (4)(a) fails to notify the undertaker of a decision within 28 days of receiving an application that person will be deemed to have granted consent or given approval, as the case may be.
10
When making an application for consent under paragraph (3) or approval under paragraph (4)(a) the undertaker must notify the person receiving the application of the effect of paragraph (9).
Protective work to buildingsI2020
1
Subject to the following provisions of this article, the undertaker may at its own expense carry out such protective works to any building which may be affected by the authorised development as the undertaker considers necessary or expedient.
2
Protective works may be carried out—
a
at any time before or during the carrying out in the vicinity of the building of any part of the authorised development; or
b
after the completion of that part of the authorised development in the vicinity of the building at any time up to the end of the period of 5 years beginning with the day on which that part of the authorised development is first opened for use.
3
For the purpose of determining how the functions under this article are to be exercised the undertaker may enter and survey any building falling within paragraph (1) and any land within its curtilage.
4
For the purpose of carrying out protective works to a building under this article the undertaker may (subject to paragraphs (5) and (6))—
a
enter the building and any land within its curtilage; and
b
where the works cannot be carried out reasonably conveniently without entering land which is adjacent to the building but outside its curtilage, enter the adjacent land (but not any building erected on it).
5
Before exercising—
a
a right under paragraph (1) to carry out protective works to a building;
b
a right under paragraph (3) to enter and survey any building and any land within its curtilage;
c
a right under paragraph (4)(a) to enter a building and any land within its curtilage; or
d
a right under paragraph (4)(b) to enter land,
the undertaker must, except in the case of emergency, serve on the owners and occupiers of the building or land not less than 14 days’ notice of its intention to exercise that right and, in a case falling within sub-paragraph (a) or (c), specifying the protective works proposed to be carried out.
6
Where a notice is served under paragraph (5)(a), (c) or (d), the owner or occupier of the building or land concerned may, by serving a counter-notice within the period of 10 days beginning with the day on which the notice was served, require the question whether it is necessary or expedient to carry out the protective works or to enter the building or land to be referred to arbitration under article 45 (arbitration).
7
The undertaker must compensate the owners and occupiers of any building or land in relation to which rights under this article have been exercised for any loss or damage arising to them by reason of the exercise of those rights.
8
Where—
a
protective works are carried out under this article to a building; and
b
within the period of 5 years beginning with the day on which the part of the authorised development carried out in the vicinity of the building is first opened for use it appears that the protective works are inadequate to protect the building against damage caused by the carrying out or use of that part of the authorised development,
the undertaker must compensate the owners and occupiers of the building for any loss or damage sustained by them.
9
Nothing in this article relieves the undertaker from any liability to pay compensation under section 15252 (compensation in case where no right to claim in nuisance) of the 2008 Act.
10
Any compensation payable under paragraph (7) or (8) is to be determined, in case of dispute, as if it were a dispute under Part 1 (determination of questions of disputed compensation) of the 1961 Act.
11
In this article “protective works” in relation to a building means—
a
underpinning, strengthening and any other works the purpose of which is to prevent damage which may be caused to the building by the carrying out, maintenance or use of the authorised development; and
b
any works the purpose of which is to remedy any damage which has been caused to the building by the carrying out, maintenance or use of the authorised development.
Authority to survey and investigate the landI2121
1
The undertaker may for the purposes of this Order enter on any land shown within the Order limits or which may be affected by the authorised development and—
a
survey or investigate the land (including any watercourses, ground water, static water bodies or vegetation on the land);
b
without limitation on the scope of sub-paragraph (a), make any excavations, trial holes or boreholes in such positions on the land as the undertaker thinks fit to investigate the nature of the surface layer, subsoil and groundwater and remove soil and water samples and discharge water samples on to the land;
c
without limitation to the scope of sub-paragraph (a), carry out ecological or archaeological investigations on such land, including making any excavations or trial holes on the land for such purposes; and
d
place on, leave on and remove from the land apparatus for use in connection with the survey and investigation of land and making of trial holes or boreholes.
2
No land may be entered or equipment placed or left on or removed from the land under paragraph (1) unless at least 14 days’ notice has been served on every owner and occupier of the land.
3
Any person entering land under this article on behalf of the undertaker—
a
must, if so required, before or after entering the land, produce written evidence of their authority to do so; and
b
may take onto the land such vehicles and equipment as are necessary to carry out the survey or investigation or to make the trial holes or boreholes.
4
No trial holes or boreholes are to be made under this article—
a
in land located within a highway boundary for which the local highway authority is the highway authority without the consent of the local highway authority; or
b
in a private street without the consent of the street authority,
but such consent must not be unreasonably withheld.
5
The undertaker must compensate the owners and occupiers of the land for any loss or damage arising by reason of the exercise of the authority conferred by this article, such compensation to be determined, in case of dispute, as if it were a dispute under Part 1 of the 1961 Act.
6
Subject to the undertaker complying with paragraph (7), if either a local highway authority or a street authority which receives an application for consent fails to notify the undertaker of its decision within 28 days of receiving the application for consent—
a
under paragraph (4)(a) in the case of the local highway authority; or
b
under paragraph (4)(b) in the case of a street authority,
that authority is deemed to have granted consent.
7
When making an application for consent under paragraph (4)(a) or 4(b) the undertaker must notify the local highway authority or the street authority of the effect of paragraph (6).
PART 5POWERS OF ACQUISITION AND POSSESSION
Compulsory acquisition of landI2222
1
The undertaker may acquire compulsorily so much of the Order land as is required for the authorised development, or to facilitate it, or is incidental to it.
2
This article is subject to paragraph (2) of article 25 (compulsory acquisition of rights and restrictive covenants) and paragraph (9) of article 31 (temporary use of land for carrying out the authorised development).
Compulsory acquisition of land – incorporation of the mineral codeI2323
Part 2 of Schedule 2 (minerals) to the Acquisition of Land Act 198153 is incorporated in this Order subject to the modification that for “the acquiring authority” substitute “the undertaker”
.
Time limit for exercise of authority to acquire land compulsorilyI2424
1
After the end of the period of 5 years beginning on the day on which this Order is made—
a
no notice to treat is to be served under Part 1 of the 1965 Act as modified by article 27 (modification of Part 1 of the 1965 Act); and
b
no declaration is to be executed under section 4 (execution of declaration) of the 1981 Act as applied by article 28 (application of the 1981 Act).
2
The authority conferred by article 31 (temporary use of land for carrying out the authorised development) ceases at the end of the period referred to in paragraph (1), except that nothing in this paragraph prevents the undertaker from remaining in possession of land after the end of that period, if the land was entered and possession was taken before the end of that period.
Compulsory acquisition of rights and restrictive covenantsI2525
1
Subject to paragraphs (2) to (4), the undertaker may acquire such rights over the Order land, or impose restrictive covenants affecting the Order land, including rights and restrictive covenants for the benefit of a statutory undertaker or any other person, as may be required for any purpose for which that land may be acquired under article 22 (compulsory acquisition of land) by creating them as well as acquiring rights already in existence.
2
In the case of the Order land specified in column (1) of Schedule 5 (land in which only new rights etc. may be acquired) the undertaker’s powers of compulsory acquisition are limited to the acquisition of such wayleaves, easements, new rights in the land or the imposition of restrictive covenants, as may be required for the purpose specified in relation to that land in column (2) of that Schedule and relating to that part of the authorised development specified in column (3) of that Schedule.
3
The power to impose restrictive covenants under paragraph (1) is exercisable only in respect of the plots specified in column (1) of Schedule 5.
4
Subject to Schedule 2A (counter-notice requiring purchase of land not in notice to treat) to the 1965 Act, (as substituted by paragraph 5(8) of Schedule 6 (modification of compensation and compulsory purchase enactments for creation of new rights and imposition of restrictive covenants)), where the undertaker acquires a right over land or the benefit of a restrictive covenant under paragraph (1) or (2), the undertaker is not required to acquire a greater interest in that land.
5
Schedule 6 has effect for the purpose of modifying the enactments relating to compensation and the provisions of the 1965 Act in their application in relation to the compulsory acquisition under this article of a right over land by the creation of a new right or the imposition of a restrictive covenant.
Private rights over landI2626
1
Subject to the provisions of this article, all private rights over land subject to compulsory acquisition under this Order are extinguished—
a
from the date of acquisition of the land by the undertaker, whether compulsorily or by agreement; or
b
on the date of entry on the land by the undertaker under section 11(1)54 (powers of entry) of the 1965 Act,
whichever is the earlier.
2
Subject to the provisions of this article, all private rights over land subject to the compulsory acquisition of rights or the imposition of restrictive covenants under this Order are extinguished in so far as their continuance would be inconsistent with the exercise of the right or burden of the restrictive covenant—
a
from the date of the acquisition of the right or the benefit of the restrictive covenant by the undertaker, whether compulsorily or by agreement; or
b
on the date of entry on the land by the undertaker under section 11(1) of the 1965 Act,
whichever is the earlier.
3
Subject to the provisions of this article, all private rights over land owned by the undertaker that are within the Order limits are extinguished on commencement of any activity authorised by this Order which interferes with or breaches those rights.
4
Subject to the provisions of this article, all private rights over land of which the undertaker takes temporary possession under this Order are suspended and unenforceable for as long as the undertaker remains in lawful possession of the land.
5
Any person who suffers loss by the extinguishment or suspension of any private right under this article is entitled to compensation in accordance with the terms of section 15255 (compensation in case where no right to claim in nuisance) of the 2008 Act to be determined, in case of dispute, as if it were a dispute under Part 1 of the 1961 Act.
6
This article does not apply in relation to any right to which section 13856 (extinguishment of rights, and removal of apparatus, of statutory undertakers etc.) of the 2008 Act or article 33 (statutory undertakers) applies.
7
Paragraphs (1) to (4) have effect subject to—
a
any notice given by the undertaker before—
i
the completion of the acquisition of the land or the acquisition of the rights or the imposition of restrictive covenants over or affecting the land;
ii
the undertaker’s appropriation of it;
iii
the undertaker’s entry onto it; or
iv
the undertaker’s taking temporary possession of it,
that any or all of those paragraphs do not apply to any right specified in the notice; and
b
any agreement made at any time between the undertaker and the person in or to whom the right in question is vested or belongs.
8
If any such agreement as is referred to in paragraph (7)(b)—
a
is made with a person in or to whom the right is vested or belongs; and
b
is expressed to have effect also for the benefit of those deriving title from or under that person,
it is effective in respect of the persons so deriving title, whether the title was derived before or after the making of the agreement.
9
References in this article to private rights over land include any trust, incident, easement, liberty, privilege, right or advantage annexed to land and adversely affecting other land, including any natural right to support and include restrictions as to the user of land arising by virtue of a contract, agreement or undertaking having that effect.
Modification of Part 1 of the 1965 ActI2727
1
Part 1 of the 1965 Act, as applied to this Order by section 12557 (application of compulsory acquisition provisions) of the 2008 Act is modified as follows.
2
In section 4A(1)58 (extension of time limit during challenge) for “section 23 of the Acquisition of Land Act 1981 (application to the High Court in respect of compulsory purchase order), the three year period mentioned in section 4” substitute “section 118 (legal challenges relating to applications for orders granting development consent) of the Planning Act 2008, the five year period mentioned in article 24 (time limit for exercise of authority to acquire land compulsorily) of the A57 Link Roads Development Consent Order 2022”
.
3
In section 11A59 (powers of entry: further notices of entry)—
a
in subsection 1(a), after “land” insert “under that provision”
;
b
in subsection (2), after “land” insert “under that provision”
.
4
In section 22(2) (expiry of time limit for exercise of compulsory purchase power not to affect acquisition of interests omitted from purchase), for “section 4 of this Act” substitute “article 24 (time limit for exercise of authority to acquire land compulsorily) of the A57 Link Roads Development Consent Order 2022”
.
5
In Schedule 2A60 (counter-notice requiring purchase of land not in notice to treat)—
a
for paragraphs 1(2) and 14(2) substitute—
2
But see article 30(3) (acquisition of subsoil or airspace only) of the A57 Link Roads Development Consent Order 2022, which excludes the acquisition of subsoil or airspace only from this Schedule.
b
after paragraph 29, insert—
PART 4INTERPRETATION
30
In this Schedule, references to entering on and taking possession of land do not include doing so under article 20 (protective work to buildings), 32 (temporary use of land for carrying out the authorised development) or 33 (temporary use of land for maintaining the authorised development) of the A57 Link Roads Development Consent Order 2022.
Application of the 1981 ActI2828
1
The 1981 Act applies as if this Order were a compulsory purchase order.
2
The 1981 Act, as applied by paragraph (1), has effect with the following modifications.
3
In section 1 (application of Act) for subsection (2) substitute—
2
This section applies to any Minister, any local or other public authority or any other body or person authorised to acquire land by means of a compulsory purchase order.
4
In section 561 (earliest date for execution of declaration), in subsection (2), omit the words from “, and this subsection” to the end.
5
Omit section 5A62 (time limit for general vesting declaration).
6
In section 5B(1)63 (extension of time limit during challenge) for “section 23 of the Acquisition of Land Act 1981 (application to High Court in respect of compulsory purchase order), the three year period mentioned in section 5A” substitute “section 118 (legal challenges relating to applications for orders granting development consent) of the Planning Act 2008 the five year period mentioned in article 24 (time limit for exercise of authority to acquire land compulsorily) of the A57 Link Roads Development Consent Order 2022”
.
7
In section 664 (notices after execution of declaration) in subsection (1)(b) for “section 15 of, or paragraph 6 of Schedule 1 to, the Acquisition of Land Act 1981” substitute “section 134 (notice of authorisation of compulsory acquisition) of the Planning Act 2008”
.
8
In section 765 (constructive notice to treat) in subsection (1)(a), omit “(as modified by section 4 of the Acquisition of Land Act 1981)”.
9
In Schedule A166 (counter-notice requiring purchase of land not in general vesting declaration) omit paragraph 1(2).
10
References to the 1965 Act in the 1981 Act are to be construed as references to the 1965 Act as applied by section 125 (application of compulsory acquisition provisions) of the 2008 Act (and as modified by article 27 (modification of Part 1 of the 1965 Act)) to the compulsory acquisition of land under this Order.
Acquisition of subsoil or airspace onlyI2929
1
The undertaker may acquire compulsorily so much of, or such rights in, the subsoil of or the airspace over the land referred to in paragraph (1) of article 22 (compulsory acquisition of land) as may be required for any purpose for which that land may be acquired under that provision instead of acquiring the whole of the land.
2
Where the undertaker acquires any part of, or rights in, the subsoil of or the airspace over the land referred to in paragraph (1), the undertaker is not required to acquire an interest in any other part of the land.
3
The following do not apply in connection with the exercise of the power under paragraph (1) in relation to subsoil or airspace only—
a
Schedule 2A (counter-notice requiring purchase of land not in notice to treat) to the 1965 Act (as modified by article 27 (modification of Part 1 of the 1965 Act));
b
Schedule A1 (counter-notice requiring purchase of land not in general vesting declaration) to the 1981 Act; and
c
Section 153(4A)67 (blighted land: proposed acquisition of part interest; material detriment test) of the 1990 Act.
4
Paragraphs (2) and (3) are to be disregarded where the undertaker acquires a cellar, vault, arch or other construction forming part of a house, building or manufactory or airspace above a house, building or manufactory.
Rights under or over streetsI3030
1
The undertaker may enter on and appropriate so much of the subsoil of, or airspace over, any street within the Order limits as may be required for the purposes of the authorised development and may use the subsoil or airspace for those purposes or any other purpose ancillary to the authorised development.
2
Subject to paragraph (3), the undertaker may exercise any power conferred by paragraph (1) in relation to a street without being required to acquire any part of the street or any easement or right in the street.
3
Paragraph (2) does not apply in relation to—
a
any subway or underground building; or
b
any cellar, vault, arch or other construction in, on or under a street which forms part of a building fronting onto the street.
4
Subject to paragraph (5), any person who is an owner or occupier of land in respect of which the power of appropriation conferred by paragraph (1) is exercised without the undertaker acquiring any part of that person’s interest in the land, and who suffers loss as a result, is entitled to compensation to be determined, in case of dispute, as if it were a dispute under Part 1 of the 1961 Act.
5
Compensation is not payable under paragraph (4) to any person who is a statutory undertaker to whom section 85 (sharing cost of necessary measures) of the 1991 Act applies in respect of measures of which the allowable costs are to be borne in accordance with that section.
Temporary use of land for carrying out the authorised developmentI3131
1
The undertaker may, in connection with the carrying out of the authorised development, and subject to article 24 (time limit for exercise of authority to acquire land compulsorily)—
a
enter on and take temporary possession of—
i
the land specified in column (1) of Schedule 7 (land of which temporary possession may be taken) for the purpose specified in relation to that land in column (2) of that Schedule relating to the part of the authorised development specified in column (3) of that Schedule; and
b
remove any buildings and vegetation from that land;
c
construct temporary works (including the provision of means of access) and buildings on that land; and
d
construct any works on that land as are mentioned in Schedule 1 (authorised development).
2
Not less than 14 days before entering on and taking temporary possession of land under this article the undertaker must serve notice of the intended entry on the owners and occupiers of the land and explain the purpose for which entry is taken in respect of land specified under paragraph (1)(a)(ii).
3
The undertaker must not, without the agreement of the owners of the land, remain in possession of any land under this article—
a
in the case of land specified in paragraph (1)(a)(i), after the end of the period of one year beginning with the date of completion of the part of the authorised development specified in relation to that land in column (3) of Schedule 7; or
b
in the case of any land referred to in paragraph (1)(a)(ii), after the end of the period of one year beginning with the date of completion of the work for which temporary possession of the land was taken unless the undertaker has, by the end of that period, served a notice of entry under section 11 of the 1965 Act or made a declaration under section 4 of the 1981 Act in relation to that land.
4
Before giving up possession of land of which temporary possession has been taken under this article, the undertaker must remove all temporary works and restore the land to the condition it was in on the date on which possession of the land was first taken by the undertaker or such other condition as may be agreed with the owners of the land; but the undertaker is not required to—
a
replace a building removed under this article;
b
restore the land on which any permanent works have been constructed under paragraph (1)(d);
c
remove any ground strengthening works which have been placed on the land to facilitate construction of the authorised development; or
d
remove any measures installed over or around statutory undertakers’ apparatus to protect that apparatus from the authorised development;
5
The undertaker must pay compensation to the owners and occupiers of land of which temporary possession is taken under this article for any loss or damage arising from the exercise in relation to the land of the provisions of this article.
6
Any dispute as to a person’s entitlement to compensation under paragraph (5), or as to the amount of the compensation, is to be determined as if it were a dispute under Part 1 of the 1961 Act.
7
Any dispute as to the removal of temporary works and restoration of land under paragraph (4) does not prevent the undertaker giving up possession of the land.
8
Nothing in this article affects any liability to pay compensation under section 15270 (compensation in case where no right to claim in nuisance) of the 2008 Act or under any other enactment in respect of loss or damage arising from the carrying out of the authorised development, other than loss or damage for which compensation is payable under paragraph (5).
9
The undertaker may not compulsorily acquire under this Order the land referred to in paragraph (1)(a)(i).
10
Where the undertaker takes possession of land under this article, the undertaker is not required to acquire the land or any interest in it.
11
Section 1371 (refusal to give possession to acquiring authority) of the 1965 Act applies to the temporary use of land under this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 (application of compulsory acquisition provisions) of the 2008 Act.
12
The provisions of the Neighbourhood Planning Act 201772 do not apply insofar as they relate to temporary possession of land under this article in relation to the construction of any work or the carrying out of any operation required for the purpose of, or in connection with, the construction of the authorised development.
Temporary use of land for maintaining the authorised developmentI3232
1
Subject to paragraph (2), at any time during the maintenance period relating to any part of the authorised development, the undertaker may—
a
enter upon and take temporary possession of any land within the Order limits if such possession is reasonably required for the purpose of maintaining the authorised development;
b
enter on any land within the Order limits for the purpose of gaining such access as is reasonably required for the purpose of maintaining the authorised development; and
c
construct such temporary works (including the provision of means of access) and buildings on the land as may be reasonably necessary for that purpose.
2
Paragraph (1) does not authorise the undertaker to take temporary possession of—
a
any house or garden belonging to a house; or
b
any building (other than a house) if it is for the time being occupied.
3
Not less than 28 days before entering upon and taking temporary possession of land under this article the undertaker must serve notice of the intended entry on the owners and occupiers of the land and explain the purpose for which entry is taken.
4
The undertaker may only remain in possession of land under this article for so long as may be reasonably necessary to carry out the maintenance of the part of the authorised development for which possession of the land was taken.
5
Before giving up possession of land of which temporary possession has been taken under this article, the undertaker must remove all temporary works and restore the land to the condition it was in on the date on which possession of the land was first taken by the undertaker or such other condition as may be agreed with the owners of the land.
6
The undertaker must pay compensation to the owners and occupiers of land of which temporary possession is taken under this article for any loss or damage arising from the exercise in relation to the land of the powers conferred by this article.
7
Any dispute as to a person’s entitlement to compensation under paragraph (6), or as to the amount of the compensation, is to be determined as if it were a dispute under Part 1 of the 1961 Act.
8
Nothing in this article affects any liability to pay compensation under section 152 (compensation in case where no right to claim in nuisance) of the 2008 Act or under any other enactment in respect of loss or damage arising from the execution of any works, other than loss or damage for which compensation is payable under paragraph (6).
9
Where the undertaker takes possession of land under this article, the undertaker is not required to acquire the land or any interest in it.
10
Section 13 (refusal to give possession to the acquiring authority) of the 1965 Act applies to the temporary use of land under this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 (application of compulsory acquisition provisions) of the 2008 Act.
11
The provisions of the Neighbourhood Planning Act 2017 do not apply insofar as they relate to the temporary possession of land under this article in relation to the maintenance of any part of the authorised development within the maintenance period.
12
In this article “the maintenance period”, in relation to any part of the authorised development means the period of 5 years beginning with the date on which that part of the authorised development is first opened for use.
Statutory undertakersI3333
1
Subject to the provisions of article 25 (compulsory acquisition of rights and restrictive covenants), Schedule 9 (protective provisions), and paragraph (2), the undertaker may—
a
acquire compulsorily, or acquire new rights or impose restrictive covenants over any Order land belonging to statutory undertakers; and
b
extinguish the rights of, or remove or reposition the apparatus belonging to, statutory undertakers over or within the Order land.
2
Paragraph (1)(b) has no effect in relation to apparatus in respect of which the following provisions apply—
a
Part 3 (street works in England and Wales) of the 1991 Act; and
b
article 35 (apparatus and rights of statutory undertakers in stopped up streets).
Apparatus and rights of statutory undertakers in stopped up streetsI3434
1
Where a street is stopped up under article 15 (permanent stopping up and restriction of use of highways, streets and private means of access), any statutory utility whose apparatus is under, in, on, along or across the street has the same powers and rights in respect of that apparatus, subject to the provisions of this article, as if this Order had not been made.
2
Where a street is stopped up under article 15 any statutory utility whose apparatus is under, in, on, over, along or across the street may, and if reasonably requested to do so by the undertaker must—
a
remove the apparatus and place it or other apparatus provided in substitution for it in such other position as the statutory utility may reasonably determine and have power to place it; or
b
provide other apparatus in substitution for the existing apparatus and place it in such position as described in sub-paragraph (a).
3
Subject to the following provisions of this article, the undertaker must pay to any statutory utility an amount equal to the cost reasonably incurred by the utility in or in connection with—
a
the execution of the relocation works required in consequence of the stopping up of the street; and
b
the doing of any other work or thing rendered necessary by the execution of the relocation works.
4
If in the course of the execution of relocation works under paragraph (2)—
a
apparatus of a better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus; or
b
apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was,
and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker, or, in default of agreement, is not determined by arbitration to be necessary, then, if it involves cost in the execution of the relocation works exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which, apart from this paragraph, would be payable to the statutory utility by virtue of paragraph (3) is to be reduced by the amount of that excess.
5
For the purposes of paragraph (4)—
a
an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
b
where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.
6
An amount which, apart from this paragraph, would be payable to a statutory utility in respect of works by virtue of paragraph (3) (and having regard, where relevant, to paragraph (4)) must, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the statutory utility any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.
7
Paragraphs (3) to (6) do not apply where the authorised development constitutes major highway works, major bridge works or major transport works for the purposes of Part 3 of the 1991 Act, but instead—
a
the allowable costs of the relocation works are to be determined in accordance with section 85 (sharing of cost of necessary measures) of that Act and any regulations for the time being having effect under that section; and
b
the allowable costs are to be borne by the undertaker and the statutory utility in such proportions as may be prescribed by any such regulations.
8
In this article—
“apparatus” has the same meaning as in Part 3 of the 1991 Act;
“relocation works” means work executed, or apparatus provided, under paragraph (2); and
“statutory utility” means a statutory undertaker for the purposes of the 1980 Act or a public communications provider as defined in section 151(1) (interpretation of Chapter 1) of the Communications Act 200373.
Recovery of costs of new connectionsI3535
1
Where any apparatus of a public utility undertaker or of a public communications provider is removed under article 34 (statutory undertakers) any person who is the owner or occupier of premises to which a supply was given from that apparatus is entitled to recover from the undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of effecting a connection between the premises and any other apparatus from which a supply is given.
2
Paragraph (1) does not apply in the case of the removal of a public sewer but where such a sewer is removed under article 34, any person who is—
a
the owner or occupier of premises the drains of which communicated with that sewer; or
b
the owner of a private sewer which communicated with that sewer,
is entitled to recover from the undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of making the drain or sewer belonging to that person communicate with any other public sewer or with a private sewerage disposal plant.
3
This article does not have effect in relation to apparatus to which article 35 (apparatus and rights of statutory undertakers in stopped up streets) or Part 3 of the 1991 Act applies.
4
In this article—
“public communications provider” has the same meaning as in section 151(1) of the Communications Act 2003; and
“public utility undertaker” means a gas, water, electricity or sewerage undertaker.
PART 6OPERATIONS
Felling or lopping of trees and removal of hedgerowsI3636
1
The undertaker may fell or lop any tree or shrub within or overhanging land within the Order limits, or cut back its roots, if it reasonably believes it to be necessary to do so to prevent the tree or shrub—
a
from obstructing or interfering with the construction, maintenance or operation of the authorised development or any apparatus used in connection with the authorised development; or
b
from constituting a danger to persons using the authorised development.
2
In carrying out any activity authorised by paragraph (1), the undertaker must—
a
do no unnecessary damage to any tree or shrub;
b
not fell or lop any tree or shrub within or overhanging land within the Order limits or cut back its roots if the tree or shrub is identified as being retained in the environmental statement unless the undertaker reasonably believes it to be necessary to do so for the purposes of the construction or operation of the authorised development and provided that the Secretary of State is satisfied that the felling, lopping or cutting back of roots would not give rise to any materially new or materially worse environmental effects in comparison with those reported in the environmental statement; and
c
pay compensation to any person for any loss or damage arising from such activity.
3
The undertaker may, for the purposes of carrying out the authorised development but subject to paragraph (2), remove (or partially remove, as the case may be) any hedgerow described in Part 1 (hedgerows) of Schedule 8 (hedgerows and trees).
4
The undertaker may, for the purposes of carrying out the authorised development but subject to paragraph (2), remove any hedgerow which is not described in Part 1 of Schedule 8 (hedgerows and trees) with the prior consent of the relevant planning authority.
5
In carrying out any activity authorised by paragraph (4), the undertaker must pay compensation to any person for any loss or damage arising from such activity.
6
Any dispute as to a person’s entitlement to compensation under paragraph (2) (or (5), or as to the amount of compensation, is to be determined as if it were a dispute under Part 1 of the 1961 Act.
7
In this article “hedgerow” has the same meaning as in the Hedgerow Regulations 199774 and includes important hedgerows for the purposes of those regulations.
PART 7MISCELLANEOUS AND GENERAL
Application of landlord and tenant lawI3737
1
This article applies to—
a
any agreement for leasing to any person the whole or any part of the authorised development or the right to operate the same; and
b
any agreement entered into by the undertaker with any person for the construction, maintenance, use or operation of the authorised development, or any part of it,
so far as any such agreement relates to the terms on which any land which is the subject of a lease granted by or under that agreement is to be provided for that person’s use.
2
No enactment or rule of law regulating the rights and obligations of landlords and tenants prejudices the operation of any agreement to which this article applies.
3
No such enactment or rule of law applies in relation to the rights and obligations of the parties to any lease granted by or under any such agreement so as to—
a
exclude or in any respect modify any of the rights and obligations of those parties under the terms of the lease, whether with respect to the termination of the tenancy or any other matter;
b
confer or impose on any such party any right or obligation arising out of or connected with anything done or omitted on or in relation to land which is the subject of the lease, in addition to any such right or obligation provided for by the terms of the lease; or
c
restrict the enforcement (whether by action for damages or otherwise) by any party to the lease of any obligation of any other party under the lease.
Trees subject to tree preservation ordersI3838
1
The undertaker may fell or lop any tree described in Part 2 (trees subject to tree preservation orders) of Schedule 8 (hedgerows and trees) or cut back its roots or undertake such other works described in column (2) of Part 2 of that Schedule relating to the relevant part of the authorised development described in column (3) of that Schedule, if it reasonably believes it to be necessary in order to do so to prevent the tree or shrub—
a
from obstructing or interfering with the construction, maintenance or operation of the authorised development or any apparatus used in connection with the authorised development; or
b
from constituting a danger to passengers or other persons using the authorised development.
2
In carrying out any activity authorised by paragraph (1)—
a
the undertaker must not cause unnecessary damage to any tree or shrub and must pay compensation to any person for any loss or damage arising from such activity; and
b
the duty contained in section 206(1)75 (replacement of trees) of the 1990 Act is not to apply although where possible the undertaker is to seek to replace any trees which are removed.
3
The authority given by paragraph (1) constitutes a deemed consent under the relevant tree preservation order.
4
Any dispute as to a person’s entitlement to compensation under paragraph (2), or as to the amount of compensation, is to be determined as if it were a dispute under Part 1 of the 1961 Act.
Operational land for purposes of the 1990 ActI3939
Development consent granted by this Order is to be treated as specific planning permission for the purposes of section 264(3)(a) (cases in which land is to be treated as not being operational land for the purposes of that Act) of the 1990 Act.
Defence to proceedings in respect of statutory nuisanceI4040
1
Where proceedings are brought under section 82(1) (summary proceedings by person aggrieved by statutory nuisance) of the Environmental Protection Act 199076 in relation to a nuisance falling within paragraph (g) of section 79(1) (noise emitted from premises so as to be prejudicial to health or a nuisance) of that Act no order is to be made, and no fine may be imposed, under section 82(2)77 of that Act if—
a
the defendant shows that the nuisance—
i
relates to premises used by the undertaker for the purposes of or in connection with the construction or maintenance of the authorised development and that the nuisance is attributable to the carrying out of the authorised development in accordance with a notice served under section 60 (control of noise on construction sites), or a consent given under section 61 (prior consent for work on construction sites) of the Control of Pollution Act 197478; or
ii
is a consequence of the construction or maintenance of the authorised development and that it cannot reasonably be avoided; or
b
the defendant shows that the nuisance is a consequence of the use of the authorised development and that it cannot reasonably be avoided.
2
Section 61(9) (consent for work on construction site to include statement that it does not of itself constitute a defence to proceedings under section 82 of the Environmental Protection Act 1990) of the Control of Pollution Act 1974 does not apply where the consent relates to the use of premises by the undertaker for the purposes of or in connection with the construction or maintenance of the authorised development.
Protection of interestsI4141
Schedule 9 (protective provisions) has effect.
Certification of documents, etc.I4242
1
As soon as practicable after the making of this Order, the undertaker must submit copies of each of the plans and documents set out in Schedule 10 (documents to be certified) to the Secretary of State for certification that they are true copies of those plans and documents.
2
Where any plan or document set out in Schedule 10 requires to be amended to reflect the terms of the Secretary of State’s decision to make the Order, that plan or document in the form amended to the Secretary of State’s satisfaction is the version of the plan or document required to be certified under paragraph (1).
3
A plan or document so certified is admissible in any proceedings as evidence of the contents of the document of which it is a copy.
Service of noticesI4343
1
A notice or other document required or authorised to be served for the purposes of this Order may be served—
a
by post;
b
by delivering it to the person on whom it is to be served or to whom it is to be given or supplied; or
c
with the consent of the recipient and subject to paragraphs (5) to (8) by electronic transmission.
2
Where the person on whom a notice or other document to be served for the purposes of this Order is a body corporate, the notice or document is duly served if it is served on the secretary or clerk of that body.
3
For the purposes of section 7 (references to service by post) of the Interpretation Act 197879 as it applies for the purposes of this article, the proper address of any person in relation to the service on that person of a notice or document under paragraph (1) is, if that person has given an address for service, that address, and otherwise—
a
in the case of the secretary or clerk of a body corporate, the registered or principal office of that body; and
b
in any other case, the last known address of that person at the time of service.
4
Where for the purposes of this Order a notice or other document is required or authorised to be served on a person as having any interest in, or as the occupier of, land and the name or address of that person cannot be ascertained after reasonable enquiry, the notice may be served by—
a
addressing it to that person by name or by the description of “owner”, or as the case may be “occupier”, of the land (describing it); and
b
either leaving it in the hands of a person who is or appears to be resident or employed on the land or leaving it conspicuously affixed to some building or object on or near the land.
5
Where a notice or other document required to be served or sent for the purposes of this Order is served or sent by electronic transmission the requirement will be taken to be fulfilled only where—
a
the recipient of the notice or other document to be transmitted has given consent to the use of electronic transmission in writing or by electronic transmission;
b
the notice or document is capable of being accessed by the recipient;
c
the notice or document is legible in all material respects; and
d
the notice or document is in a form sufficiently permanent to be used for subsequent reference.
6
Where the recipient of a notice or other document served or sent by electronic transmission notifies the sender within 7 days of receipt that the recipient requires a paper copy of all or part of that notice or other document the sender must provide such a copy as soon as reasonably practicable.
7
Any consent to the use of electronic communication given by a person may be revoked by that person in accordance with paragraph (8).
8
Where a person is no longer willing to accept the use of electronic transmission for any of the purposes of this Order—
a
that person must give notice in writing or by electronic transmission revoking any consent given by that person for that purpose; and
b
such revocation will be final and will take effect on a date specified by the person in the notice but that date must not be less than 7 days after the date on which the notice is given.
9
This article does not exclude the employment of any method of service not expressly provided for by it.
10
In this article “legible in all material respects” means that the information contained in the notice or document is available to that person to no lesser extent than it would be if served, given or supplied by means of a notice or document in printed form.
ArbitrationI4444
Except where otherwise expressly provided for in this Order and unless otherwise agreed between the parties, any difference under any provision of this Order (other than a difference which falls to be determined by the Lands Chamber of the Upper Tribunal) must be referred to and settled by a single arbitrator to be agreed between the parties or, failing agreement, to be appointed on the application of either party (after giving notice in writing to the other) by the President of the Institution of Civil Engineers.
Signed by authority of the Secretary of State for Transport