Sch. 1 Pt. 3 para. 21 in force at 22.4.2022, see art. 1(2)

Words in Sch. 1 Pt. 3 para. 21(1)(e) omitted (22.12.2022) by virtue of The East Anglia TWO Offshore Wind Farm (Correction) Order 2022 (S.I. 2022/1399), art. 1(2), Sch.

http://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/21The East Anglia TWO Offshore Wind Farm Order 2022enINFRASTRUCTURE PLANNINGStatute Law Database2024-05-20Expert Participation2022-12-22This Order grants development consent for, and authorises East Anglia TWO Limited to construct, operate and maintain a generating station located in the North Sea approximately 37.3km from the port of Lowestoft and 32.6km from Southwold together with all necessary and associated development. For the purposes of the development that it authorises East Anglia TWO Limited is authorised by the Order compulsorily or by agreement to purchase land and rights in land to use land, as well as to override easements and other rights. The Order also provides a defence in proceedings in respect of statutory nuisance and to discharge water. The Order imposes requirements in connection with the development for which it grants development consent.SCHEDULE 1Authorised projectPART 3Requirements21Ecological management plan1

No stage of the onshore works may commence until for that stage a written ecological management plan (which accords with the outline landscape and ecological management strategy) reflecting pre-construction survey results, and the ecological mitigation measures included in the environmental statement and including—

a

a breeding bird protection plan;

b

an arboricultural method statement;

c

an invasive species method statement;

d

where appropriate, a special protection area crossing method statement (which accords with the outline SPA crossing method statement); and

e

a precautionary method ... of working for reptiles;

has been submitted to and approved by the relevant planning authority in consultation with the relevant statutory nature conservation body.

2

Onshore preparation works may not be carried out until a written ecological management plan (which accords with the outline landscape and ecological management strategy) for those works reflecting survey results and the ecological mitigation measures included in the environmental statement has been submitted to and approved by the relevant planning authority in consultation with the relevant statutory nature conservation body.

3

The ecological management plan(s) must include an implementation timetable and must be carried out as approved.

This XML file does not appear to have any style information associated with it. The document tree is shown below.
<akomaNtoso xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xsi:schemaLocation="http://docs.oasis-open.org/legaldocml/ns/akn/3.0 http://docs.oasis-open.org/legaldocml/akn-core/v1.0/cos01/part2-specs/schemas/akomantoso30.xsd">
<portion includedIn="http://www.legislation.gov.uk/id/uksi/2022/433/schedule/1">
<meta>
<identification source="#source">
<FRBRWork>
<FRBRthis value="http://www.legislation.gov.uk/id/uksi/2022/433/schedule/1"/>
<FRBRuri value="http://www.legislation.gov.uk/id/uksi/2022/433/schedule/1"/>
<FRBRdate date="2022-03-31" name="made"/>
<FRBRauthor href="http://www.legislation.gov.uk/id/government/uk"/>
<FRBRcountry value="GB-UKM"/>
<FRBRsubtype value="order"/>
<FRBRnumber value="433"/>
<FRBRname value="S.I. 2022/433"/>
<FRBRprescriptive value="true"/>
</FRBRWork>
<FRBRExpression>
<FRBRthis value="http://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/21"/>
<FRBRuri value="http://www.legislation.gov.uk/uksi/2022/433/schedule/1"/>
<FRBRdate date="2022-12-22" name="validFrom"/>
<FRBRauthor href="#source"/>
<FRBRlanguage language="eng"/>
</FRBRExpression>
<FRBRManifestation>
<FRBRthis value="http://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/21/data.akn"/>
<FRBRuri value="http://www.legislation.gov.uk/uksi/2022/433/schedule/1/data.akn"/>
<FRBRdate date="2024-11-06Z" name="transform"/>
<FRBRauthor href="http://www.legislation.gov.uk"/>
<FRBRformat value="application/akn+xml"/>
</FRBRManifestation>
</identification>
<classification source="#source">
<keyword value="infrastructure planning" showAs="INFRASTRUCTURE PLANNING" dictionary="http://www.legislation.gov.uk"/>
</classification>
<lifecycle source="#source">
<eventRef date="2022-03-31" type="generation" eId="made-date" source="#source"/>
<eventRef date="2022-04-22" eId="coming-into-force-date-1" source="#source"/>
<eventRef date="2022-04-22" type="amendment" source="#source"/>
<eventRef date="2022-12-22" type="amendment" source="#source"/>
<eventRef date="2022-12-22" eId="effective-date-1" source="#source"/>
</lifecycle>
<analysis source="#source">
<restrictions source="#source">
<restriction refersTo="#e+w+s" type="jurisdiction"/>
<restriction href="#d4e70" refersTo="#e+w+s" type="jurisdiction"/>
<restriction href="#schedule-1-paragraph-21" refersTo="#e+w+s" type="jurisdiction"/>
<restriction href="#schedule-1" refersTo="#e+w+s" type="jurisdiction"/>
<restriction href="#schedule-1-part-3" refersTo="#e+w+s" type="jurisdiction"/>
</restrictions>
</analysis>
<temporalData source="#source">
<temporalGroup eId="period1">
<timeInterval start="#effective-date-1" refersTo="#period-concept1"/>
</temporalGroup>
</temporalData>
<references source="#source">
<TLCOrganization eId="source" href="http://www.legislation.gov.uk/id/publisher/StatuteLawDatabase" showAs="Statute Law Database"/>
<TLCLocation eId="e+w+s" href="/ontology/jurisdictions/uk.EnglandWalesScotland" showAs="England, Wales, Scotland"/>
<TLCConcept eId="period-concept1" href="/ontology/time/2022.12.22" showAs="since 2022-12-22"/>
</references>
<notes source="#source">
<note class="commentary I" eId="key-061cbe72c10c1794521d479fb075510f">
<p>
Sch. 1 Pt. 3 para. 21 in force at 22.4.2022, see
<ref href="http://www.legislation.gov.uk/id/uksi/2022/433/article/1/2">art. 1(2)</ref>
</p>
</note>
<note class="commentary F" eId="key-ba11b9e26627dbe4b0007682dfc0c399">
<p>
Words in
<ref href="http://www.legislation.gov.uk/id/uksi/2022/433/schedule/1/part/3/paragraph/21/1/e">Sch. 1 Pt. 3 para. 21(1)(e)</ref>
omitted (22.12.2022) by virtue of
<ref href="http://www.legislation.gov.uk/id/uksi/2022/1399">The East Anglia TWO Offshore Wind Farm (Correction) Order 2022 (S.I. 2022/1399)</ref>
,
<ref href="http://www.legislation.gov.uk/id/uksi/2022/1399/article/1/2">art. 1(2)</ref>
,
<ref href="http://www.legislation.gov.uk/id/uksi/2022/1399/schedule">Sch.</ref>
</p>
</note>
</notes>
<proprietary xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:ukm="http://www.legislation.gov.uk/namespaces/metadata" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:dct="http://purl.org/dc/terms/" xmlns:atom="http://www.w3.org/2005/Atom" source="#source">
<ukl:RestrictStartDate value="2022-12-22"/>
<dc:identifier>http://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/21</dc:identifier>
<dc:title>The East Anglia TWO Offshore Wind Farm Order 2022</dc:title>
<dc:language>en</dc:language>
<dc:subject scheme="SIheading">INFRASTRUCTURE PLANNING</dc:subject>
<dc:publisher>Statute Law Database</dc:publisher>
<dc:modified>2024-05-20</dc:modified>
<dc:contributor>Expert Participation</dc:contributor>
<dct:valid>2022-12-22</dct:valid>
<dc:description>This Order grants development consent for, and authorises East Anglia TWO Limited to construct, operate and maintain a generating station located in the North Sea approximately 37.3km from the port of Lowestoft and 32.6km from Southwold together with all necessary and associated development. For the purposes of the development that it authorises East Anglia TWO Limited is authorised by the Order compulsorily or by agreement to purchase land and rights in land to use land, as well as to override easements and other rights. The Order also provides a defence in proceedings in respect of statutory nuisance and to discharge water. The Order imposes requirements in connection with the development for which it grants development consent.</dc:description>
<atom:link rel="self" href="http://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/21/data.xml" type="application/xml"/>
<atom:link rel="http://www.legislation.gov.uk/def/navigation/resources" href="http://www.legislation.gov.uk/uksi/2022/433/resources" title="More Resources"/>
<atom:link rel="http://www.legislation.gov.uk/def/navigation/act" href="http://www.legislation.gov.uk/uksi/2022/433" title="whole act"/>
<atom:link rel="http://www.legislation.gov.uk/def/navigation/introduction" href="http://www.legislation.gov.uk/uksi/2022/433/introduction" title="introduction"/>
<atom:link rel="http://www.legislation.gov.uk/def/navigation/signature" href="http://www.legislation.gov.uk/uksi/2022/433/signature" title="signature"/>
<atom:link rel="http://www.legislation.gov.uk/def/navigation/note" href="http://www.legislation.gov.uk/uksi/2022/433/note" title="note"/>
<atom:link rel="http://www.legislation.gov.uk/def/navigation/body" href="http://www.legislation.gov.uk/uksi/2022/433/body" title="body"/>
<atom:link rel="http://www.legislation.gov.uk/def/navigation/schedules" href="http://www.legislation.gov.uk/uksi/2022/433/schedules" title="schedules"/>
<atom:link rel="alternate" type="application/rdf+xml" href="http://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/21/data.rdf" title="RDF/XML"/>
<atom:link rel="alternate" type="application/akn+xml" href="http://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/21/data.akn" title="AKN"/>
<atom:link rel="alternate" type="application/xhtml+xml" href="http://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/21/data.xht" title="HTML snippet"/>
<atom:link rel="alternate" type="text/html" href="http://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/21/data.htm" title="Website (XHTML) Default View"/>
<atom:link rel="alternate" type="text/csv" href="http://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/21/data.csv" title="CSV"/>
<atom:link rel="alternate" type="application/pdf" href="http://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/21/data.pdf" title="PDF"/>
<atom:link rel="alternate" type="application/akn+xhtml" href="http://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/21/data.html" title="HTML5 snippet"/>
<atom:link rel="http://purl.org/dc/terms/tableOfContents" hreflang="en" href="http://www.legislation.gov.uk/uksi/2022/433/contents" title="Table of Contents"/>
<atom:link rel="http://purl.org/dc/terms/replaces" href="http://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/21/2022-04-22" title="2022-04-22"/>
<atom:link rel="http://purl.org/dc/terms/hasVersion" href="http://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/21/made" title="made"/>
<atom:link rel="http://purl.org/dc/terms/hasVersion" href="http://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/21/2022-04-22" title="2022-04-22"/>
<atom:link rel="http://purl.org/dc/terms/hasVersion" href="http://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/21/2022-12-22" title="2022-12-22"/>
<atom:link rel="up" href="http://www.legislation.gov.uk/uksi/2022/433/schedule/1" title="Schedule 1"/>
<atom:link rel="prev" href="http://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/20" title="Paragraph; Schedule 1 Paragraph 20"/>
<atom:link rel="prevInForce" href="http://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/20" title="Paragraph; Schedule 1 Paragraph 20"/>
<atom:link rel="next" href="http://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/22" title="Paragraph; Schedule 1 Paragraph 22"/>
<atom:link rel="nextInForce" href="http://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/22" title="Paragraph; Schedule 1 Paragraph 22"/>
<ukm:SecondaryMetadata>
<ukm:DocumentClassification>
<ukm:DocumentCategory Value="secondary"/>
<ukm:DocumentMainType Value="UnitedKingdomStatutoryInstrument"/>
<ukm:DocumentStatus Value="revised"/>
<ukm:DocumentMinorType Value="order"/>
</ukm:DocumentClassification>
<ukm:Year Value="2022"/>
<ukm:Number Value="433"/>
<ukm:Made Date="2022-03-31"/>
<ukm:ComingIntoForce>
<ukm:DateTime Date="2022-04-22"/>
</ukm:ComingIntoForce>
<ukm:ISBN Value="9780348234404"/>
</ukm:SecondaryMetadata>
<ukm:Alternatives>
<ukm:Alternative URI="http://www.legislation.gov.uk/uksi/2022/433/pdfs/uksi_20220433_en.pdf" Date="2022-04-07" Size="994382"/>
</ukm:Alternatives>
<ukm:Statistics>
<ukm:TotalParagraphs Value="318"/>
<ukm:BodyParagraphs Value="45"/>
<ukm:ScheduleParagraphs Value="273"/>
<ukm:AttachmentParagraphs Value="0"/>
<ukm:TotalImages Value="0"/>
</ukm:Statistics>
</proprietary>
</meta>
<portionBody>
<hcontainer name="schedules" eId="d4e70" period="#period1">
<hcontainer name="schedule" eId="schedule-1" period="#period1">
<num>SCHEDULE 1</num>
<heading>Authorised project</heading>
<part eId="schedule-1-part-3" period="#period1">
<num>PART 3</num>
<heading>Requirements</heading>
<paragraph eId="schedule-1-paragraph-21" period="#period1">
<num>
<noteRef href="#key-061cbe72c10c1794521d479fb075510f" marker="I1" class="commentary I"/>
21
</num>
<heading>Ecological management plan</heading>
<subparagraph eId="schedule-1-paragraph-21-1">
<num>1</num>
<intro>
<p>No stage of the onshore works may commence until for that stage a written ecological management plan (which accords with the outline landscape and ecological management strategy) reflecting pre-construction survey results, and the ecological mitigation measures included in the environmental statement and including—</p>
</intro>
<paragraph eId="schedule-1-paragraph-21-1-a">
<num>a</num>
<content>
<p>a breeding bird protection plan;</p>
</content>
</paragraph>
<paragraph eId="schedule-1-paragraph-21-1-b">
<num>b</num>
<content>
<p>an arboricultural method statement;</p>
</content>
</paragraph>
<paragraph eId="schedule-1-paragraph-21-1-c">
<num>c</num>
<content>
<p>an invasive species method statement;</p>
</content>
</paragraph>
<paragraph eId="schedule-1-paragraph-21-1-d">
<num>d</num>
<content>
<p>where appropriate, a special protection area crossing method statement (which accords with the outline SPA crossing method statement); and</p>
</content>
</paragraph>
<paragraph eId="schedule-1-paragraph-21-1-e">
<num>e</num>
<content>
<p>
a precautionary method
<noteRef href="#key-ba11b9e26627dbe4b0007682dfc0c399" marker="F1" class="commentary F"/>
... of working for reptiles;
</p>
</content>
</paragraph>
</subparagraph>
<hcontainer name="wrapper">
<content>
<p>has been submitted to and approved by the relevant planning authority in consultation with the relevant statutory nature conservation body.</p>
</content>
</hcontainer>
<subparagraph eId="schedule-1-paragraph-21-2">
<num>2</num>
<content>
<p>Onshore preparation works may not be carried out until a written ecological management plan (which accords with the outline landscape and ecological management strategy) for those works reflecting survey results and the ecological mitigation measures included in the environmental statement has been submitted to and approved by the relevant planning authority in consultation with the relevant statutory nature conservation body.</p>
</content>
</subparagraph>
<subparagraph eId="schedule-1-paragraph-21-3">
<num>3</num>
<content>
<p>The ecological management plan(s) must include an implementation timetable and must be carried out as approved.</p>