xmlns:atom="http://www.w3.org/2005/Atom"

PART 3Amendment of the Renewable Heat Incentive Scheme Regulations 2018

Amendment of Schedule 2 (information required for modification of installation capacity, extension applications, accreditation or registration)

46.  In Schedule 2 (information required for modification of installation capacity, extension applications, accreditation or registration), in paragraph 1(2)(q)(ii), for “BS EN 12831:2003” substitute “BS EN 12831-1:2017(1) or a subsequent version of that standard”.

(1)

Energy performance of buildings. Method for calculation of the design heat load – Space heating load, Module M3-3 (ISBN 978 0 580 87448 2). Published by the British Standards Institution on 31st July 2017.