Print Options
PrintThe Whole
Instrument
PrintThe Whole
Schedule
PrintThis
Section
only
Status:
This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
2. In this Schedule—
“accumulation” means any accumulation of silt or other material which constitutes an impediment to navigation;
“construction” includes execution and placing, maintenance, extension, enlargement, alteration, replacement, relaying, and removal, and “construct” and “constructed” are to be construed accordingly;
“erosion” means any erosion of the bed or banks of the river or any jetty or other structure of whatever nature owned or occupied by the Harbour Authority;
“harbour property” means any land or works owned or administered by the Harbour Authority as part of its harbour undertaking at the Port of Bridgwater;
“plans” includes sections, descriptions, drawings, specifications and method statements;
“specified work” means so much of any permanent or temporary work authorised by this Order (which includes any removal of gravel or other material, any dredging or similar work and any geotechnical investigations that may be undertaken) as is on, in, under or over—
(a)
the surface of land below the level of mean high water springs forming part of the river;
(b)
any other harbour property.
Back to top