PART 1PRELIMINARY
Interpretation2.
(1)
In this Order—
“address” includes any number or address for the purposes of electronic transmission;
“apparatus” has the same meaning as in Part 3 of the 1991 Act;
“authorised development” means the development described in Schedule 1 (authorised development) or any part of it, which is development within the meaning of section 32 (meaning of development) of the 2008 Act;
“the book of reference” means the book of reference referred to in Schedule 10 (documents to be certified) and certified by the Secretary of State as the book of reference for the purposes of this Order;
“British Telecommunications Plc” means the company registered in England and Wales, company number 01800000, whose registered address is 81 Newgate Street, London EC1A 7AJ;
“building” includes any structure or erection or any part of a building, structure or erection;
“Cadent Gas Ltd” means the company registered in England and Wales, company number 10080864, whose registered address is Ashbrook Court, Prologis Park, Central Boulevard, Coventry CV7 8PE;
“carriageway” has the same meaning as in section 329(1) (further provision as to interpretation) of the 1980 Act and includes part of a carriageway;
“classification of roads plans” means the plans of that description referred to in Schedule 10 (documents to be certified) certified by the Secretary of State as the classification of road plans for the purposes of this Order;
“commence” means beginning to carry out any material operation (as defined in section 56(4) of the 1990 Act) forming part of the authorised development other than operations consisting of archaeological investigations and mitigation works, ecological surveys and mitigation works, investigations for the purpose of assessing and monitoring ground conditions and levels, remedial work in respect of any contamination or other adverse ground conditions, erection of any temporary means of enclosure, receipt and erection of construction plant and equipment, diversion and laying of underground apparatus and site clearance, and the temporary display of site notices or advertisements, and “commencement” is to be construed accordingly;
“electronic transmission” means a communication transmitted—
(a)
by means of an electronic communications network; or
(b)
by other means but while in electronic form,
“the engineering drawings and sections” means the drawings and sections referred to in Schedule 10 (documents to be certified) and certified as the engineering drawings and sections by the Secretary of State for the purposes of this Order;
“environmental statement” means the document of that description submitted with the application for this Order, referred to in Schedule 10 (documents to be certified) and certified as the environmental statement by the Secretary of State for the purposes of this Order;
“footway” and “footpath” have the same meaning as in section 329(1) of the 1980 Act and include part of a footway or footpath;
“highway”, “highway authority” and “local highway authority” have the same meaning as in the 1980 Act and “highway” includes part of a highway;
“the land plans” means the plans referred to in Schedule 10 (documents to be certified) and certified as the land plans by the Secretary of State for the purposes of this Order;
“limits of deviation” means the limits of deviation referred to in article 6 (limits of deviation);
“maintain” in relation to the authorised development includes, to the extent assessed in the environmental statement, to inspect, repair, adjust, alter, remove or reconstruct and any derivative of “maintain” is to be construed accordingly;
“Order land” means the land shown on the land plans which is within the limits of land to be acquired or used permanently or temporarily, and described in the book of reference;
“the Order limits” means the limits of land to be acquired or used permanently or temporarily shown on the land plans and works plans within which the authorised development may be carried out;
“relevant planning authority” means in any given provision of this Order, the planning authority for the area to which the provision relates;
“Severn Trent Water Ltd” means the company registered in England and Wales, company number 02366686, whose registered office address is Severn Trent Centre, 2 St John’s Street, Coventry, CV1 2LZ;
“South Staffordshire Plc” means the company registered in England and Wales, company number 04295398, whose registered office address is Green Lane, Walsall, West Midlands, WS2 7PD;
“statutory undertaker” means any statutory undertaker for the purposes of section 127(8) (statutory undertakers’ land), of the 2008 Act;
“street authority”, in relation to a street, has the same meaning as in Part 3 (street works in England and Wales) of the 1991 Act;
“streets, rights of way and access plans” means the plans referred to in Schedule 10 (documents to be certified) and certified as the streets, rights of way and access plans by the Secretary of State for the purposes of this Order;
“tree preservation order/impact removal plans” means the drawings referred to in Schedule 10 (documents to be certified) and certified as the tree preservation order/impact removal plans by the Secretary of State for the purposes of this Order;
“trunk road” means a highway which is a trunk road by virtue of—
(a)
(b)
an order or direction under section 10 of that Act;
(c)
an order granting development consent; or
(d)
any other enactment;
“undertaker” means National Highways Limited (company number 09346363) whose registered address is Bridge House, 1 Walnut Tree Close, Guildford, Surrey, GU1 4LZ;
“watercourse” includes all rivers, streams, ditches, drains, canals, cuts, culverts, dykes, sluices, sewers and passages through which water flows except a public sewer or drain;
“Western Power Distribution Plc” means the company registered in England and Wales, company number 09223384 whose registered address is Avonbank, Feeder Road, Bristol, Avon, BS2 0TB; and
“the works plans” means the plans referred to in Schedule 10 (documents to be certified) and certified as the works plans by the Secretary of State for the purposes of this Order.
(2)
References in this Order to rights over land include references to rights to do, or to place and maintain, anything in, on or under land or in the airspace above its surface and references in this Order to the imposition of restrictive covenants are references to the creation of rights over land which interfere with the interests or rights of another and are for the benefit of land which is acquired under this Order or is otherwise comprised in the Order land.
(3)
All distances, directions and lengths referred to in this Order are approximate and distances between points on a work comprised in the authorised development are taken to be measured along that work.
(4)
For the purposes of this Order, all areas described in square metres in the book of reference are approximate.
(5)
References in this Order to points identified by letters or numbers are to be construed as references to points so lettered or numbered on the streets, rights of way and access plans or the classification of road plans.
(6)
References in this Order to numbered works are references to works as numbered in Schedule 1 (authorised development).