- Latest available (Revised)
- Point in Time (27/07/2022)
- Original (As made)
Point in time view as at 27/07/2022.
There are currently no known outstanding effects for the The Electricity and Gas (Energy Company Obligation) Order 2022, Section 11.
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
11.—(1) A qualifying action is a measure which satisfies Condition A, B or C in this article.
(2) Condition A is that the Administrator is satisfied that the measure—
(a)meets the requirements of article 12 (general requirements);
(b)meets the condition—
(i)in any one of articles 13 to 21 (ECO4 project measures); or
(ii)in article 22 or 23 (in-fill measures);
(c)where it is a heating measure—
(i)other than where it is a measure falling within sub-paragraph (b)(ii), meets the minimum insulation requirement in article 24 or 25; and
(ii)meets the requirements of article 26 (additional requirements to be met by heating measures);
(d)meets the requirements of article 31 (installation standards, consumer protection and smart meter advice); and
(e)is notified to the Administrator in accordance with article 43.
(3) Condition B (which relates to ECO3 interim delivery actions) is that the Administrator is satisfied that the measure—
(a)is completed on or after 1st April 2022 and before 1st July 2022;
(b)meets the requirements set out in article 13(1)(a), (b), (d), (e) and (g) of the 2018 Order;
(c)meets the requirements of article 31(1)(b) or (c);
(d)is not—
(i)a demonstration action;
(ii)the installation of equipment for the generation of heat wholly or partly from biofuel, oil or liquefied petroleum gas, unless the measure is a repair;
(iii)the installation of a connection to a district heating system that delivers heat generated wholly or partly from biofuel, oil or liquefied petroleum gas; or
(iv)a repair other than—
(aa)a repair of a renewable heating system;
(bb)a repair of an efficient boiler or an efficient electric storage heater; or
(cc)a repair of equipment for the generation of heat wholly or partly from biofuel, oil or liquefied petroleum gas; and
(e)is notified to the Administrator in accordance with article 43.
(4) Condition C is that the measure is a surplus action.
Commencement Information
I1Art. 11 in force at 27.7.2022, see art. 1(1)
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: