PART 1PRELIMINARY

InterpretationI12

1

In this Order except where provided otherwise—

  • the 1961 Act” means the Land Compensation Act 196111;

  • the 1965 Act” means the Compulsory Purchase Act 196512;

  • the 1980 Act” means the Highways Act 198013;

  • the 1981 Act” means the Compulsory Purchase (Vesting Declarations) Act 198114;

  • the 1984 Act” means the Road Traffic Regulation Act 198415;

  • the 1990 Act” means the Town and Country Planning Act 199016;

  • the 1991 Act” means the New Roads and Street Works Act 199117;

  • the 2004 Act” means the Traffic Management Act 200418;

  • the 2008 Act” means the Planning Act 200819;

  • address” includes any number or address for the purposes of electronic transmission;

  • Anglian Water” means Anglian Water Services Limited (company number 2366656), whose registered office is at Lancaster House, Lancaster Way, Ermine Business Park, Huntingdon, Cambridgeshire, United Kingdom, PE29 6XU (or a related subsidiary company);

  • apparatus” has the same meaning as in Part 3 of the 1991 Act;

  • authorised development” means the development and associated development described in Schedule 1 (authorised development) and any other development authorised by this Order;

  • book of reference” means the document of that description certified by the Secretary of State as the book of reference for the purposes of this Order;

  • bridleway” has the same meaning as in the 1980 Act;

  • BT” means British Telecommunications Plc (company number 1800000), whose registered office is at 81 Newgate Street, London, EC1A 7AJ;

  • building” includes any structure or erection or any part of a building, structure or erection;

  • carriageway” has the same meaning as in section 329(1) of the 1980 Act;

  • classification of roads plans” means the documents of that description certified by the Secretary of State as the classification of roads plans for the purposes of this Order;

  • commence” means beginning to carry out any material operation (as defined in section 56(4) of the 1990 Act)20 forming part of the authorised development other than operations consisting of archaeological investigations and mitigation works, ecological surveys and pre-construction ecological mitigation, investigations for the purpose of assessing and monitoring ground conditions and levels, remedial work in respect of any contamination or other adverse ground conditions, erection of any temporary means of enclosure, receipt and erection of construction plant, equipment, welfare facilities and temporary buildings and site clearance, and the temporary display of site notices or advertisements, and “commencement” is to be construed accordingly;

  • cycle track” has the same meaning as in section 329(1) (further provisions as to interpretation) of the 1980 Act21 and for the purposes of this Order includes parts of a cycle track and a right of way on foot;

  • “de-trunking plans” mean the documents of that description certified by the Secretary of State as the de-trunking plans for the purposes of this Order;

  • electronic transmission” means a communication transmitted—

    1. a

      by means of an electronic communications network; or

    2. b

      by other means but while in electronic form;

    and in this definition “electronic communications network” has the same meaning as in section 32(1) (meaning of electronic communications networks and services) of the Communications Act 200322;

  • EMP (First Iteration)” means the first iteration of the environmental management plan produced in accordance with the DMRB during the preliminary design stage and certified by the Secretary of State as the environmental management plan for the purposes of the Order;

  • engineering drawings and sections” means the documents of that description certified as the engineering drawings and sections by the Secretary of State for the purposes of this Order;

  • environmental statement” means the document of that description certified by the Secretary of State as the environmental statement for the purposes of this Order;

  • flood risk assessment” means the document of that description certified by the Secretary of State as the flood risk assessment for the purposes of this Order;

  • footpath” has the same meaning as in section 329(1) of the 1980 Act;;

  • footway” has the same meaning as in section 329(1) of the 1980 Act;

  • general arrangement plans” means the documents of that description certified by the Secretary of State as the general arrangement plans for the purposes of this Order;

  • hedgerow plans” means the documents of that description certified as the hedgerow plans by the Secretary of State for the purposes of this Order;

  • highway” has the same meaning as in section 328(1) of the 1980 Act;

  • highway authority” means the undertaker;

  • horizontal directional drilling” refers to a boring technique involving drilling in an arc between two points;

  • horizontal directional drilling compound” means a construction site associated with the onshore connection works where horizontal directional drilling or other trenchless construction technique is proposed including hard standing, lay down and storage areas for construction materials and equipment, areas for spoil, areas for vehicular parking, bunded storage areas, areas comprising water and bentonite tanks, pumps and pipes, areas for welfare facilities including offices and canteen and washroom facilities, wheel washing facilities, workshop facilities and temporary fencing or other means of enclosure and areas for other facilities required for construction purposes;

  • Hornsea Three” means the wind farm to be constructed pursuant to the Hornsea Three Order;

  • Hornsea Three Order” means the Hornsea Three Offshore Wind Farm Order 2020;

  • land plans” means the documents of that description certified as the land plans by the Secretary of State for the purposes of this Order;

  • limits of deviation” means the limits of deviation referred to in article 7 (limits of deviation);

  • local highway authority” means Norfolk County Council;

  • maintain” in relation to the authorised development includes to inspect, repair, adjust, alter, remove, replace or reconstruct, provided such works do not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement, and any derivative of “maintain” is to be construed accordingly;

  • NGG” means National Grid Gas Plc (company number 2006000), whose registered office is at 1-3 Strand, London, WC2N 5EH;

  • Order land” means the land shown on the land plans which is within the limits of the land to be acquired permanently or used permanently or temporarily and described in the Book of Reference;

  • Order limits” means the limits of land to be acquired permanently or used temporarily as shown on the land plans and works plans within which the authorised development may be carried out;

  • Ørsted” means Ørsted Hornsea Project Three (UK) Limited (company number 08584210), whose registered office is at 5 Howick Place, London, SW1P 1WG;

  • outline traffic management plan” means the document of that description certified as the outline traffic management plan by the Secretary of State for the purposes of this Order;

  • owner”, in relation to land, has the same meaning as in section 7 (interpretation) of the Acquisition of Land Act 198123;

  • relevant highway authority” means the local highway authority for the land in question;

  • relevant planning authority” means in any given provision of this Order, the planning authority for the area in which the land to which the provision relates is situated;

  • rights of way and access plans” means the documents of that description certified as the rights of way and access plans by the Secretary of State for the purposes of this Order;

  • special category land plans” means the documents of that description certified by the Secretary of State as the special category land plans for the purposes of this Order;

  • statutory undertaker” means any statutory undertaker for the purposes of section 127(8) (statutory undertakers’ land) of the 2008 Act;

  • street” means a street within the meaning of section 4824 (streets, street works and undertakers) of the 1991 Act, together with land on the verge of a street or between two carriageways, and includes part of a street,

  • street authority”, in relation to a street, has the same meaning as in Part 3 of the 1991 Act;

  • traffic authority” has the same meaning as in section 121A25 (traffic authorities) of the 1984 Act;

  • traffic regulation plans” means the documents of that description certified as the traffic regulation plans by the Secretary of State for the purposes of this Order;

  • tribunal” means the Lands Chamber of the Upper Tribunal;

  • trunk road” means a highway which is a trunk road by virtue of—

    1. a

      section 1026 (general provision as to trunk roads) or section 19(1)27 (certain special roads and other highways to become trunk roads) of the 1980 Act;

    2. b

      an order made or direction given under section 10 of that Act; or

    3. c

      an order granting development consent; or

    4. d

      any other enactment;

  • UKPN” means UK Power Networks (Operations) Limited (company number 03870728), whose registered office is at Newington House, 237 Southwark Bridge Road, London, SE1 6NP;

  • undertaker” means National Highways Limited, (company number 09346363), whose registered office is at Bridge House, 1 Walnut Tree Close, Guildford, Surrey, GU1 4LZ;

  • watercourse” includes all rivers, streams, ditches, drains, canals, cuts, culverts, dykes, sluices, sewers and passages through which water flows except a public sewer or drain; and

  • works plans” means the documents of that description certified as the works plans by the Secretary of State for the purposes of this Order.

2

References in this Order to rights over land include references to rights to do, or to place and maintain, anything in, on or under land or in the airspace above its surface and references in this Order to the imposition of restrictive covenants are references to the creation of rights over land which interfere with the interests or rights of another and are for the benefit of land which is acquired under this Order or is otherwise comprised in the Order land.

3

All distances, directions and lengths referred to in this Order are approximate and distances between points on a work comprised in the authorised development are taken to be measured along that work.

4

For the purposes of this Order, all areas described in square metres in the book of reference are approximate.

5

References in this Order to points identified by letters or numbers are to be construed as references to points so lettered or numbered on the relevant plans.

6

References in this Order to numbered works are references to the works as numbered in Schedule 1 (authorised development).

7

The expression “includes” may be construed without limitation.