Search Legislation

The Boiler Upgrade Scheme (England and Wales) Regulations 2022

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: PART 1

 Help about opening options

Changes to legislation:

There are currently no known outstanding effects for the The Boiler Upgrade Scheme (England and Wales) Regulations 2022, PART 1. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

PART 1E+WIntroductory provisions

Citation, commencement and extentE+W

1.—(1) These Regulations may be cited as the Boiler Upgrade Scheme (England and Wales) Regulations 2022 and come into force on the day after the day on which they are made.

(2) These Regulations extend to England and Wales only.

Commencement Information

I1Reg. 1 in force at 23.5.2022, see reg. 1(1)

InterpretationE+W

2.—(1) In these Regulations—

air source heat pump” means a plant(1) which generates heat using a thermodynamic cycle by transferring energy stored in the form of heat in the ambient air outside a property and uses that energy to heat a liquid;

[F1boiler upgrade grant” means the grant, the value of which has been published under regulation 13(1), (4) or (5) which is payable by the Authority to an installer under these Regulations;]

boiler upgrade voucher” has the meaning given in regulation 15(1);

biomass boiler” means a plant which—

(a)

is designed and installed to burn solid biomass(2) to provide heat,

(b)

is designed to minimise direct heat loss to the immediate area in which it is installed,

(c)

is not capable of providing heat to a property without using a liquid to deliver that heat, and

(d)

is not designed to generate heat for the purpose of cooking food [F2where that function is not able to be controlled independently of the heating or hot water];

building” means a roofed construction having walls, for which energy is used to condition the indoor climate, and reference to a building includes reference to a building unit in that building;

building unit” means a section, floor or apartment within a building which is designed or altered to be used separately;

commencement date” means the day on which these Regulations come into force;

commissioned”, in relation to a plant, means the completion of such procedures and tests as constitute, at the time they are undertaken, the usual industry standards and practices for that type of plant which demonstrate that it is capable of operating and generating heat;

connected person”, in relation to an installer, means any person connected to them within the meaning of section 1122 of the Corporation Tax Act 2010(3);

consumer code” means a code of practice [F3for the purpose of consumer protection approved by the Secretary of State under regulation 4(1)(j);]

eligible plant” has the meaning given in regulation 8;

eligible property” has the meaning given in regulation 5;

energy performance certificate” has the meaning given in regulation 2(1) of the EPB Regulations;

the EPB Regulations” means the Energy Performance of Buildings (England and Wales) Regulations 2012(4);

financial year” means—

(a)

the period beginning with the commencement date and ending with 31st March 2023, or

(b)

any subsequent 12 month period beginning with 1st April and ending with the following 31st March;

grant application” has the meaning given in regulation 14(1);

grant change notice” has the meaning given in regulation 13(4);

[F4grant from public funds” means a grant made by a public authority or by any person distributing funds on behalf of a public authority;]

ground source heat pump” means a plant which generates heat using a thermodynamic cycle by transferring energy stored in the form of heat from the ground, including water in the ground or surface water or both, and uses that energy to heat a liquid;

[F4heat network” means a network that, by distributing a liquid or a gas, enables the transfer of thermal energy for the purpose of supplying heating, cooling or hot water to two or more properties (and includes any appliance the main purpose of which is to heat or cool the liquid or gas);]

heat pump” means a plant which is an air source heat pump or a ground source heat pump [F5or both];

installer” means a person who is certified by the Microgeneration Certification Scheme(5) or a scheme—

(a)

which is equivalent to the Microgeneration Certification Scheme, and

(b)

under which installers are certified to standards equivalent to the Microgeneration Certification Scheme’s standards by a certification body or organisation accredited by UKAS to the standard approved by the Secretary of State under regulation 4(1)(a);

installer obligation” means an obligation specified in regulation 17;

mains gas” means a supply of the kind mentioned in section 5(1)(b) of the Gas Act 1986(6);

[F4new-build property” means an eligible property that meets the requirements set out in regulation 7;]

NOx” means oxides of nitrogen;

[F4off-gas grid property” means a property that is not attached to a heat network and—

(a)

is not fuelled by mains gas,

(b)

there is no record of a gas meter point at the property, and

(c)

is not a new-build property;]

original heating system” has the meaning given in regulation 5(1)(c)(ii);

PM” means particulate matter;

“properly made”—

(a)

in the case of a grant application, means an application which provides the information required by regulation 14(3), and in relation to which any information specified in a notice issued in accordance with regulation 14(4) or (5) has been received by the Authority,

(b)

in relation to a redemption application, means an application which provides the information required by regulation 16(3), and in relation to which any information required by a notice issued in accordance with regulation 16(4) has been received by the Authority;

quarter” means a period of three months beginning with 1st January, 1st April, 1st July, or 1st October;

recommendation report” has the meaning given in regulation 4(1) of the EPB Regulations;

redemption application” has the meaning given in regulation 16(1);

related property”, in relation to an eligible property, F6... means any building or swimming pool which is used by, or available for the use of, an owner or occupier of that property and where the building, building unit or swimming pool is not covered by the valid energy performance certificate for that property;

relevant installation standard” has the meaning given in paragraph 2 of Schedule 4;

relevant financial year” means a financial year beginning with—

(a)

the commencement date,

(b)

[F71st April 2023,

(c)

1st April 2024,

(d)

1st April 2025,

(e)

1st April 2026, or

(f)

1st April 2027;]

the Scheme” has the meaning given in regulation 3;

UKAS” means the United Kingdom Accreditation Service, a company limited by guarantee and incorporated in England and Wales under number 3076190;

urban area” means an area classified as urban in the “2011 rural-urban classification of output areas” published by the Office for National Statistics in August 2013(7).

(2) For the purposes of these Regulations, an energy performance certificate for a property is “valid” if—

(a)it was entered on the register required to be maintained under regulation 27(1) of the EPB Regulations no more than 10 years before the date on which it is relied on for the purposes of a grant application in relation to that property, and

(b)no other energy performance certificate for the property has since been entered on the register.

(3) Where there is more than one owner of a property, then any reference in these Regulations to the owner of the property includes any person who is an owner of the property.

(4) For the purposes of these Regulations, a scheme is equivalent to the Microgeneration Certification Scheme if it is approved as equivalent by the Secretary of State.

(5) For the purposes of these Regulations, a property does not cease to be “fuelled by mains gas” if the supply meter point in relation to the property is capped or clamped, where “supply meter point” has the meaning given in the Uniform Network Code (as defined in section 36C(7) of the Gas Act 1986)(8).

The Boiler Upgrade SchemeE+W

3.  A scheme to be known as the Boiler Upgrade Scheme, which is a scheme to facilitate and encourage the use of heat pumps and biomass boilers in the space and water heating of certain properties (“the Scheme”), is established by these Regulations.

Commencement Information

I3Reg. 3 in force at 23.5.2022, see reg. 1(1)

Approval of standards or schemes by the Secretary of StateE+W

4.—(1) The Secretary of State must approve—

(a)a standard for the purposes of—

(i)the definition of “installer” in regulation 2(1), and

(ii)paragraph 1(b)(i) of Schedule 4,

(b)one or more standards for heat pumps for the purposes of regulation 9(1)(c),

(c)a standard for the purposes of regulation 9(1)(d),

(d)one or more standards for biomass boilers for the purposes of regulation 10(1)(c),

(e)a standard for the purposes of paragraph 1 of Schedule 1,

(f)a standard for the purposes of paragraph 2 of Schedule 1,

(g)a standard in relation to NOx emissions and a standard in relation to PM emissions for the purposes of paragraph 3(a) of Schedule 1,

(h)one or more installation standards for—

(i)biomass boilers, and

(ii)heat pumps,

for the purposes of paragraph 2(a) of Schedule 4, F8...

(i)a scheme deemed to be equivalent to the Microgeneration Certification Scheme by the Secretary of State [F9, and]

[F10(j)one or more codes of practice for consumer protection for the purpose of the definition of “consumer code” in regulation 2(1)].

(2) The Secretary of State may withdraw the approval of any standard or scheme under paragraph (1).

(3) The Secretary of State must—

(a)publish the details of the standards or schemes first approved under paragraph (1) before the end of the commencement date to have effect from that date,

(b)publish the details of any subsequent standard or scheme which is approved under paragraph (1), and the date from which it is approved, and

(c)where the approval of a standard or scheme is withdrawn under paragraph (2), publish that fact together with the date on which it ceased to be approved.

(1)

And see section 100(3) of the 2008 Act for the definition of “plant”.

(2)

And see section 100(3) of the 2008 Act for the definition of “biomass”.

(5)

Details of the scheme are available at www.mscertified.com.

(6)

1986 c. 44. Section 5 was substituted by section 3 of the Gas Act 1995, and sub-section (1)(b) was amended by S.I. 2012/2400.

(7)

ISBN 978 0 580 78472 9. This international standard was published by the British Standards Institution on 31st October 2012; which defines an urban area as one with a population of 10,000 people or more.

(8)

Section 36C(7) was inserted by section 81(1) of the Energy Act 2011 (c. 16). See paragraph A4.1.1 of the Transportation Principal Document of the Uniform Network Code, issued on 24th July 2020, for the definition of “supply meter point”. Copies of that document are available at www.gasgovernance.co.uk/TPD. Hard copies are not available.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Impact Assessments

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources