http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/2022-12-29The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022enINFRASTRUCTURE PLANNINGStatute Law Database2024-05-20Expert Participation2022-12-29 This Order authorises the undertaker (referred to in this Order as the undertaker) to construct, operate and maintain a power generating station and carbon capture and compression plant. The Order permits the undertaker to acquire, compulsorily or by agreement, land and rights in land and to use land for this purpose. SCHEDULE 1 AUTHORISED DEVELOPMENT Article 2

In the Borough of North Lincolnshire, a nationally significant infrastructure project as defined in sections 14(1)(a) and 15 of the 2008 Act and associated development, comprising—

Work No. 1 – a carbon capture enabled electricity generating station located on land at the Keadby Power Station site, west of Scunthorpe, gas fuelled, and with a gross output capacity of up to 910 megawatts (MWe) at ISO standard reference conditions comprising— a Work No. 1A – a combined cycle gas turbine plant, comprising— i a combined cycle gas turbine; ii a steam turbine; iii gas turbine hall and steam turbine hall; iv heat recovery steam generator; v gas turbine air intake filters; vi emissions stack; vii transformers; viii deaerator and feed water pump house buildings; ix nitrogen oxide emissions control equipment and chemical storage; x chemical sampling / dosing plants; and xi continuous emissions monitoring system. b Work No. 1B – combined cycle gas turbine plant cooling infrastructure, comprising— i hybrid cooling towers; ii cooling water pumps, plant and buildings; and iii cooling water dosing and sampling plant and buildings c Work No. 1C – carbon dioxide capture plant, comprising— i flue gas pre-treatment plant, including cooling and scrubbing plant and flue gas blower; ii carbon dioxide absorber unit(s) and associated stack(s); iii carbon dioxide stripper and solvent regenerator; iv ammonia emissions monitoring and control equipment and associated chemical storage; v carbon dioxide conditioning and compression plant; and vi ancillary equipment, including air compressors, pumps, heat exchangers, water treatment plant and pipework. d Work No. 1D – natural gas reception facility, comprising— i above and below ground valves, flanges and pipework; ii gas supply pipeline connection works; iii gas receiving area; iv gas de-compression equipment and maintenance building and pipeline internal gauge launcher; v an above or below ground isolation valve; vi gas vents; vii gas metering, dehydration and pressure reduction equipment; viii instrumentation and electrical kiosk(s); ix telemetry equipment kiosk(s); and x standby generator sockets. e Work No. 1E - generating station supporting uses, comprising— i administration and control buildings; ii raw water storage tank(s); iii demineralised water treatment plant, including storage tanks; and iv permanent plant laydown area(s) for operation and maintenance activities f In connection with and in addition to Work Nos. 1A, 1B, 1C, 1D and 1E— i administration and control buildings; ii auxiliary plant, buildings, enclosures and structures; iii auxiliary boiler; iv emergency diesel generators and bunded diesel storage tank(s); v chemical storage facilities; vi demineralised water treatment plant, including storage tank; vii firefighting equipment and building; viii fire storage tank(s); ix fire water retention basin; x gatehouses; xi mechanical, electrical, gas, telecommunications and water networks, pipework, pipe runs, cables, racks, infrastructure, instrumentation and utilities including connections between Work Nos 2, 3, 4, 5, 6, 7 and 8, and parts of Work Nos. 1A, 1B, 1C, 1D and 1E; xii permanent plant laydown area(s) for operation and maintenance activities; xiii waste water treatment facilities; and xiv workshop and stores building.

and associated development within the meaning of section 115(2) of the 2008 Act in connection with the nationally significant infrastructure project referred to in Work No. 1, comprising—

Work No. 2 – a high pressure gas supply pipeline for the transport of natural gas to Work No. 1, comprising a high pressure steel pipeline of up to 800 millimetres (nominal bore) in diameter and approximately 0.3km in length, including cathodic protection posts and marker posts, running within the Keadby Power Station site between Work No. 1D and Work No. 2B, and above ground installation comprising— a Work No. 2A – a compound for National Grid Gas’s apparatus, comprising— i an offtake connection from the National Transmission System; ii above and below ground valves, flanges and pipework; iii an above or below ground remotely operated valve; iv an above or below ground remotely operated valve bypass; v an above or below ground pressurisation bridle; vi instrumentation and electrical kiosks; vii pipeline inspection gauge receiving facility; and viii telemetry equipment kiosks and communications equipment, b Work No. 2B – a compound for the undertaker’s apparatus, comprising— i above and below ground valves, flanges and pipework; ii an above or below ground isolation valve; iii an above or below ground pipeline inline gauge launching facility; iv instrumentation and electrical kiosks; and v telemetry equipment kiosks and communications equipment, c in connection with Work Nos. 2A and 2B, access works, vehicle parking, electrical and telecommunications connections, surface water drainage, security fencing and gates, and closed circuit television cameras and columns.

Work No. 3 – electrical connection works for the export and import of electricity to and from national electricity transmission networks and the import of electricity from district electricity transmission networks, comprising— a Work No. 3A – up to 400 kilovolt overground and/or underground electrical cables and control systems cables running from Work No. 1A to the existing National Grid Electricity Transmission substation located west of Chapel Lane, including works within the substation; and b Work No. 3B – up to 132 kilovolt underground electrical cables running from Work No. 1A to the existing Northern Powergrid 132kV substation located at Chapel Lane, including above ground infrastructure works within the substation.

Work No. 4 – water supply connection works to provide cooling and make-up water to Work No. 1, comprising either— a Work No. 4A – underground and/or overground water supply pipeline running between Work No. 1E and the canal including, as necessary, a temporary cofferdam structure, new, upgraded or replacement pipeline, plant, buildings, enclosures, intake structures screens and other structures, cable, temporary moorings, temporary repositioning of existing moorings, access works, vehicle parking, screening, lighting, and signage; or b Work No. 4B – works to the existing cooling water supply pipelines running between Works No. 1E and the existing intake structures within the River Trent, including, as necessary, a temporary cofferdam structure, new, upgraded or replacement pipelines, plant, enclosures, intake structures, cable placement of material, temporary moorings, installation and repositioning of existing hazard dolphins, access works, screening, lighting, and signage.

Work No. 5 – works to discharge used cooling water and treated wastewater comprising works to the existing cooling water discharge pipeline(s) running from Work No. 1B to the existing outfall structures within the River Trent including, as necessary new, upgraded or replacement pipelines, plant, enclosures, outfall structures and other structures and cable.

Work No. 6 – towns water connection to supply towns water to Work No.1 from the supply point east of Chapel Lane including works to the existing towns water pipelines, replacement and new pipelines, plant, enclosures and structures.

Work No. 7 – a high pressure carbon dioxide pipeline for the export of carbon dioxide from Work No. 1C to the National Grid Carbon Gathering Network and above ground carbon dioxide compression and export infrastructure on land at Keadby Power Station, comprising— a Work No. 7A – compressor station comprising deoxygenation, dehydration, and staged compression facilities, and outlet metering and electrical connection; and b Work No. 7B – National Grid above ground infrastructure compound, comprising export connection to the National Grid Carbon Gathering Network, above and below ground valves, flanges and pipework, above or below ground remotely operated valve, above or below ground remotely operated valve bypass, compression facilities, instrumentation and electrical kiosks, electrical connection, inlet metering and telemetry equipment kiosks and communications equipment; c in connection with Work Nos. 7A and 7B, access works, vehicle parking, electrical and telecommunications connections, surface water drainage, security fencing and gates, and closed circuit television cameras and columns.

Work No. 8 – new permanent accesses to Work Nos. 1, 2 and 7 comprising— a Work No. 8A – access route comprising the maintenance and improvement of an existing private track running between Work Nos. 1 and 2 including private bridge and the existing junction with the A18 nearby to the west of Pilfrey Farm, comprising surfacing works and signage, and creation of on and off-slips; b Work No. 8B – installation of laybys and gatehouse building nearby to the north of the junction with the A18, barriers, enclosures, drainage and lighting; c Work No. 8C - emergency access route comprising the installation of a bridge crossing of an existing drainage channel, the maintenance and improvement of an existing private track running between Work No. 1 and Chapel Lane, Keadby, surfacing and strengthening works, drainage, enclosures and lighting.

Work No. 9 – temporary construction and laydown areas and temporary and permanent accesses, comprising— a Work No. 9A – temporary construction and laydown areas comprising hard standing, earthworks and levelling, laydown and open storage areas, contractor compounds and construction staff welfare facilities, surface water drainage and gatehouse and weighbridge. b Work No. 9B – the maintenance and improvement of the existing private tracks connecting the existing junctions with the A18 to the west of Pilfrey Farm with Work No. 9A via two existing private bridge crossings of the Hatfield Waste Drain, including the replacement, widening, improvement and maintenance of the westernmost existing private bridge crossing, surfacing, drainage and strengthening works, barriers and enclosures. c Work No. 9C - temporary construction and laydown area in association with the replacement of the private bridge in Work No. 9B, comprising laydown and open storage areas, hard standing, and the placement of mobile cranes.

Work No. 10 – temporary haulage route and waterborne transport offloading facilities on land east of the Keadby Power Station site and at the River Trent comprising— a Work No. 10A – the maintenance and improvement of the existing temporary paved haulage route and ditch crossings and their subsequent removal; b Work No. 10B – the inspection and repair of the existing jetty, and temporary placement of mobile cranes including the temporary oversailing of crane arms above the River Trent; and c Work No.10C – use of river bed of the River Trent for the mooring of vessels and craft at the waterborne transport offloading area at lower tide.

Work No. 11 – landscaping and planting and boundary treatment comprising— a Works 11A -soft landscaping including planting and biodiversity enhancement measures; and b Works 11B - security fencing, gates, boundary treatment and other means of enclosure;

In connection with and in addition to Works Nos. 1 to 11, further associated development including— a surface water drainage systems, storm water attenuation systems including storage basins, oil water separators, including channelling and culverting and works to existing drainage systems; b electrical, gas, potable water supply, foul water drainage and telecommunications infrastructure connections and works, and works to alter the position of such services and utilities connections; c hard standings and hard landscaping; d soft landscaping, including bunds, embankments and planting; e biodiversity enhancement measures; f fencing, gates, boundary treatment and means of enclosure; g external lighting, including lighting columns; h gatehouses and weighbridges; i closed circuit television cameras and columns and other security measures; j site establishment and preparation works, including site clearance (including vegetation removal, demolition of existing buildings and structures); earthworks (including soil stripping and storage and site levelling and formation of embankments) and excavations; the creation of temporary construction access points; the alteration of the position of services and utilities; and works for the protection of buildings and land; k temporary construction laydown areas and contractor facilities, including materials and plant storage and laydown areas; generators; concrete batching facilities; vehicle and cycle parking facilities; pedestrian and cycle routes and facilities; offices and staff welfare facilities; security fencing and gates; external lighting; roadways and haul routes; wheel wash facilities; and signage; l vehicle parking and cycle storage facilities; m accesses, roads and pedestrian and cycle routes; n tunnelling, boring and drilling works; o demolition; p temporary works associated with the maintenance of the authorised development including laydown for outages, contractor facilities, offices and staff welfare facilities; security fencing and gates; external lighting; wheel wash facilities; and signage; q and, to the extent that it does not form part of such works, further associated development comprising such other works (i) as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised development and (ii) which fall within the scope of the works assessed in the environmental statement.

Sch. 1 in force at 29.12.2022, see art. 1
This XML file does not appear to have any style information associated with it. The document tree is shown below.
<Legislation xmlns="http://www.legislation.gov.uk/namespaces/legislation" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396" NumberOfProvisions="248" RestrictEndDate="2023-04-20" xsi:schemaLocation="http://www.legislation.gov.uk/namespaces/legislation http://www.legislation.gov.uk/schema/legislation.xsd" SchemaVersion="1.0" RestrictStartDate="2022-12-29" RestrictExtent="E+W+S">
<ukm:Metadata xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:dct="http://purl.org/dc/terms/" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:ukm="http://www.legislation.gov.uk/namespaces/metadata">
<dc:identifier>http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/2022-12-29</dc:identifier>
<dc:title>The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022</dc:title>
<dc:language>en</dc:language>
<dc:subject scheme="SIheading">INFRASTRUCTURE PLANNING</dc:subject>
<dc:publisher>Statute Law Database</dc:publisher>
<dc:modified>2024-05-20</dc:modified>
<dc:contributor>Expert Participation</dc:contributor>
<dct:valid>2022-12-29</dct:valid>
<dc:description>This Order authorises the undertaker (referred to in this Order as the undertaker) to construct, operate and maintain a power generating station and carbon capture and compression plant. The Order permits the undertaker to acquire, compulsorily or by agreement, land and rights in land and to use land for this purpose.</dc:description>
<atom:link rel="self" href="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/2022-12-29/data.xml" type="application/xml"/>
<atom:link rel="http://www.legislation.gov.uk/def/navigation/resources" href="http://www.legislation.gov.uk/uksi/2022/1396/resources" title="More Resources"/>
<atom:link rel="http://www.legislation.gov.uk/def/navigation/act" href="http://www.legislation.gov.uk/uksi/2022/1396/2022-12-29" title="whole act"/>
<atom:link rel="http://www.legislation.gov.uk/def/navigation/introduction" href="http://www.legislation.gov.uk/uksi/2022/1396/introduction/2022-12-29" title="introduction"/>
<atom:link rel="http://www.legislation.gov.uk/def/navigation/signature" href="http://www.legislation.gov.uk/uksi/2022/1396/signature/2022-12-29" title="signature"/>
<atom:link rel="http://www.legislation.gov.uk/def/navigation/note" href="http://www.legislation.gov.uk/uksi/2022/1396/note/2022-12-29" title="note"/>
<atom:link rel="http://www.legislation.gov.uk/def/navigation/body" href="http://www.legislation.gov.uk/uksi/2022/1396/body/2022-12-29" title="body"/>
<atom:link rel="http://www.legislation.gov.uk/def/navigation/schedules" href="http://www.legislation.gov.uk/uksi/2022/1396/schedules/2022-12-29" title="schedules"/>
<atom:link rel="alternate" type="application/rdf+xml" href="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/2022-12-29/data.rdf" title="RDF/XML"/>
<atom:link rel="alternate" type="application/akn+xml" href="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/2022-12-29/data.akn" title="AKN"/>
<atom:link rel="alternate" type="application/xhtml+xml" href="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/2022-12-29/data.xht" title="HTML snippet"/>
<atom:link rel="alternate" type="text/html" href="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/2022-12-29/data.htm" title="Website (XHTML) Default View"/>
<atom:link rel="alternate" type="text/csv" href="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/2022-12-29/data.csv" title="CSV"/>
<atom:link rel="alternate" type="application/pdf" href="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/2022-12-29/data.pdf" title="PDF"/>
<atom:link rel="alternate" type="application/akn+xhtml" href="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/2022-12-29/data.html" title="HTML5 snippet"/>
<atom:link rel="http://purl.org/dc/terms/tableOfContents" hreflang="en" href="http://www.legislation.gov.uk/uksi/2022/1396/contents/2022-12-29" title="Table of Contents"/>
<atom:link rel="http://purl.org/dc/terms/hasVersion" href="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/made" title="made"/>
<atom:link rel="http://purl.org/dc/terms/hasVersion" href="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1" title="current"/>
<atom:link rel="up" href="http://www.legislation.gov.uk/uksi/2022/1396/2022-12-29" title="Entire legislation"/>
<atom:link rel="prev" href="http://www.legislation.gov.uk/uksi/2022/1396/signature/2022-12-29" title="Signature; Signature"/>
<atom:link rel="prevInForce" href="http://www.legislation.gov.uk/uksi/2022/1396/signature/2022-12-29" title="Signature; Signature"/>
<atom:link rel="next" href="http://www.legislation.gov.uk/uksi/2022/1396/schedule/2/2022-12-29" title="Schedule; Schedule 2"/>
<atom:link rel="nextInForce" href="http://www.legislation.gov.uk/uksi/2022/1396/schedule/2/2022-12-29" title="Schedule; Schedule 2"/>
<ukm:SecondaryMetadata>
<ukm:DocumentClassification>
<ukm:DocumentCategory Value="secondary"/>
<ukm:DocumentMainType Value="UnitedKingdomStatutoryInstrument"/>
<ukm:DocumentStatus Value="revised"/>
<ukm:DocumentMinorType Value="order"/>
</ukm:DocumentClassification>
<ukm:Year Value="2022"/>
<ukm:Number Value="1396"/>
<ukm:Made Date="2022-12-07"/>
<ukm:ComingIntoForce>
<ukm:DateTime Date="2022-12-29"/>
</ukm:ComingIntoForce>
<ukm:ISBN Value="9780348243307"/>
</ukm:SecondaryMetadata>
<ukm:Alternatives>
<ukm:Alternative URI="http://www.legislation.gov.uk/uksi/2022/1396/pdfs/uksi_20221396_en.pdf" Date="2022-12-28" Size="684505"/>
</ukm:Alternatives>
<ukm:Statistics>
<ukm:TotalParagraphs Value="262"/>
<ukm:BodyParagraphs Value="45"/>
<ukm:ScheduleParagraphs Value="217"/>
<ukm:AttachmentParagraphs Value="0"/>
<ukm:TotalImages Value="0"/>
</ukm:Statistics>
</ukm:Metadata>
<Secondary>
<Schedules RestrictEndDate="2023-04-20" RestrictStartDate="2022-12-29" RestrictExtent="E+W+S">
<Schedule DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1" id="schedule-1" RestrictExtent="E+W+S" RestrictStartDate="2022-12-29">
<Number>
<CommentaryRef Ref="key-b6f523c8579fec609a4135201480ddae"/>
SCHEDULE 1
</Number>
<TitleBlock>
<Title>AUTHORISED DEVELOPMENT</Title>
</TitleBlock>
<Reference>Article 2</Reference>
<ScheduleBody>
<P>
<Text>
<CommentaryRef Ref="key-b6f523c8579fec609a4135201480ddae"/>
In the Borough of North Lincolnshire, a nationally significant infrastructure project as defined in sections 14(1)(a) and 15 of the 2008 Act and associated development, comprising—
</Text>
</P>
<P>
<Text>
<CommentaryRef Ref="key-b6f523c8579fec609a4135201480ddae"/>
<Strong>Work No. 1</Strong>
– a carbon capture enabled electricity generating station located on land at the Keadby Power Station site, west of Scunthorpe, gas fuelled, and with a gross output capacity of up to 910 megawatts (MWe) at ISO standard reference conditions comprising—
</Text>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/an1/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/an1" id="schedule-1-paragraph-an1" shortId="schedule-1-paragraph-a">
<Pnumber>a</Pnumber>
<P3para>
<Text>
<Strong>Work No. 1A</Strong>
– a combined cycle gas turbine plant, comprising—
</Text>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/a/in1/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/a/in1" id="schedule-1-paragraph-a-in1" shortId="schedule-1-paragraph-a-i">
<Pnumber>i</Pnumber>
<P4para>
<Text>a combined cycle gas turbine;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/a/iin1/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/a/iin1" id="schedule-1-paragraph-a-iin1" shortId="schedule-1-paragraph-a-ii">
<Pnumber>ii</Pnumber>
<P4para>
<Text>a steam turbine;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/a/iiin1/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/a/iiin1" id="schedule-1-paragraph-a-iiin1" shortId="schedule-1-paragraph-a-iii">
<Pnumber>iii</Pnumber>
<P4para>
<Text>gas turbine hall and steam turbine hall;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/a/ivn1/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/a/ivn1" id="schedule-1-paragraph-a-ivn1" shortId="schedule-1-paragraph-a-iv">
<Pnumber>iv</Pnumber>
<P4para>
<Text>heat recovery steam generator;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/a/vn1/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/a/vn1" id="schedule-1-paragraph-a-vn1" shortId="schedule-1-paragraph-a-v">
<Pnumber>v</Pnumber>
<P4para>
<Text>gas turbine air intake filters;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/a/vin1/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/a/vin1" id="schedule-1-paragraph-a-vin1" shortId="schedule-1-paragraph-a-vi">
<Pnumber>vi</Pnumber>
<P4para>
<Text>emissions stack;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/a/viin1/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/a/viin1" id="schedule-1-paragraph-a-viin1" shortId="schedule-1-paragraph-a-vii">
<Pnumber>vii</Pnumber>
<P4para>
<Text>transformers;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/a/viiin1/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/a/viiin1" id="schedule-1-paragraph-a-viiin1" shortId="schedule-1-paragraph-a-viii">
<Pnumber>viii</Pnumber>
<P4para>
<Text>deaerator and feed water pump house buildings;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/a/ix/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/a/ix" id="schedule-1-paragraph-a-ix">
<Pnumber>ix</Pnumber>
<P4para>
<Text>nitrogen oxide emissions control equipment and chemical storage;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/a/x/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/a/x" id="schedule-1-paragraph-a-x">
<Pnumber>x</Pnumber>
<P4para>
<Text>chemical sampling / dosing plants; and</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/a/xi/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/a/xi" id="schedule-1-paragraph-a-xi">
<Pnumber>xi</Pnumber>
<P4para>
<Text>continuous emissions monitoring system.</Text>
</P4para>
</P4>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/bn1/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/bn1" id="schedule-1-paragraph-bn1" shortId="schedule-1-paragraph-b">
<Pnumber>b</Pnumber>
<P3para>
<Text>
<Strong>Work No. 1B</Strong>
– combined cycle gas turbine plant cooling infrastructure, comprising—
</Text>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/b/in1/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/b/in1" id="schedule-1-paragraph-b-in1" shortId="schedule-1-paragraph-b-i">
<Pnumber>i</Pnumber>
<P4para>
<Text>hybrid cooling towers;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/b/iin1/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/b/iin1" id="schedule-1-paragraph-b-iin1" shortId="schedule-1-paragraph-b-ii">
<Pnumber>ii</Pnumber>
<P4para>
<Text>cooling water pumps, plant and buildings; and</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/b/iiin1/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/b/iiin1" id="schedule-1-paragraph-b-iiin1" shortId="schedule-1-paragraph-b-iii">
<Pnumber>iii</Pnumber>
<P4para>
<Text>cooling water dosing and sampling plant and buildings</Text>
</P4para>
</P4>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/cn1/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/cn1" id="schedule-1-paragraph-cn1" shortId="schedule-1-paragraph-c">
<Pnumber>c</Pnumber>
<P3para>
<Text>
<Strong>Work No. 1C</Strong>
– carbon dioxide capture plant, comprising—
</Text>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/c/i/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/c/i" id="schedule-1-paragraph-c-i">
<Pnumber>i</Pnumber>
<P4para>
<Text>flue gas pre-treatment plant, including cooling and scrubbing plant and flue gas blower;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/c/ii/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/c/ii" id="schedule-1-paragraph-c-ii">
<Pnumber>ii</Pnumber>
<P4para>
<Text>carbon dioxide absorber unit(s) and associated stack(s);</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/c/iii/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/c/iii" id="schedule-1-paragraph-c-iii">
<Pnumber>iii</Pnumber>
<P4para>
<Text>carbon dioxide stripper and solvent regenerator;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/c/iv/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/c/iv" id="schedule-1-paragraph-c-iv">
<Pnumber>iv</Pnumber>
<P4para>
<Text>ammonia emissions monitoring and control equipment and associated chemical storage;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/c/v/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/c/v" id="schedule-1-paragraph-c-v">
<Pnumber>v</Pnumber>
<P4para>
<Text>carbon dioxide conditioning and compression plant; and</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/c/vi/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/c/vi" id="schedule-1-paragraph-c-vi">
<Pnumber>vi</Pnumber>
<P4para>
<Text>ancillary equipment, including air compressors, pumps, heat exchangers, water treatment plant and pipework.</Text>
</P4para>
</P4>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/dn1/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/dn1" id="schedule-1-paragraph-dn1" shortId="schedule-1-paragraph-d">
<Pnumber>d</Pnumber>
<P3para>
<Text>
<Strong>Work No. 1D</Strong>
– natural gas reception facility, comprising—
</Text>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/d/i/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/d/i" id="schedule-1-paragraph-d-i">
<Pnumber>i</Pnumber>
<P4para>
<Text>above and below ground valves, flanges and pipework;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/d/ii/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/d/ii" id="schedule-1-paragraph-d-ii">
<Pnumber>ii</Pnumber>
<P4para>
<Text>gas supply pipeline connection works;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/d/iii/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/d/iii" id="schedule-1-paragraph-d-iii">
<Pnumber>iii</Pnumber>
<P4para>
<Text>gas receiving area;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/d/iv/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/d/iv" id="schedule-1-paragraph-d-iv">
<Pnumber>iv</Pnumber>
<P4para>
<Text>gas de-compression equipment and maintenance building and pipeline internal gauge launcher;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/d/v/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/d/v" id="schedule-1-paragraph-d-v">
<Pnumber>v</Pnumber>
<P4para>
<Text>an above or below ground isolation valve;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/d/vi/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/d/vi" id="schedule-1-paragraph-d-vi">
<Pnumber>vi</Pnumber>
<P4para>
<Text>gas vents;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/d/vii/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/d/vii" id="schedule-1-paragraph-d-vii">
<Pnumber>vii</Pnumber>
<P4para>
<Text>gas metering, dehydration and pressure reduction equipment;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/d/viii/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/d/viii" id="schedule-1-paragraph-d-viii">
<Pnumber>viii</Pnumber>
<P4para>
<Text>instrumentation and electrical kiosk(s);</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/d/ix/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/d/ix" id="schedule-1-paragraph-d-ix">
<Pnumber>ix</Pnumber>
<P4para>
<Text>telemetry equipment kiosk(s); and</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/d/x/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/d/x" id="schedule-1-paragraph-d-x">
<Pnumber>x</Pnumber>
<P4para>
<Text>standby generator sockets.</Text>
</P4para>
</P4>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/en1/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/en1" id="schedule-1-paragraph-en1" shortId="schedule-1-paragraph-e">
<Pnumber>e</Pnumber>
<P3para>
<Text>
<Strong>Work No. 1E</Strong>
- generating station supporting uses, comprising—
</Text>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/e/i/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/e/i" id="schedule-1-paragraph-e-i">
<Pnumber>i</Pnumber>
<P4para>
<Text>administration and control buildings;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/e/ii/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/e/ii" id="schedule-1-paragraph-e-ii">
<Pnumber>ii</Pnumber>
<P4para>
<Text>raw water storage tank(s);</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/e/iii/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/e/iii" id="schedule-1-paragraph-e-iii">
<Pnumber>iii</Pnumber>
<P4para>
<Text>demineralised water treatment plant, including storage tanks; and</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/e/iv/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/e/iv" id="schedule-1-paragraph-e-iv">
<Pnumber>iv</Pnumber>
<P4para>
<Text>permanent plant laydown area(s) for operation and maintenance activities</Text>
</P4para>
</P4>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/fn1/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/fn1" id="schedule-1-paragraph-fn1" shortId="schedule-1-paragraph-f">
<Pnumber>f</Pnumber>
<P3para>
<Text>In connection with and in addition to Work Nos. 1A, 1B, 1C, 1D and 1E—</Text>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/f/i/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/f/i" id="schedule-1-paragraph-f-i">
<Pnumber>i</Pnumber>
<P4para>
<Text>administration and control buildings;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/f/ii/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/f/ii" id="schedule-1-paragraph-f-ii">
<Pnumber>ii</Pnumber>
<P4para>
<Text>auxiliary plant, buildings, enclosures and structures;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/f/iii/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/f/iii" id="schedule-1-paragraph-f-iii">
<Pnumber>iii</Pnumber>
<P4para>
<Text>auxiliary boiler;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/f/iv/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/f/iv" id="schedule-1-paragraph-f-iv">
<Pnumber>iv</Pnumber>
<P4para>
<Text>emergency diesel generators and bunded diesel storage tank(s);</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/f/v/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/f/v" id="schedule-1-paragraph-f-v">
<Pnumber>v</Pnumber>
<P4para>
<Text>chemical storage facilities;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/f/vi/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/f/vi" id="schedule-1-paragraph-f-vi">
<Pnumber>vi</Pnumber>
<P4para>
<Text>demineralised water treatment plant, including storage tank;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/f/vii/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/f/vii" id="schedule-1-paragraph-f-vii">
<Pnumber>vii</Pnumber>
<P4para>
<Text>firefighting equipment and building;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/f/viii/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/f/viii" id="schedule-1-paragraph-f-viii">
<Pnumber>viii</Pnumber>
<P4para>
<Text>fire storage tank(s);</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/f/ix/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/f/ix" id="schedule-1-paragraph-f-ix">
<Pnumber>ix</Pnumber>
<P4para>
<Text>fire water retention basin;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/f/x/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/f/x" id="schedule-1-paragraph-f-x">
<Pnumber>x</Pnumber>
<P4para>
<Text>gatehouses;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/f/xi/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/f/xi" id="schedule-1-paragraph-f-xi">
<Pnumber>xi</Pnumber>
<P4para>
<Text>mechanical, electrical, gas, telecommunications and water networks, pipework, pipe runs, cables, racks, infrastructure, instrumentation and utilities including connections between Work Nos 2, 3, 4, 5, 6, 7 and 8, and parts of Work Nos. 1A, 1B, 1C, 1D and 1E;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/f/xii/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/f/xii" id="schedule-1-paragraph-f-xii">
<Pnumber>xii</Pnumber>
<P4para>
<Text>permanent plant laydown area(s) for operation and maintenance activities;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/f/xiii/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/f/xiii" id="schedule-1-paragraph-f-xiii">
<Pnumber>xiii</Pnumber>
<P4para>
<Text>waste water treatment facilities; and</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/f/xiv/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/f/xiv" id="schedule-1-paragraph-f-xiv">
<Pnumber>xiv</Pnumber>
<P4para>
<Text>workshop and stores building.</Text>
</P4para>
</P4>
</P3para>
</P3>
</P>
<P>
<Text>
<CommentaryRef Ref="key-b6f523c8579fec609a4135201480ddae"/>
and associated development within the meaning of section 115(2) of the 2008 Act in connection with the nationally significant infrastructure project referred to in Work No. 1, comprising—
</Text>
</P>
<P>
<Text>
<CommentaryRef Ref="key-b6f523c8579fec609a4135201480ddae"/>
<Strong>Work No. 2</Strong>
– a high pressure gas supply pipeline for the transport of natural gas to Work No. 1, comprising a high pressure steel pipeline of up to 800 millimetres (nominal bore) in diameter and approximately 0.3km in length, including cathodic protection posts and marker posts, running within the Keadby Power Station site between Work No. 1D and Work No. 2B, and above ground installation comprising—
</Text>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/an2/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/an2" id="schedule-1-paragraph-an2" shortId="schedule-1-paragraph-a">
<Pnumber>a</Pnumber>
<P3para>
<Text>
<Strong>Work No. 2A</Strong>
– a compound for National Grid Gas’s apparatus, comprising—
</Text>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/a/in2/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/a/in2" id="schedule-1-paragraph-a-in2" shortId="schedule-1-paragraph-a-i">
<Pnumber>i</Pnumber>
<P4para>
<Text>an offtake connection from the National Transmission System;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/a/iin2/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/a/iin2" id="schedule-1-paragraph-a-iin2" shortId="schedule-1-paragraph-a-ii">
<Pnumber>ii</Pnumber>
<P4para>
<Text>above and below ground valves, flanges and pipework;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/a/iiin2/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/a/iiin2" id="schedule-1-paragraph-a-iiin2" shortId="schedule-1-paragraph-a-iii">
<Pnumber>iii</Pnumber>
<P4para>
<Text>an above or below ground remotely operated valve;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/a/ivn2/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/a/ivn2" id="schedule-1-paragraph-a-ivn2" shortId="schedule-1-paragraph-a-iv">
<Pnumber>iv</Pnumber>
<P4para>
<Text>an above or below ground remotely operated valve bypass;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/a/vn2/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/a/vn2" id="schedule-1-paragraph-a-vn2" shortId="schedule-1-paragraph-a-v">
<Pnumber>v</Pnumber>
<P4para>
<Text>an above or below ground pressurisation bridle;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/a/vin2/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/a/vin2" id="schedule-1-paragraph-a-vin2" shortId="schedule-1-paragraph-a-vi">
<Pnumber>vi</Pnumber>
<P4para>
<Text>instrumentation and electrical kiosks;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/a/viin2/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/a/viin2" id="schedule-1-paragraph-a-viin2" shortId="schedule-1-paragraph-a-vii">
<Pnumber>vii</Pnumber>
<P4para>
<Text>pipeline inspection gauge receiving facility; and</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/a/viiin2/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/a/viiin2" id="schedule-1-paragraph-a-viiin2" shortId="schedule-1-paragraph-a-viii">
<Pnumber>viii</Pnumber>
<P4para>
<Text>telemetry equipment kiosks and communications equipment,</Text>
</P4para>
</P4>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/bn2/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/bn2" id="schedule-1-paragraph-bn2" shortId="schedule-1-paragraph-b">
<Pnumber>b</Pnumber>
<P3para>
<Text>
<Strong>Work No. 2B</Strong>
– a compound for the undertaker’s apparatus, comprising—
</Text>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/b/in2/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/b/in2" id="schedule-1-paragraph-b-in2" shortId="schedule-1-paragraph-b-i">
<Pnumber>i</Pnumber>
<P4para>
<Text>above and below ground valves, flanges and pipework;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/b/iin2/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/b/iin2" id="schedule-1-paragraph-b-iin2" shortId="schedule-1-paragraph-b-ii">
<Pnumber>ii</Pnumber>
<P4para>
<Text>an above or below ground isolation valve;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/b/iiin2/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/b/iiin2" id="schedule-1-paragraph-b-iiin2" shortId="schedule-1-paragraph-b-iii">
<Pnumber>iii</Pnumber>
<P4para>
<Text>an above or below ground pipeline inline gauge launching facility;</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/b/iv/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/b/iv" id="schedule-1-paragraph-b-iv">
<Pnumber>iv</Pnumber>
<P4para>
<Text>instrumentation and electrical kiosks; and</Text>
</P4para>
</P4>
<P4 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/b/v/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/b/v" id="schedule-1-paragraph-b-v">
<Pnumber>v</Pnumber>
<P4para>
<Text>telemetry equipment kiosks and communications equipment,</Text>
</P4para>
</P4>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/cn2/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/cn2" id="schedule-1-paragraph-cn2" shortId="schedule-1-paragraph-c">
<Pnumber>c</Pnumber>
<P3para>
<Text>in connection with Work Nos. 2A and 2B, access works, vehicle parking, electrical and telecommunications connections, surface water drainage, security fencing and gates, and closed circuit television cameras and columns.</Text>
</P3para>
</P3>
</P>
<P>
<Text>
<CommentaryRef Ref="key-b6f523c8579fec609a4135201480ddae"/>
<Strong>Work No. 3</Strong>
– electrical connection works for the export and import of electricity to and from national electricity transmission networks and the import of electricity from district electricity transmission networks, comprising—
</Text>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/an3/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/an3" id="schedule-1-paragraph-an3" shortId="schedule-1-paragraph-a">
<Pnumber>a</Pnumber>
<P3para>
<Text>
<Strong>Work No. 3A</Strong>
– up to 400 kilovolt overground and/or underground electrical cables and control systems cables running from Work No. 1A to the existing National Grid Electricity Transmission substation located west of Chapel Lane, including works within the substation; and
</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/bn3/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/bn3" id="schedule-1-paragraph-bn3" shortId="schedule-1-paragraph-b">
<Pnumber>b</Pnumber>
<P3para>
<Text>
<Strong>Work No. 3B</Strong>
– up to 132 kilovolt underground electrical cables running from Work No. 1A to the existing Northern Powergrid 132kV substation located at Chapel Lane, including above ground infrastructure works within the substation.
</Text>
</P3para>
</P3>
</P>
<P>
<Text>
<CommentaryRef Ref="key-b6f523c8579fec609a4135201480ddae"/>
<Strong>Work No. 4</Strong>
– water supply connection works to provide cooling and make-up water to Work No. 1, comprising either—
</Text>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/an4/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/an4" id="schedule-1-paragraph-an4" shortId="schedule-1-paragraph-a">
<Pnumber>a</Pnumber>
<P3para>
<Text>
<Strong>Work No. 4A</Strong>
– underground and/or overground water supply pipeline running between Work No. 1E and the canal including, as necessary, a temporary cofferdam structure, new, upgraded or replacement pipeline, plant, buildings, enclosures, intake structures screens and other structures, cable, temporary moorings, temporary repositioning of existing moorings, access works, vehicle parking, screening, lighting, and signage; or
</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/bn4/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/bn4" id="schedule-1-paragraph-bn4" shortId="schedule-1-paragraph-b">
<Pnumber>b</Pnumber>
<P3para>
<Text>
<Strong>Work No. 4B</Strong>
– works to the existing cooling water supply pipelines running between Works No. 1E and the existing intake structures within the River Trent, including, as necessary, a temporary cofferdam structure, new, upgraded or replacement pipelines, plant, enclosures, intake structures, cable placement of material, temporary moorings, installation and repositioning of existing hazard dolphins, access works, screening, lighting, and signage.
</Text>
</P3para>
</P3>
</P>
<P>
<Text>
<CommentaryRef Ref="key-b6f523c8579fec609a4135201480ddae"/>
<Strong>Work No. 5</Strong>
– works to discharge used cooling water and treated wastewater comprising works to the existing cooling water discharge pipeline(s) running from Work No. 1B to the existing outfall structures within the River Trent including, as necessary new, upgraded or replacement pipelines, plant, enclosures, outfall structures and other structures and cable.
</Text>
</P>
<P>
<Text>
<CommentaryRef Ref="key-b6f523c8579fec609a4135201480ddae"/>
<Strong>Work No. 6</Strong>
– towns water connection to supply towns water to Work No.1 from the supply point east of Chapel Lane including works to the existing towns water pipelines, replacement and new pipelines, plant, enclosures and structures.
</Text>
</P>
<P>
<Text>
<CommentaryRef Ref="key-b6f523c8579fec609a4135201480ddae"/>
<Strong>Work No. 7</Strong>
– a high pressure carbon dioxide pipeline for the export of carbon dioxide from Work No. 1C to the National Grid Carbon Gathering Network and above ground carbon dioxide compression and export infrastructure on land at Keadby Power Station, comprising—
</Text>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/an5/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/an5" id="schedule-1-paragraph-an5" shortId="schedule-1-paragraph-a">
<Pnumber>a</Pnumber>
<P3para>
<Text>
<Strong>Work No. 7A</Strong>
– compressor station comprising deoxygenation, dehydration, and staged compression facilities, and outlet metering and electrical connection; and
</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/bn5/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/bn5" id="schedule-1-paragraph-bn5" shortId="schedule-1-paragraph-b">
<Pnumber>b</Pnumber>
<P3para>
<Text>
<Strong>Work No. 7B</Strong>
– National Grid above ground infrastructure compound, comprising export connection to the National Grid Carbon Gathering Network, above and below ground valves, flanges and pipework, above or below ground remotely operated valve, above or below ground remotely operated valve bypass, compression facilities, instrumentation and electrical kiosks, electrical connection, inlet metering and telemetry equipment kiosks and communications equipment;
</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/cn3/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/cn3" id="schedule-1-paragraph-cn3" shortId="schedule-1-paragraph-c">
<Pnumber>c</Pnumber>
<P3para>
<Text>in connection with Work Nos. 7A and 7B, access works, vehicle parking, electrical and telecommunications connections, surface water drainage, security fencing and gates, and closed circuit television cameras and columns.</Text>
</P3para>
</P3>
</P>
<P>
<Text>
<CommentaryRef Ref="key-b6f523c8579fec609a4135201480ddae"/>
<Strong>Work No. 8</Strong>
– new permanent accesses to Work Nos. 1, 2 and 7 comprising—
</Text>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/an6/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/an6" id="schedule-1-paragraph-an6" shortId="schedule-1-paragraph-a">
<Pnumber>a</Pnumber>
<P3para>
<Text>
<Strong>Work No. 8A</Strong>
– access route comprising the maintenance and improvement of an existing private track running between Work Nos. 1 and 2 including private bridge and the existing junction with the A18 nearby to the west of Pilfrey Farm, comprising surfacing works and signage, and creation of on and off-slips;
</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/bn6/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/bn6" id="schedule-1-paragraph-bn6" shortId="schedule-1-paragraph-b">
<Pnumber>b</Pnumber>
<P3para>
<Text>
<Strong>Work No. 8B</Strong>
– installation of laybys and gatehouse building nearby to the north of the junction with the A18, barriers, enclosures, drainage and lighting;
</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/cn4/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/cn4" id="schedule-1-paragraph-cn4" shortId="schedule-1-paragraph-c">
<Pnumber>c</Pnumber>
<P3para>
<Text>
<Strong>Work No. 8C</Strong>
- emergency access route comprising the installation of a bridge crossing of an existing drainage channel, the maintenance and improvement of an existing private track running between Work No. 1 and Chapel Lane, Keadby, surfacing and strengthening works, drainage, enclosures and lighting.
</Text>
</P3para>
</P3>
</P>
<P>
<Text>
<CommentaryRef Ref="key-b6f523c8579fec609a4135201480ddae"/>
<Strong>Work No. 9</Strong>
– temporary construction and laydown areas and temporary and permanent accesses, comprising—
</Text>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/an7/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/an7" id="schedule-1-paragraph-an7" shortId="schedule-1-paragraph-a">
<Pnumber>a</Pnumber>
<P3para>
<Text>
<Strong>Work No. 9A</Strong>
– temporary construction and laydown areas comprising hard standing, earthworks and levelling, laydown and open storage areas, contractor compounds and construction staff welfare facilities, surface water drainage and gatehouse and weighbridge.
</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/bn7/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/bn7" id="schedule-1-paragraph-bn7" shortId="schedule-1-paragraph-b">
<Pnumber>b</Pnumber>
<P3para>
<Text>
<Strong>Work No. 9B</Strong>
– the maintenance and improvement of the existing private tracks connecting the existing junctions with the A18 to the west of Pilfrey Farm with Work No. 9A via two existing private bridge crossings of the Hatfield Waste Drain, including the replacement, widening, improvement and maintenance of the westernmost existing private bridge crossing, surfacing, drainage and strengthening works, barriers and enclosures.
</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/cn5/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/cn5" id="schedule-1-paragraph-cn5" shortId="schedule-1-paragraph-c">
<Pnumber>c</Pnumber>
<P3para>
<Text>
<Strong>Work No. 9C</Strong>
- temporary construction and laydown area in association with the replacement of the private bridge in Work No. 9B, comprising laydown and open storage areas, hard standing, and the placement of mobile cranes.
</Text>
</P3para>
</P3>
</P>
<P>
<Text>
<CommentaryRef Ref="key-b6f523c8579fec609a4135201480ddae"/>
<Strong>Work No. 10</Strong>
– temporary haulage route and waterborne transport offloading facilities on land east of the Keadby Power Station site and at the River Trent comprising—
</Text>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/an8/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/an8" id="schedule-1-paragraph-an8" shortId="schedule-1-paragraph-a">
<Pnumber>a</Pnumber>
<P3para>
<Text>
<Strong>Work No. 10A</Strong>
– the maintenance and improvement of the existing temporary paved haulage route and ditch crossings and their subsequent removal;
</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/bn8/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/bn8" id="schedule-1-paragraph-bn8" shortId="schedule-1-paragraph-b">
<Pnumber>b</Pnumber>
<P3para>
<Text>
<Strong>Work No. 10B</Strong>
– the inspection and repair of the existing jetty, and temporary placement of mobile cranes including the temporary oversailing of crane arms above the River Trent; and
</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/cn6/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/cn6" id="schedule-1-paragraph-cn6" shortId="schedule-1-paragraph-c">
<Pnumber>c</Pnumber>
<P3para>
<Text>
<Strong>Work No.</Strong>
<Strong>10C</Strong>
– use of river bed of the River Trent for the mooring of vessels and craft at the waterborne transport offloading area at lower tide.
</Text>
</P3para>
</P3>
</P>
<P>
<Text>
<CommentaryRef Ref="key-b6f523c8579fec609a4135201480ddae"/>
<Strong>Work No. 11</Strong>
– landscaping and planting and boundary treatment comprising—
</Text>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/an9/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/an9" id="schedule-1-paragraph-an9" shortId="schedule-1-paragraph-a">
<Pnumber>a</Pnumber>
<P3para>
<Text>
<Strong>Works 11A</Strong>
-soft landscaping including planting and biodiversity enhancement measures; and
</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/bn9/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/bn9" id="schedule-1-paragraph-bn9" shortId="schedule-1-paragraph-b">
<Pnumber>b</Pnumber>
<P3para>
<Text>
<Strong>Works 11B</Strong>
- security fencing, gates, boundary treatment and other means of enclosure;
</Text>
</P3para>
</P3>
</P>
<P>
<Text>
<CommentaryRef Ref="key-b6f523c8579fec609a4135201480ddae"/>
In connection with and in addition to Works Nos. 1 to 11, further associated development including—
</Text>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/an10/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/an10" id="schedule-1-paragraph-an10" shortId="schedule-1-paragraph-a">
<Pnumber>a</Pnumber>
<P3para>
<Text>surface water drainage systems, storm water attenuation systems including storage basins, oil water separators, including channelling and culverting and works to existing drainage systems;</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/bn10/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/bn10" id="schedule-1-paragraph-bn10" shortId="schedule-1-paragraph-b">
<Pnumber>b</Pnumber>
<P3para>
<Text>electrical, gas, potable water supply, foul water drainage and telecommunications infrastructure connections and works, and works to alter the position of such services and utilities connections;</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/cn7/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/cn7" id="schedule-1-paragraph-cn7" shortId="schedule-1-paragraph-c">
<Pnumber>c</Pnumber>
<P3para>
<Text>hard standings and hard landscaping;</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/dn2/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/dn2" id="schedule-1-paragraph-dn2" shortId="schedule-1-paragraph-d">
<Pnumber>d</Pnumber>
<P3para>
<Text>soft landscaping, including bunds, embankments and planting;</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/en2/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/en2" id="schedule-1-paragraph-en2" shortId="schedule-1-paragraph-e">
<Pnumber>e</Pnumber>
<P3para>
<Text>biodiversity enhancement measures;</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/fn2/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/fn2" id="schedule-1-paragraph-fn2" shortId="schedule-1-paragraph-f">
<Pnumber>f</Pnumber>
<P3para>
<Text>fencing, gates, boundary treatment and means of enclosure;</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/g/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/g" id="schedule-1-paragraph-g">
<Pnumber>g</Pnumber>
<P3para>
<Text>external lighting, including lighting columns;</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/h/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/h" id="schedule-1-paragraph-h">
<Pnumber>h</Pnumber>
<P3para>
<Text>gatehouses and weighbridges;</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/i/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/i" id="schedule-1-paragraph-i">
<Pnumber>i</Pnumber>
<P3para>
<Text>closed circuit television cameras and columns and other security measures;</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/j/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/j" id="schedule-1-paragraph-j">
<Pnumber>j</Pnumber>
<P3para>
<Text>site establishment and preparation works, including site clearance (including vegetation removal, demolition of existing buildings and structures); earthworks (including soil stripping and storage and site levelling and formation of embankments) and excavations; the creation of temporary construction access points; the alteration of the position of services and utilities; and works for the protection of buildings and land;</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/k/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/k" id="schedule-1-paragraph-k">
<Pnumber>k</Pnumber>
<P3para>
<Text>temporary construction laydown areas and contractor facilities, including materials and plant storage and laydown areas; generators; concrete batching facilities; vehicle and cycle parking facilities; pedestrian and cycle routes and facilities; offices and staff welfare facilities; security fencing and gates; external lighting; roadways and haul routes; wheel wash facilities; and signage;</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/l/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/l" id="schedule-1-paragraph-l">
<Pnumber>l</Pnumber>
<P3para>
<Text>vehicle parking and cycle storage facilities;</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/m/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/m" id="schedule-1-paragraph-m">
<Pnumber>m</Pnumber>
<P3para>
<Text>accesses, roads and pedestrian and cycle routes;</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/n/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/n" id="schedule-1-paragraph-n">
<Pnumber>n</Pnumber>
<P3para>
<Text>tunnelling, boring and drilling works;</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/o/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/o" id="schedule-1-paragraph-o">
<Pnumber>o</Pnumber>
<P3para>
<Text>demolition;</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/p/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/p" id="schedule-1-paragraph-p">
<Pnumber>p</Pnumber>
<P3para>
<Text>temporary works associated with the maintenance of the authorised development including laydown for outages, contractor facilities, offices and staff welfare facilities; security fencing and gates; external lighting; wheel wash facilities; and signage;</Text>
</P3para>
</P3>
<P3 DocumentURI="http://www.legislation.gov.uk/uksi/2022/1396/schedule/1/paragraph/q/2022-12-29" IdURI="http://www.legislation.gov.uk/id/uksi/2022/1396/schedule/1/paragraph/q" id="schedule-1-paragraph-q">
<Pnumber>q</Pnumber>
<P3para>
<Text>and, to the extent that it does not form part of such works, further associated development comprising such other works (i) as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised development and (ii) which fall within the scope of the works assessed in the environmental statement.</Text>
</P3para>
</P3>
</P>
</ScheduleBody>
</Schedule>
</Schedules>
</Secondary>
<Commentaries>
<Commentary Type="I" id="key-b6f523c8579fec609a4135201480ddae">
<Para>
<Text>
Sch. 1 in force at 29.12.2022, see
<CitationSubRef id="nca0c71d66644034f" SectionRef="article-1" URI="http://www.legislation.gov.uk/id/uksi/2022/1396/article/1" Operative="true">art. 1</CitationSubRef>
</Text>
</Para>
</Commentary>
</Commentaries>
</Legislation>