I19SCHEDULE 1SCHEDULED WORKS

Article 2

Annotations:
Commencement Information
I19

Sch. 1 in force at 30.6.2022, see art. 1

In the County of Hertfordshire, District of East Hertfordshire

Parish of Sawbridgeworth

Work No. 1 — A footbridge, commencing at a point 15 metres south-west of the centre of Tednambury level crossing and terminating at a point 8 metres north-east of its commencement.

Parish of Thorley

Work No. 2 — A footbridge, commencing at a point 105 metres north-east of the centre of Fowlers Lane level crossing and terminating at a point 8 metres north-east of its commencement.

County of Essex, District of Uttlesford

Parish of Ugley

Work No. 3 — A footbridge, commencing at a point 360 metres south-west of the centre of Henham level crossing and terminating at a point 6 metres east of its commencement.

SCHEDULE 2CLOSURE OF LEVEL CROSSINGS

Articles 5, 13, 14 and 15

I20PART 1CLOSURE OF LEVEL CROSSINGS SUBJECT TO OPENING OF NEW HIGHWAY

Annotations:
Commencement Information
I20

Sch. 2 Pt. 1 in force at 30.6.2022, see art. 1

(1)

Area

(2)

Extent of level crossing to be stopped up and discontinued

(3)

Extent of highway to be extinguished

(4)

Status and extent of new highway

County of Hertfordshire

Borough of Broxbourne

Cadmore Lane between points P001 and P002

Cadmore Lane between points P001, P002 and P007

Footpath between points P003, P004, P005, P006 and P007

Cycle track between points P003A, P003B, P004, P005, P005A, P006 and P007

County of Essex

District of Harlow

Camps between points P023 and P024

Footpath EX“185”75 (Harlow) between points P021, P022, P023, P024, P025 and P026

Footpath between points P014, P015, P016, P017, P018, P019 and P020

Path not on definitive map between points P021, P028 and P023

Path not on definitive map between points P025 and P027

Parndon Mill between points P030 and P031

Footpath EX“185”73 (Harlow) between points P029, P030, P031 and P032

Footpath between points P029 and P034

Path not on definitive map between points P029, P033 and P030

County of Hertfordshire

District of East Hertfordshire

Parish of Sawbridgeworth

Tednambury between points P037 and P038

Footpath 003(Sawbridgeworth) between points P037, P038, P039, P039B and P040

Footpath between points P037, P042, P043, P044, P045, P046, P047, P039, P039A, and P040

Path not on definitive map between points P037, P041, P039, P039A and P039B

County of Hertfordshire

District of East Hertfordshire

Parish of Thorley

Gilston between points P059 and P060

Footpath 007 (Thorley) between points P058, P059, P060 and P060A

Footpath between points P060A, P053, P052 and P055

Path not on definitive map between points P058, P061, P062 and P062A

Parish of Bishop’s Stortford

Johnsons between points P064 and P065

Footpath 060 (Bishop’s Stortford) between points P063, P064, P065, P066 and P067

Footpath between points P063, P068, P069, P070, P071, P066 and P072, between points P069 and P068A and between points P070 and P069A

Parishes of Henham, Elsenham and Ugley

Elsenham Emergency Hut between points P084A and P084

Footpath EX“25”32 (Henham) between points P083, P084A, P084 and P085

Footpath between points P083, P088, P089, P090 and P091

Footpath EX“51”24 (Ugley) between points P091 and P092

Footpath EX“25”7 (Henham) between points P092, P093 and P094 and between points P095 and P096

Parishes of Ugley, Henham and Widdington

Henham between points P099 and P100

Footpath EX“55”26 (Widdington) between points P106, P099, P100, P101 and P102

Footpath between points P102 and P103 and between points P104, P104A and P105

Parish of Newport

Elephant between points P110 and P111

Footpath EX“41”14 (Newport) between points P109, P110, P111 and P112

Footpath between points P113, P114, P115 and P112

Parishes of Newport and Wendens Ambo

Windmills between points P127 and P128

Footpath EX“41”8 (Newport) between points P126, P127 and P128

Footpath between points P128, P130, P131 and P132

City of Chelmsford

Parish of Margaretting

Maldon Road between points P152 and P152A

Footpath EX“226”21 (Margaretting) between points P150, P151, P152, P152A, P153 and P154

Bridleway between points P155 and P156

Parish of Boreham

Noakes between points P163 and P164

Footpath EX/213/24 (Boreham) between points F1P163 and P164

Bridleway between points P160, P161 and P162

Path not on definitive map between points F2P163, P167 and P165

District of Braintree

Parish of Cressing

Cranes No. 1 between points P170 and P171

Footpath EX“74”14 (Cressing) between points P169 and P170 and between points P171 and P172

Footpath between points P169, P173, P174 and P172

Path not on definitive map between points P175, P170, P171 and P178

Parish of Kelvedon

Snivellers between points P201 and P202

Bridleway EX“92”34 (Kelvedon) between points P200, P201, P202 and P203

Bridleway between points P203, P204 and P205

Parish of Feering

Hill House 1 between points P206A and P207

Footpath EX“78”7 (Feering) between points P206, P206A, P207, P208 and P209

Footpath between points P206 and P210

Path not on definitive map between points P207 and P208

Great Domsey between points P213 and P214

Footpath EX“78”3 (Feering) between points P212, P213, P214, P215

Footpath between points P212, P216, P217 and P218

Path not on definitive map between points P213, P220 and P221

Borough of Colchester

Parish of Marks Tey

Long Green between points P223 and P224

Path not on the definitive map between points P223 and P224

Footpath between points P222, P222A, P222B, P225A, P225B and P225, between points P222B and P223A and between points P225A and P225

Dobbies Lane between points P222 and P223 and between points P224 and P225

Parishes of Eight Ash Green, Stanway and Copford

Church 2 between points P232 and P229

Footpath EX“149”29 (Stanway) between points P228, P229, P230 and P232

Footpath between points P228 and P231

Footpath EX“132”11 (Eight Ash Green) between points P232, P233, P234 and P235

District of Tendring

Parish of Ardleigh

Abbotts between points P267 and P268

Footpath 27 (Ardleigh) between points P265, P266, P267 and P268

Footpath between points P265, P269, P270, P266, P271 and P272

Footpath 42 (Ardleigh) between points P268 and P273

Footpath 28 (Ardleigh) between points P268 and P274

Footpath between points P273, P274 and P275

Parish of Wrabness

Wheatsheaf between points P279 and P280

Footpath EX“184”19 (Wrabness) between points P276, P277, P278, P279, and P280

Footpath between points P276, P284 and P285

Path not on the definitive map between points P278, P287, P287A and P282

District of Tendring

Parish of Great Bentley

Great Bentley Station between points P314 and P316 and Lords No. 1 between points P322 and P323

Footpath EX“165”8 (Great Bentley) between points P312, P313, P314, P315, P316 and P317

Footpath between points P317, P318 and P319

Path not on definitive map between points P313, P320 and P316

Footpath EX“165”12(Great Bentley) between points P321, P322, P323, P324 and P325

Parish of Frinton and Walton

Bluehouse between points P327 and P328

Footpath EX“164”16 (Frinton and Walton) between points P326, P327, P328, P329, P330 and P331

Footpath between points P326 and P332

Thurrock

No. 131 between points P335 and P336

Footpath 145 (Thurrock) between points P334, P335, P336 and P337 and between points P338 and P341

Footpath between points P339, P340 and P341

Path not on definitive map between points P334, P342 and P335 and between points P336, P343 and P337

London Borough of Havering and

County of Essex

Borough of Brentwood

Whipps Farmers between points P378 and P379

Footpath EX“272|178 (Havering) and Footpath EX|272”178 (Brentwood) between points P375, P376, P377, P377A and between points P378, P379 and P380

Path not on definitive map between points P377A and P378

Footpath between points P380 and P381A and between points P381, P382 and P383

Thurrock

Howells Farm between points P407 and P408

Footpath 23 (Thurrock) between points P406, P407, P408 and P409

Footpath between points P406, P413 and P414

County of Essex

Borough of Castle Point

Ferry between points P427 and P428 and Brickyard Farm between points P430 and P431

Footpath EX“BENF”22 (Castle Point) between points P426, P427, P428 and P424

Footpath between points P425, P424 and P431

Footpath EX“BENF”12 (Castle Point) between points P429, P430 and P431

I21PART 2CLOSURE OF LEVEL CROSSINGS NOT SUBJECT TO OPENING OF NEW HIGHWAY

Annotations:
Commencement Information
I21

Sch. 2 Pt. 2 in force at 30.6.2022, see art. 1

(1)

Area

(2)

Extent of level crossing to be stopped up and discontinued

(3)

Extent of public right of way to be extinguished

County of Essex

District of Epping Forest

Parish of Roydon

Old Lane between points P011 and P012

Footpath EX“203”13 (Roydon) between points P010, P011, P012 and P013

City of Chelmsford

Parish of Margaretting

Parsonage Lane between points P147 and P148

Parsonage Lane between points P147 and P148 (subject to the use by vehicular traffic by persons authorised by Network Rail)

District of Braintree

Parishes of White Notley and Cressing

Cranes No. 2 between points P181 and P182

Footpath EX“120”8 (White Notley) between points P179, P181, P182 and P183

Footpath EX“74”11 (Cressing) between points P183 and P184

London Borough of Havering

Butts Lane between points P367 and P368

Footpath 170 (Havering) between points P366, P367, P368 and P370

Woodhall Crescent between points P372 and P373

Footpath 172 between points P371, P372, P373 and P374

London Borough of Havering and Thurrock

Manor Farm between points P358 and P359

Footpath 251 (Havering) between points P358 and P359

Path not on definitive map between points P358 and P369

County of Essex

District of Rochford

Parish of Hawkwell

Barbara Close between points P441 and P442

Footpath EX“285”18 (Hawkwell) between points P441, P442 and P443

I22SCHEDULE 3LAND IN WHICH PRIVATE RIGHTS OF ACCESS MAY BE ACQUIRED

Articles 5 and 20

Annotations:
Commencement Information
I22

Sch. 3 in force at 30.6.2022, see art. 1

(1)

Extent of new private right of way

(2)

Land having benefit of new right

(3)

Purpose for which new private right may be acquired

Between points P375 and P376 on sheet 57

Land cross-hatched on sheet 57

Vehicular access

I23SCHEDULE 4REDESIGNATION OF HIGHWAYS

Articles 5 and 12

Annotations:
Commencement Information
I23

Sch. 4 in force at 30.6.2022, see art. 1

(1)

Area

(2)

Highway

(3)

Current designation

(4)

Proposed designation

County of Hertfordshire

Borough of Broxbourne

Trinity Lane between points R001, R002A and R002

Public Road

Bridleway (subject to use by vehicular traffic by persons authorised by Network Rail)

City of Chelmsford

Parish of Boreham

Footpath EX“213”24 (Boreham) between points R006 and P162

Footpath

Bridleway

I24SCHEDULE 5LAND IN WHICH ONLY NEW RIGHTS ETC., MAY BE ACQUIRED

Articles 5 and 20

Annotations:
Commencement Information
I24

Sch. 5 in force at 30.6.2022, see art. 1

(1)

Area

(2)

Number of land shown on the deposited plans

(3)

Purpose for which rights may be acquired

County of Hertfordshire

District of East Hertfordshire

Parish of Sawbridgeworth

04

Access for creation of public right of way

Access for removal of Level Crossing

Access for construction of the authorised works

Parish of Thorley

01, 02, 04

Access for removal of Level Crossing

F3. . .

F4. . .

County of Essex

District of Epping

Parish of Roydon

11, 12

Access for removal of Level Crossing

District of Harlow

10, 13, 14, 16, 19, 21, 25, 28, 29, 30, 31

Access for maintenance

City of Chelmsford

Parish of Margaretting

03, 07A

Access for removal of Level Crossing

Parish of Boreham

01, 02A, 12, 12A

Access for creation of public right of way

Access for removal of Level Crossing

District of Braintree

Parish of White Notley

05

Access for removal of Level Crossing

Parish of Feering

16

Access for removal of Level Crossing

Borough of Colchester

Parish of Eight Ash Green

01, 04, 05

Access for removal of Level Crossing

Parish of Stanway

08, 09, 10

Access for removal of Level Crossing

District of Tendring

Parish of Ardleigh

01

Access for creation of public right of way

Access for removal of Level Crossing

Parish of Great Bentley

06

Access for creation of public right of way

Access for removal of Level Crossing

District of Thurrock

86

Access for maintenance

London Borough of Havering

38, 40

Access

County of Essex

Borough of Castle Point

25, 26, 27

Access for removal of crossing

28, 29, 30, 31

Access for removal of crossing and access for maintenance

District of Rochford

Parish of Hawkwell

02, 08

Access for removal of crossing

I25SCHEDULE 6LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

Articles 5 and 21

Annotations:
Commencement Information
I25

Sch. 6 in force at 30.6.2022, see art. 1

(1)

Area

(2)

Number of land shown on the land plans

(3)

Purpose for which temporary possession may be taken

County of Hertfordshire

Borough of Broxbourne

01B

Creation of public right of way

District of East Hertfordshire

Parish of Sawbridgeworth

01, 07, 08, 09, 13, 15

Worksite

02

Access for creation of public right of way

Access for removal of Level Crossing

10

Footbridge

14, 16, 18, 20, 23, 25, 26

Creation of public right of way

Access for construction of the authorised works

Parish of Thorley

03, 17, 20, 22, 23

Worksite

22A, 24A

Footbridge

08, 09, 16, 24, 25 32

Creation of public right of way

County of Essex

District of Epping

Parish of Roydon

01, 02, 03, 04, 06, 07, 08, 09, 10

Worksite

District of Harlow

01, 02, 22

Worksite

04, 05, 18, 21, 23, 24, 37, 38, 39, 40

Creation of public right of way

District of Uttlesford

Parish of Elsenham

15, 16A

Worksite

Parish of Ugley

01, 02, 03

Access for removal of Level Crossing, access for creation of public right of way

05, 07, 11, 15

Creation of public right of way

09

Access for removal of Level Crossing

12, 14

Footbridge

13, 16, 17, 18, 19, 20, 21

Worksite

10

Worksite and creation of public right of way

Parish of Henham

01

Access for removal of Level Crossing and creation of public right of way

02, 19A, 20, 26A

Worksite

07, 19

Access for removal of Level Crossing

03, 08, 09, 10, 11, 14, 15, 16, 17, 18, 25, 26, 26B

Creation of public right of way

Parish of Widdington

01A, 01B, 04, 06

Worksite

08

Worksite and creation of public right of way

Parish of Newport

01, 04, 09

Access for removal of Level Crossing

10, 11, 13, 17, 20, 21, 23, 36

Worksite

22, 28, 29, 35

Creation of public right of way and access for removal of Level Crossing

37

Access for creation of public right of way

Access for removal of level crossing

Parish of Wendens Ambo

01, 02

Access for creation of public right of way

Access for removal of Level Crossing

City of Chelmsford

Parish of Margaretting

01, 02, 07, 08, 09, 11

Worksite

06

Creation of public right of way

Parish of Boreham

15, 17

Worksite

02

Creation of public right of way

District of Braintree

Parish of Cressing

05, 09

Worksite

08

Worksite and creation of public right of way

13, 14, 14A, 15, 16

Access for creation of public right of way and access for removal of Level Crossing

06, 06A, 07, 11, 12

Creation of PROW

19

Access for removal of Level Crossing

Parish of White Notley

03

Worksite

04, 05A

Access for removal of Level Crossing

Parish of Kelvedon

01, 02, 05, 08, 09

Worksite

03

Creation of public right of way

Parish of Feering

04, 07

Worksite

01, 01A, 03, 05, 06, 09, 17, 21, 23, 24, 27

Creation of public right of way

10, 11, 15

Access for removal of Level Crossing

Borough of Colchester

Parish of Eight Ash Green

02

Worksite

Parish of Stanway

12, 13, 14, 15, 19

Creation of public right of way

Parish of Copford

07, 08, 09, 10, 11, 12, 14

Creation of public right of way

District of Tendring

Parish of Ardleigh

06, 11, 12, 17

Creation of public right of way

09, 10, 14, 19

Worksite

15, 18

Access for removal of Level Crossing

Parish of Wrabness

01, 02

Access for creation of public right of way and access for removal of Level Crossing

03

Worksite

04

Creation of public right of way and access for removal of level crossing

Parish of Great Bentley

27, 31, 32

Worksite

04, 14, 15

Creation of public right of way

13

Creation of public right of way

Access for removal of Level Crossing

11

Access for creation of public right of way

Access for removal of Level Crossing

Parish of Frinton and Walton

01

Creation of public right of way and access for removal of Level Crossing

Borough of Brentwood

01, 02, 09, 10

Creation of public right of way

03, 08, 15, 16, 18

Worksite

11, 12, 13, 19

Access for removal of Level Crossing

Borough of Castle Point

02, 09

Creation of public right of way

03, 10, 12, 13, 14, 15

Worksite

District of Rochford

Parish of Hawkwell

01

Worksite

04, 05, 06, 07

Worksite

Access for removal of Level Crossing

Thurrock

04, 06, 07, 11, 13, 16, 86

Access for removal of Level Crossing

12, 22A, 22B, 74A, 76, 77, 83, 87

Worksite

20, 22, 23, 72, 74, 75, 78, 82, 84

Creation of public right of way

London Borough of Havering

33, 34, 38, 40

Access for removal of Level Crossing

35, 36, 37

Worksite

20, 26, 30, 36A

Worksite and access for removal of level crossing

I26SCHEDULE 7STREETS SUBJECT TO ALTERATION OF LAYOUT

Article 7

Annotations:
Commencement Information
I26

Sch. 7 in force at 30.6.2022, see art. 1

(1)

Area

(2)

Street subject to alteration of layout

(3)

Description of alteration

Parish of Elsenham

Old Mead Road

Creation of footway

I27SCHEDULE 8STREETS SUBJECT TO STREET WORKS

Article 8

Annotations:
Commencement Information
I27

Sch. 8 in force at 30.6.2022, see art. 1

(1)

Area

(2)

Street subject to street works

County of Essex

District of Uttlesford

Parish of Newport

Debden Road

Parish of Elsenham

Old Mead Road

Parish of Kelvedon

Sniveller’s Lane

County of Essex

Borough of Brentwood

Warley Street

I28SCHEDULE 9STREETS TO BE TEMPORARILY STOPPED UP

Article 9

Annotations:
Commencement Information
I28

Sch. 9 in force at 30.6.2022, see art. 1

(1)

Area

(2)

Street to be stopped up

(3)

Extent of temporary stopping up

County of Hertfordshire

District of East Hertfordshire

Parish of Sawbridgeworth

Footpath 003(Sawbridgeworth)

Between points T001, P037, P038 and P039

Path not on definitive map

Between points P037, P041, P039 and P039A

Parish of Thorley

Footpath 007 (Thorley)

Between points P058, P059, P060, and P060A

Path not on definitive map

Between points P058, P061, P062 and P062A

County of Essex

District of Uttlesford

Parish of Elsenham

Old Mead Road

Within Order limits

Parishes of Ugley, Henham and Widdington

Footpath EX“55”26 (Widdington)

Between points P106, P099, P100, P101 and P102

Parish of Newport

Footpath EX“41”14 (Newport)

Between points P109, P110, P111 and P112

Debden Road

Within Order limits

Footpath EX“41”8 (Newport)

Between points P126, P127, P128 and P129

Parish of Wendens Ambo

Rookery Lane

Between points T003 and T004

City of Chelmsford

Parish of Margaretting

Footpath EX“226”21 (Margaretting)

Between points P150, P151, P152, P152A, P153 and P154

Parish of Boreham

Footpath EX/213/24 (Boreham)

Between points P163, P164, P166 and P162

Path not on definitive map

Between points P163, P167 and P165

District of Braintree

Parish of Cressing

Footpath EX“74”14 (Cressing)

Between points P169 and P170 and between points P171 and P172

Path not on definitive map

Between points P170 and P171

Parish of Kelvedon

Bridleway EX“92”34 (Kelvedon)

Between points P200, P201, P202 and P203

Sniveller’s Lane

Within Order limits

Parish of Feering

Footpath EX“78”7 (Feering)

Between points P206, P206A, P207, P208 and P209

Path not on definitive map

Between points P207 and P208

Byway Open to All Traffic BOAT EX“78”5 (Feering)

Within Order limits

Footpath EX“78”3 (Feering)

Between points P212, P213, P214 and P215

Path not on definitive map

Between points P212, P220 and P221

Borough of Colchester

Parishes of Copford and Stanway

Footpath EX“149”29 (Stanway)

Between points P228, P229, P230 and P232

Parishes of Stanway and Eight Ash Green

Footpath EX“132”11 (Eight Ash Green)

Between points P232, P233, P234 and P235

District of Tendring

Parish of Ardleigh

Footpath 27 (Ardleigh)

Between points P265, P266, P267 and P268

Footpath 28 (Ardleigh)

Between points P268 and P274

Footpath 42 (Ardleigh)

Within Order limits

Footpath EX“184”19 (Wrabness)

Between points T005, P276, P277, P278, P279 and P280

Path not on the definitive map

Between points P278, P287, P287A and P282

Parish of Great Bentley

Footpath EX“165”8 (Great Bentley)

Between points P312, P313, P314, P315, P316 and P317

Path not on definitive map

Between points P313, P320 and P316

Footpath EX“165”12(Great Bentley)

Between points P321, P322, P323, P324 and P325

Parish of Frinton and Walton

Footpath EX“164”16 (Frinton and Walton)

Within Order limits

Thurrock

Footpath 145 (Thurrock)

Between points P334, P335, P336 and P337 and between points P338 and P341

Path not on definitive map

Between points P334, P342 and P335 and between points P336, P343 and P337

Footpath 23 (Thurrock)

Between points P406, P407, P408 and P409

London Borough of Havering

Footpath 251 (Havering)

Between points P354, P358, P359 and P360

Path not on the definitive map

Between points P358, P365 and P360

Footpath EX“272”178

Within Order limits

County of Essex

Borough of Brentwood

Warley Street

Within Order limits

Footpath EX“272”178

Within Order limits

Borough of Castle Point

Footpath EX“BENF”22 (Castle Point)

Between points P426, P427, P428, P424 and T007

Footpath EX“BENF”12 (Castle Point)

Between points P429, P430 and P431

Footpath EX“BENF”31 (Castle Point)

Between points T002 and P429

District of Rochford

Parishes of Rochford and Hawkwell

Footpath EX/285/21 (Hawkwell)

Within Order limits

I29SCHEDULE 10ACCESS TO WORKS

Article 11

Annotations:
Commencement Information
I29

Sch. 10 in force at 30.6.2022, see art. 1

(1)

Area

(2)

Description of Access

County of Essex

District of Harlow

Improved access off Roydon Road

District of Tendring

Parish of Wrabness

Improved access off Wheatsheaf Lane

SCHEDULE 11APPARATUS AND RIGHTS OF STATUTORY UNDERTAKERS ETC.

Article 32

I11

1

Sections 271 to 27449 (power to extinguish rights of statutory undertakers etc. and power of statutory undertakers etc. to remove or re-site apparatus) of the 1990 Act apply in relation to any land acquired or appropriated by Network Rail under this Order subject to the following provisions of this paragraph; and all such other provisions of that Act as apply for the purposes of those provisions (including sections 275 to 278, which contain provisions consequential on the extinguishment of any rights under sections 271 and 272, and sections 279(2) to (4), 280 and 28250, which provide for the payment of compensation) have effect accordingly.

2

In the provisions of the 1990 Act, as applied by sub-paragraph (1), references to the appropriate Minister are references to the Secretary of State.

3

Where any apparatus of public utility undertakers or of a public communications provider is removed in pursuance of a notice or order given or made under section 271, 272 or 273 of the 1990 Act, as applied by sub-paragraph (1), any person who is the owner or occupier of premises to which a supply was given from that apparatus is entitled to recover from Network Rail compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of effecting a connection between the premises and any other apparatus from which a supply is given.

4

Sub-paragraph (3) does not apply in the case of the removal of a public sewer but where such a sewer is removed in pursuance of such a notice or order as is mentioned in that sub-paragraph, any person who is—

a

the owner or occupier of premises the drains of which communicated with that sewer; or

b

the owner of a private sewer which communicated with that sewer,

is entitled to recover from Network Rail compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of making the drain or sewer belonging to that person communicate with any other public sewer or with a private sewerage disposal plant.

5

The provisions of the 1990 Act mentioned in sub-paragraph (1), as applied by that sub-paragraph, do not have effect in relation to apparatus as respects which paragraph 2, or Part 3 of the 1991 Act, applies.

6

In this paragraph—

  • public communications provider” has the same meaning as in section 151(1) of the 2003 Act;

  • public utility undertakers” has the same meaning as in the 1980 Act51, and

  • apparatus” has the same meaning as in Part 3 of the 1991 Act.

Annotations:
Commencement Information
I1

Sch. 11 para. 1 in force at 30.6.2022, see art. 1

SCHEDULE 12MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASING ENACTMENTS FOR CREATION OF NEW RIGHTS

Article 20

Compensation enactments

I21

The enactments for the time being in force with respect to compensation for the compulsory purchase of land apply, with the necessary modifications as respects compensation, in the case of a compulsory acquisition under this Order of a right by the creation of a new right, as they apply as respects compensation on the compulsory purchase of land and interests in land.

Annotations:
Commencement Information
I2

Sch. 12 para. 1 in force at 30.6.2022, see art. 1

I32

1

Without limitation on the scope of paragraph 1, the 1961 Act has effect subject to the following modification set out in sub-paragraph (2).

2

For section 5A(5A) of the 1961 Act (relevant valuation date), substitute—

5A

If—

a

the acquiring authority enters on land for the purpose of exercising a right in pursuance of a notice of entry under section 11(1) of the 1965 Act (as modified by paragraph 5(5) of Schedule 12 to the Network Rail (Essex and Others Level Crossing Reduction) Order 2022 (“the 2022 Order”);

b

the acquiring authority is subsequently required by a determination under paragraph 12 of Schedule 2A to the 1965 Act (as substituted by paragraph 5(8) of Schedule 12 to the 2022 Order to acquire an interest in the land; and

c

the acquiring authority enters on and takes possession of that land,

the authority is deemed for the purposes of subsection (3)(a) to have entered on that land when it entered on that land for the purpose of exercising that right.

Annotations:
Commencement Information
I3

Sch. 12 para. 2 in force at 30.6.2022, see art. 1

I43

1

Without limitation on the scope of paragraph 1, the Land Compensation Act 197352 has effect subject to the modifications set out in sub-paragraph (2).

2

In section 44(1) (compensation for injurious affection), as it applies to compensation for injurious affection under section 7 (measure of compensation in case of severance) of the 1965 Act as substituted by paragraph 5(3)—

a

for “land is acquired or taken” substitute “a right over land is purchased”; and

b

for “acquired or taken from him” substitute “over which the right is exercisable”.

Annotations:
Commencement Information
I4

Sch. 12 para. 3 in force at 30.6.2022, see art. 1

Application of Part 1 of the 1965 Act

I54

Part 1 (compulsory purchase under Acquisition of Land Act 1946) of the 1965 Act, as applied by article 18 (application of Part 1 of the 1965 Act), applies to a compulsory acquisition of rights under article 20(1) (power to acquire new rights)—

a

with the modifications specified in paragraph 5, and

b

with such other modifications as may be necessary.

Annotations:
Commencement Information
I5

Sch. 12 para. 4 in force at 30.6.2022, see art. 1

I65

1

The modifications referred to in paragraph 4(a) are as follows.

2

References in the 1965 Act to land are, in appropriate contexts, to be read (according to the requirements of the particular context) as referring to, or as including references to—

a

the right acquired or to be acquired, or

b

the land over which the right is, or is to be, exercisable.

3

For section 7 (measure of compensation in the case of severance) of the 1965 Act substitute—

7

In assessing the compensation to be paid by the acquiring authority under this Act, regard shall be had, not only to the extent (if any) to which the value of the land over which the right is acquired is depreciated by the acquisition of the right, but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of the owner, or injuriously affecting that other land by the exercise of the powers conferred by this or the special Act.

4

The following provisions of the 1965 Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land)—

a

section 9(4) (failure of owners to convey),

b

paragraph 10(3) of Schedule 1 (owners under incapacity),

c

paragraph 2(3) of Schedule 2 (absent and untraced owners), and

d

paragraphs 2(3) and 7(2) of Schedule 4 (common land),

are modified to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be acquired compulsorily is vested absolutely in the acquiring authority.

5

Section 1153 (powers of entry) of the 1965 Act is modified so as to secure that, where the acquiring authority has served notice to treat in respect of any right as well as the notice required by subsection (1) of that section, it has power, exercisable in the same circumstances and subject to the same conditions, to enter for the purpose of exercising that right; and sections 11A54 (powers of entry: further notices of entry), 11B55 (counter-notice requiring possession to be taken on a specified date), 1256 (penalty for unauthorised entry) and 1357 (refusal to give possession to acquiring authority) of that Act are modified accordingly.

6

Section 2058 (tenants at will etc.) of the 1965 Act applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order of that land, but taking into account only the extent (if any) of such interference with such interests as is actually caused, or likely to be caused, by the exercise of the right in question.

7

Section 22 (interests omitted from purchase) of the 1965 Act (as modified by article 18(7)) is modified so as to enable the acquiring authority, in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired, subject to compliance with that section as respects compensation.

8

For Schedule 2A to the 1965 Act substitute—

SCHEDULE 2ACOUNTER-NOTICE REQUIRING PURCHASE OF LAND

Introduction

1

This Schedule applies where an acquiring authority serve a notice to treat in respect of a right over a house, building or factory.

2

In this Schedule, “house” includes any park or garden belonging to a house.

Counter-notice requiring purchase of land

3

A person who is able to sell the house, building or factory (“the owner”) may serve a counter-notice requiring the authority to purchase the owner’s interest in the house, building or factory.

4

A counter-notice under paragraph 3 must be served within the period of 28 days beginning with the day on which the notice to treat was served.

Response to counter-notice

5

On receiving a counter-notice, the authority must decide whether to—

a

withdraw the notice to treat,

b

accept the counter-notice, or

c

refer the counter-notice to the Upper Tribunal.

6

The authority must serve notice of its decision on the owner within the period of 3 months beginning with the day on which the counter-notice is served (“the decision period”).

7

If the authority decides to refer the counter-notice to the Upper Tribunal it must do so within the decision period.

8

If the authority does not serve notice of a decision within the decision period it is to be treated as if it had served notice of a decision to withdraw the notice to treat at the end of that period.

9

If the authority serves notice of a decision to accept the counter-notice, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in the house, building or factory.

Determination by Upper Tribunal

10

On a referral under paragraph 7, the Upper Tribunal must determine whether the acquisition of the right would—

a

in the case of a house, building or factory, cause material detriment to the house, building or factory, or

b

in the case of a park or garden, seriously affect the amenity or convenience of the house to which the park or garden belongs.

11

In making its determination, the Upper Tribunal must take into account—

a

the effect of the acquisition of the right,

b

the use to be made of the right proposed to be acquired, and

c

if the right is proposed to be acquired for works or other purposes extending to other land, the effect of the whole of the works and the use of the other land.

12

If the Upper Tribunal determines that the acquisition of the right would have either of the consequences described in paragraph 10, it must determine how much of the house, building or factory the authority ought to be required to take.

13

If the Upper Tribunal determines that the authority ought to be required to take some or all of the house, building or factory, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in that land.

14

1

If the Upper Tribunal determines that the authority ought to be required to take some or all of the house, building or factory, the authority may at any time within the period of 6 weeks beginning with the day on which the Upper Tribunal makes its determination withdraw the notice to treat in relation to that land.

2

If the acquiring authority withdraws the notice to treat under this paragraph they must pay the person on whom the notice was served compensation for any loss or expense caused by the giving and withdrawal of the notice.

3

Any dispute as to the compensation is to be determined by the Upper Tribunal.

Annotations:
Commencement Information
I6

Sch. 12 para. 5 in force at 30.6.2022, see art. 1

SCHEDULE 13FOR THE PROTECTION OF DRAINAGE AUTHORITIES AND THE ENVIRONMENT AGENCY

Article 35

I71

1

The following provisions of this Schedule apply for the protection of the drainage authority unless otherwise agreed in writing between Network Rail and the drainage authority.

2

In this Schedule—

  • the Agency” means the Environment Agency;

  • a category 1 specified work” means so much of any permanent or temporary work or operation authorised by this Order (which includes any dredging and any geotechnical investigations that may be undertaken) consists of—

    1. a

      erecting any structure (whether temporary or permanent) in, over or under a main river if the work is likely to affect any drainage work which is or includes a main river or the volumentric rate of flow of water in or flowing to or from any main river;

    2. b

      the carrying out of any work of alteration or repair of any structure (whether temporary or permanent) in, over or under a main river if the work is likely to affect the flow of water in the main river or to affect any drainage work;

    3. c

      erecting or altering any structure (whether temporary or permanent) designed to contain or divert the floodwaters of any part of a main river; or

    4. d

      any work or operation that is in, on, under, over or within 16 metres of a drainage work which is or includes a main river or is otherwise likely to affect any such drainage work or the volumetric rate of flow of water in or flowing to or from any drainage work;

  • a category 2 specified work” means any of the following—

    1. a

      erecting any mill dam, weir or other like obstruction to the flow of any ordinary watercourse, or raising or otherwise altering any such obstruction;

    2. b

      erecting a culvert in any ordinary watercourse;

    3. c

      altering a culvert in a manner that would be likely to affect the flow of any ordinary watercourse; or

    4. d

      altering, removing or replacing a structure or feature designated by a local drainage authority under Schedule 1 to the Flood and Water Management Act 201059;

  • construction” includes execution, placing, altering, replacing, relaying and removal and “construct” and “constructed” are construed accordingly;

  • the drainage authority” means—

    1. a

      in relation to a category 1 specified work, the Agency;

    2. b

      in relation to a category 2 specified work, the drainage board concerned within the meaning of section 23 (prohibition on obstructions etc in watercourses) of the Land Drainage Act 199160.

  • drainage work” means any watercourse and includes any land which provides or is expected to provide flood storage capacity for any watercourse and any bank, wall, embankment or other structure, or any appliance, constructed or used for land drainage, flood defence or tidal monitoring;

  • the fishery” means any waters containing fish and fish in such waters and the spawn, habitat or food of such fish;

  • “a main river” and “ordinary watercourse” have the meanings given by respectively the Water Resources Act 1991 and the Land Drainage Act 1991;

  • plans” includes sections, drawings, specifications and method statements;

  • specified work” means a category 1 specified work or a category 2 specified work.

Annotations:
Commencement Information
I7

Sch. 13 para. 1 in force at 30.6.2022, see art. 1

I82

1

Before beginning to construct any specified work, Network Rail must submit to the drainage authority plans of the specified work and such further particulars available to it as the drainage authority may within 28 days of the receipt of the plans reasonably require.

2

Any such specified work must not be constructed except in accordance with such plans as may be approved in writing by the drainage authority, or determined under paragraph 12.

3

Any approval of the drainage authority required under this paragraph—

a

must not be unreasonably withheld;

b

is deemed to have been given if it is neither given nor refused within 2 months of the receipt of the plans for approval and, in the case of a refusal, accompanied by a statement of the grounds of refusal; and

c

may be given subject to such reasonable requirements as the drainage authority may make for the protection of any drainage work, fishery, water resources, or for the prevention of flooding or pollution or in the discharge of its environmental duties.

4

The drainage authority must use its reasonable endeavours to respond to the submission of any plans before the expiration of the period mentioned in sub-paragraph (3)(b).

Annotations:
Commencement Information
I8

Sch. 13 para. 2 in force at 30.6.2022, see art. 1

I93

Without limitation on the scope of paragraph 2, the requirements which the drainage authority may make under that paragraph include conditions requiring Network Rail at its own expense to construct such protective works, whether temporary or permanent, before or during the construction of the specified works (including the provision of flood banks, walls or embankments or other new works and the strengthening, repair or renewal of existing banks, walls or embankments) as are reasonably necessary—

a

to safeguard any drainage work against damage; or

b

to secure that its efficiency for flood defence purposes is not impaired and that the risk of flooding is not otherwise increased,

by reason of any specified work.

Annotations:
Commencement Information
I9

Sch. 13 para. 3 in force at 30.6.2022, see art. 1

I104

1

Subject to sub-paragraph (2), any specified work, and all protective works required by the drainage authority under paragraph 3, must be constructed—

a

without unnecessary delay in accordance with the plans approved or settled under this Schedule; and

b

to the reasonable satisfaction of the drainage authority,

and an officer of the drainage authority is entitled to watch and inspect the construction of such works.

2

Network Rail must give to the drainage authority not less than 14 days’ notice in writing of its intention to commence construction of any specified work and notice in writing of its completion not later than 7 days after the date on which it is completed.

3

If any part of a specified work or any protective work required by the drainage authority is constructed otherwise than in accordance with the requirements of this Schedule, the drainage authority may by notice in writing require Network Rail at Network Rail’s own expense to comply with the requirements of this Schedule or (if Network Rail so elects and the drainage authority in writing consents, such consent not to be unreasonably withheld or delayed) to remove, alter or pull down the work and, where removal is required, to restore the site to its former condition to such extent and within such limits as the drainage authority reasonably requires.

4

Subject to sub-paragraph (5) and paragraph 8, if within a reasonable period, being not less than 28 days from the date when a notice under sub-paragraph (3) is served upon Network Rail, it has failed to begin taking steps to comply with the requirements of the notice and subsequently to make reasonably expeditious progress towards their implementation, the drainage authority may execute the works specified in the notice and any expenditure incurred by it in so doing is recoverable from Network Rail.

5

In the event of any dispute as to whether sub-paragraph (3) is properly applicable to any work in respect of which notice has been served under that sub-paragraph, or as to the reasonableness of any requirement of such a notice, the drainage authority must not except in an emergency exercise the powers conferred by sub-paragraph (4) until the dispute has been finally determined.

6

If by reason of construction of the specified work the Agency’s access to flood defences or equipment maintained for flood defence purposes is materially obstructed, Network Rail must provide such alternative means of access to allow the Agency to maintain the flood defence or use the equipment no less effectively than before the obstruction.

Annotations:
Commencement Information
I10

Sch. 13 para. 4 in force at 30.6.2022, see art. 1

I115

1

Subject to sub-paragraph (5) Network Rail must from the commencement of the construction of the specified works maintain in good repair and condition and free from obstruction any drainage work which is situated within the limits of deviation and on land held by Network Rail for the purposes of or in connection with the specified works, whether or not the drainage work is constructed under the powers conferred by this Order or is already in existence.

2

If any such drainage work which Network Rail is liable to maintain is not maintained to the reasonable satisfaction of the drainage authority, the drainage authority may by notice in writing require Network Rail to repair and restore the work, or any part of such work, or (if Network Rail so elects and the drainage authority in writing consents, such consent not to be unreasonably withheld or delayed), to remove the work and restore the site to its former condition, to such extent and within such limits as the drainage authority reasonably requires.

3

Subject to sub-paragraph (5) and paragraph 8, if, within a reasonable period being not less than 28 days beginning with the date on which a notice in respect of any drainage work is served under sub-paragraph (2) on Network Rail, Network Rail has failed to begin taking steps to comply with the reasonable requirements of the notice and has not subsequently made reasonably expeditious progress towards their implementation, the drainage authority may do what is necessary for such compliance and may recover any expenditure reasonably incurred by it in so doing from Network Rail.

4

In the event of any dispute as to the reasonableness of any requirement of a notice served under sub-paragraph (2), the drainage authority must not except in a case of an emergency exercise the powers conferred by sub-paragraph (3) until the dispute has been finally determined.

5

This paragraph does not apply to—

a

drainage works which are vested in the drainage authority, or which the drainage authority or another person is liable to maintain and is not precluded by the powers of the Order from doing so; and

b

any obstruction of a drainage work for the purpose of a work or operation authorised by this Order and carried out in accordance with the provisions of this Schedule.

Annotations:
Commencement Information
I11

Sch. 13 para. 5 in force at 30.6.2022, see art. 1

I126

Subject to paragraph 8, if by reason of the construction of any specified work or of the failure of any such work the efficiency of any drainage work for flood defence purposes is impaired, or that drainage work is otherwise damaged, such impairment or damage must be made good by Network Rail to the reasonable satisfaction of the drainage authority and if Network Rail fails to do so, the drainage authority may make good the same and recover from Network Rail the expense reasonably incurred by it in so doing.

Annotations:
Commencement Information
I12

Sch. 13 para. 6 in force at 30.6.2022, see art. 1

I137

1

Network Rail must take all such measures as may be reasonably practicable to prevent any interruption of the free passage of fish in the fishery during the construction of any specified work.

2

If by reason of—

a

the construction of any specified work; or

b

the failure of any such work,

damage to a fishery is caused, or the Agency has reason to expect that such damage may be caused, the drainage authority may serve notice on Network Rail requiring it to take such steps as may be reasonably practicable to make good the damage, or, as the case may be, to protect the fishery against such damage.

3

Subject to paragraph 8, if within such time as may be reasonably practicable for that purpose after the receipt of written notice from the Agency of any damage or expected damage to a fishery, Network Rail fails to take such steps as are described in sub-paragraph (2), the drainage authority may take those steps and may recover from Network Rail the expense reasonably incurred by it in doing so.

4

Subject to paragraph 8, in any case where immediate action by the Agency is reasonably required in order to secure that the risk of damage to the fishery is avoided or reduced, the drainage authority may take such steps as are reasonable for the purpose, and may recover from Network Rail the reasonable cost of so doing provided that notice specifying those steps is served on Network Rail as soon as reasonably practicable after the Agency has taken, or commenced to take, the steps specified in the notice.

Annotations:
Commencement Information
I13

Sch. 13 para. 7 in force at 30.6.2022, see art. 1

I148

Nothing in paragraphs 4(4), 5(3), 6, 7(3) and (4) authorises the drainage authority to execute works on or affecting an operational railway forming part of Network Rail’s network without the prior consent in writing of Network Rail such consent not to be unreasonably withheld or delayed.

Annotations:
Commencement Information
I14

Sch. 13 para. 8 in force at 30.6.2022, see art. 1

I159

Network Rail must indemnify the drainage authority in respect of all costs, charges and expenses which the drainage authority may reasonably incur or have to pay or which it may sustain—

a

in the examination or approval of plans under this Schedule; and

b

in the inspection of the construction of the specified works or any protective works required by the drainage authority under this Schedule.

Annotations:
Commencement Information
I15

Sch. 13 para. 9 in force at 30.6.2022, see art. 1

I1610

1

Without affecting the other provisions of this Schedule, Network Rail must indemnify the drainage authority from all claims, demands, proceedings, costs, charges, penalties, damages, expenses and losses, which may be made or taken against, recovered from, or incurred by, the drainage authority by reason of—

a

any damage to any drainage work so as to impair its efficiency for the purposes of flood defence;

b

any damage to the fishery;

c

any raising or lowering of the water table in land adjoining the authorised development or any sewers, drains and watercourses;

d

any flooding or increased flooding of any such lands; or

e

inadequate water quality in any watercourse or other surface waters or in any groundwater,

which is caused by the construction of any of the specified works or any act or omission of Network Rail, its contractors, agents or employees whilst engaged upon the work.

2

The drainage authority must give to Network Rail reasonable notice of any such claim or demand and no settlement or compromise may be made without the agreement of Network Rail which agreement must not be unreasonably withheld or delayed.

Annotations:
Commencement Information
I16

Sch. 13 para. 10 in force at 30.6.2022, see art. 1

I1711

The fact that any work or thing has been executed or done by Network Rail in accordance with plans approved by the drainage authority, or to the drainage authority’s satisfaction, or in accordance with any directions or award of an arbitrator, does not relieve Network Rail from any liability under the provisions of this Schedule.

Annotations:
Commencement Information
I17

Sch. 13 para. 11 in force at 30.6.2022, see art. 1

I1812

Any dispute arising between Network Rail and the drainage authority under this Schedule, if the parties agree, is to be determined by arbitration under article 37 (arbitration), but otherwise is to be determined by the Secretary of State for Environment, Food and Rural Affairs and the Secretary of State for Transport acting jointly on a reference to them by Network Rail or the drainage authority, after notice in writing by one to the other.