SCHEDULE 1SCHEDULED WORKS

In the County of Cambridgeshire, City of Cambridgeshire and District of South Cambridgeshire

In the County of Cambridgeshire, City of Cambridge—

Work No. 1 – A railway (Down Cambridge Loop Line) (580 metres in length) on the western side of the course of the existing railway (Bethnal Green to King’s Lynn line) commencing 20 metres north of Long Road (A1134) overbridge and terminating at Work No.3.

Work No. 2 – A railway (Up Cambridge Loop Line) (586 metres in length) on the eastern side of the course of the existing railway (Bethnal Green to King’s Lynn line) commencing 20 metres north of Long Road (A1134) overbridge and terminating at Work No.3.

Work No. 3 – A new station (Cambridge South) located directly south of the (Guided Busway) overbridge consisting four new platforms and associated railway lines, a station footbridge with stairs and lifts, high level concourse, eastern and western entrance buildings with ticketing and staffing facilities and associated forecourt areas and a secondary means of escape footbridge.

Work No. 4 – A new path (pedestrian and cycling) (378 metres in length) commencing at the Guided Busway route on the west side of Hobson’s Park and terminating at Work No. 3.

Work No. 5 – A new pedestrian path (96 metres in length) including an at grade crossing over the Guided Busway commencing at Work No.4 in Hobson’s Park and terminating 96 metres on the north of its commencement on the north of the Guided Busway route within the Active Recreation Area.

Work No. 6 – A railway (Down Cambridge Loop Line) (448 metres in length) on the western side of the course of the existing railway (Bethnal Green to King’s Lynn line) commencing at Work No.3 and terminating 110 metres south of Addenbrookes Road (Nine Wells) overbridge, railway systems compound, drainage works and features.

Work No. 7 – A railway (Up Cambridge Loop Line) (447 metres in length) on the eastern side of the course of the existing railway (Bethnal Green to King’s Lynn line) commencing at Work No.3 and terminating 108 metres south of Addenbrookes Road (Nine Wells) overbridge.

In the County of Cambridgeshire, District of South Cambridgeshire, Parish of Great Shelford—

Work No. 8 – Realignment of the railway (Down Shepreth Branch Line) (1036 metres in length) on the western side of the existing railway commencing 775 metres south of Addenbrookes Road (Nine Wells) overbridge and terminating 25 metres east of Cambridge Road overbridge, works include the relocation of the existing telecommunications mast and associated equipment and the installation of a new equipment building.

Work No. 9 – A crossover (138 metres in length) between the Up and Down railway lines of the existing railway (Bethnal Green to King’s Lynn line) commencing 35 metres south of Dukes No.2 Level Crossing and terminating 138 metres south of its commencement.

Work No. 10 – Realignment of the railway (Up Shepreth Branch Line) (502 metres in length) on the eastern side of the existing railway commencing 200 metres north of Webster Level Crossing and terminating 25 metres east of Cambridge Road overbridge.

In the County of Cambridgeshire, City of Cambridge and District of South Cambridgeshire, Parish of Great Shelford—

Work No. 11 – Agricultural accommodation bridge over the Hobson’s Brook 420m west of the railway, commencing at a point 25 metres south of Addenbrookes Road and terminating at a point 82 metres south of its commencement.