The A47 North Tuddenham to Easton Development Consent Order 2022

Status:

This is the original version (as it was originally made).

Article 2

SCHEDULE 1AUTHORISED DEVELOPMENT

In the administrative areas of Norfolk County Council and Broadland, South Norfolk and Breckland District Councils.

The authorised development is a nationally significant infrastructure project as defined in sections 14 (nationally significant infrastructure projects: general) and 22 (highways)(1) of the 2008 Act and associated development within the meaning of section 115(2)(2) of the 2008 Act, comprising—

Work No. 1 – Alteration of the A47 of 9,169 metres in length from a point 370m west of Fox Lane overbridge to a point 180m west of Easton roundabout, including the construction of a mainline dual carriageway, footways, embankments, two laybys, police observation platform, maintenance accesses, approaches and associated drainage and noise barriers shown on sheet numbers 1, 2, 4 to 9 and 11 to 16 of the works plans;

Work No. 2 – a combination of re-surfaced, realigned and new carriageway from Main Road east for 380 metres to the new junction with Lyng Road (Work No. 4) and then 775 metres to re-join the existing A47 alignment at the altered junction with Low Road, including footways, embankments, approaches, associated drainage and flood protection bund shown on sheet numbers 1, 2 and 4 of the works plans;

Work No. 3 – a new driveable access track, associated earthworks and drainage, from an existing access onto Fox Lane and a new field access with passing places, running eastwards for 579 metres to a private property east of Oak Farm, shown on sheet number 1 of the works plans;

Work No. 4 – a combination of new and realigned carriageway, footways, embankments, approaches and associated drainage to form the realigned Lyng Road north of the junction with Work No. 2, shown on sheet number 2 of the works plans;

Work No. 5 – drainage works east of Oak Farm comprising an extension of the existing West Culvert under the proposed A47 mainline dual carriageway (Work No.1) and creation of the new West Culvert under Work No. 2 east of the new junction to the realigned Lyng Road (Work No. 4), shown on sheet number 2 of the works plans;

Work No. 6 – a new drainage basin south east of Oak Farm, plus associated drainage and driveable maintenance access track with an outfall into the local watercourse and a drainage connection to the basin on the southern side of the proposed A47 mainline dual carriageway (Work No.1), shown on sheet number 2 of the works plans;

Work No. 7 – a new drainage basin with associated drainage and driveable maintenance access track south from the A47 mainline dual carriageway (Work No. 1) with an outfall into the River Tud east of Whitford bridge and a drainage connection to the basin, shown on sheet 4 of the works plans;

Work No. 8 – a combination of new and widened carriageway, footways, embankments and associated drainage between the existing Mattishall Lane alignment and the proposed Mattishall Lane Link Road (Work No. 9), shown on sheet number 4 of the works plans;

Work No. 9 – a new carriageway, footways, approaches, drainage and underbridge with cycle track forming the new Mattishall Lane Link Road from the existing A47 471 metres south west to Mattishall Lane, shown on sheet number 4 of the works plans;

Work No. 10 – alteration of the existing A47 and Mattishall Lane junction including the provision of a ghost island and the creation and upgrade of footways on Mattishall Lane and the existing A47 between the new Mattishall Lane Link Road (Work No.9) junction to the west and the Hockering junction with the existing A47 to the east plus the creation of a new field access off Mattishall Lane, shown on sheet 4 of the works plans;

Work No. 11 – a new driveable access track with passing places, from Mattishall Lane south of the proposed A47 mainline dual carriageway (Work No. 1) running eastwards for 469 metres, shown on sheet numbers 4 and 5 of the works plans;

Work No. 12 – a new drainage basin, associated drainage and driveable maintenance access track and a new outfall into the River Tud between Work No. 11 and the River Tud with a drainage connection to the basin, shown on sheet number 5 of the works plans;

Work No. 13 – a new culvert at Newgate House, under the proposed A47 mainline dual carriageway (Work No. 1) south of Gypsy Lane, shown on sheet number 6 of the works plans;

Work No. 14 – a new drainage basin east of Gypsy Lane with associated drainage and a driveable maintenance access track north from the A47 mainline dual carriageway (Work No. 1) with an outfall into the River Tud to the south and a drainage connection under the proposed A47 mainline dual carriageway (Work No. 1) to the basin, shown on sheet number 6 of the works plans;

Work No. 15 – a new drainage basin, associated drainage, a wetland area east of Church Lane, and a driveable maintenance access track from Work No 16, with a new outfall into the River Tud east of Church Lane bridge and a drainage connection to the basin shown on sheet number 7 of the works plans;

Work No. 16 – a new driveable access track with passing place, associated earthworks and drainage, from Church Lane 469 metres east to Work No. 15 and Hillcrest Cottage, shown on sheet numbers 7 and 8 of the works plans;

Work No. 17 – a combination of re-surfaced, realigned and new carriageway with cycle track, embankments, approaches and associated drainage to form the new link road from the existing A47 east of Hockering 913 metres east to Wood Lane junction northern dumbbell roundabout (Work No. 20), shown on sheet numbers 7, 8 and 10 of the works plans;

Work No. 18 – a new carriageway, embankments and associated drainage to form the Wood Lane junction east bound off slip road to the northern dumbbell roundabout, shown on sheet numbers 8, 9 and 10 of the works plans;

Work No. 19 – a new carriageway, embankments and associated drainage to form the Wood Lane junction west bound on slip road from the southern dumbbell roundabout, shown on sheet numbers 8 and 9 of the works plans;

Work No. 20 – a new carriageway, embankments and associated drainage to form the Wood Lane junction northern dumbbell roundabout, shown on sheet number 10 of the works plans;

Work No. 21 – a new Wood Lane junction underbridge and associated carriageway, embankments and drainage between the dumbbell roundabouts (Work Nos. 20 and 22), shown on sheet numbers 9 and 10 of the works plans;

Work No. 22 – a new carriageway, embankments and associated drainage to form the Wood Lane junction southern dumbbell roundabout, shown on sheet number 9 of the works plans;

Work No. 23 – a new carriageway, embankments and associated drainage to form the Wood Lane junction east bound on slip road from the northern dumbbell roundabout, shown on sheet numbers 9 and 10 of the works plans;

Work No. 24 – a new carriageway, embankments and associated drainage to form the Wood Lane junction west bound off slip road to the southern dumbbell roundabout, shown on sheet numbers 9 and 11 of the works plans;

Work No. 25 –a combination of re-surfaced and new carriageway, footways, embankments and associated drainage to form the new B1535 Wood Lane junction with Work No. 17, shown on sheet number 10 of the works plans;

Work No. 26 – a new restricted byway from Hall Farm underpass (Work No. 30) west 781 metres to Work No. 26a the optional cycle track connection to the realigned Wood Lane, shown on sheet numbers 9, 10 and 11 of the works plans;

Work No. 26a – a new cycle track between the realigned B1535 Wood Lane (Work No. 25) and the start of the new restricted byway (Work No. 26) which meets the diverted restricted byway Honingham RB1, shown on sheet number 10 of the works plans;

Work No. 27 – a new drainage basin, associated drainage and driveable maintenance access track, between the existing A47 and proposed A47 mainline dual carriageway (Work No. 1) east of the proposed A47 Wood Lane junction southern dumbbell roundabout (Work No. 22), accessed from Work No. 32, shown on sheet number 9 of the works plans;

Work No. 28 – a combination of realigned and new carriageway with footways, embankments, approaches and associated drainage to form the link to Dereham Road, Honingham, from Work No. 32 and traffic calming measures at Dereham Road , shown on sheet numbers 9 of the works plans;

Work No. 29 – a new bridleway with new cycle track between Berrys Lane and Dereham Road to replace an existing parallel footpath, shown on sheet number 9 of the works plans;

Work No. 30 – a new Hall Farm underpass, access road to the existing A47 and new section of associated access ramps joining the new restricted byway from Wood Lane junction (Work No. 26), shown on sheet number 11 of the works plans;

Work No. 31 – a new drainage basin between the existing A47 and proposed A47 mainline dual carriageway (Work No. 1) and south east of Hall Farm underpass (Work No. 30), with associated drainage connections and a driveable maintenance access track to the Hall Farm access track (Work No. 30), shown on sheet number 11 of the works plans;

Work No. 32 – reconfiguration of the existing A47 carriageway north of Honingham with a new cycle track, embankments and associated drainage, including a ghost island at the existing A47 junction with the realigned Dereham Road (Work No.28) and modified Honingham bypass structure over the River Tud, between the Wood Lane junction southern dumbbell roundabout (Work No. 22) east 1,663 metres to the existing A47 Honingham roundabout , shown on sheet numbers 9, 11, 12 and 13 of the works plans;

Work No. 33 – a new driveable private access track with passing places, associated earthworks and drainage, connecting Hall Farm to Hall Farm underpass and access road (Work No. 30), shown on sheet number 11 of the works plans;

Work No. 34 – a new drainage basin, east of the proposed A47 mainline dual carriageway (Work No. 1) and north of the new A47 River Tud crossing (Work No. 35), with associated drainage and a driveable access track from Work No. 1, shown on sheet number 12 of the works plans;

Work No. 35 – a new bridge structure over the River Tud with new carriageway, embankments, approaches and associated drainage for the A47 River Tud crossing, with associated flood risk compensation earthworks south of the River Tud between the existing A47 and proposed A47 mainline dual carriageway (Work No. 1) including fences for the protection of bats shown on sheet number 12 of the works plans;

Work No. 36 – a new drainage basin and wetland area south of the River Tud crossing (Work No. 35), between the existing A47 and proposed A47 mainline dual carriageway (Work No. 1), with associated drainage connections and a new outfall to the River Tud west of the River Tud crossing and driveable maintenance access track from Work No. 32, shown on sheet number 12 of the works plans;

Work No. 37 – a new cycle track between Honingham roundabout and the existing A47 west of St Andrew’s Church (Work No. 39), new Honingham church underpass, embankments, and drainage shown on sheet number 13 of the works plans;

Work No. 38 – a replacement hardstanding area west of St Andrew’s Church, Honingham, and associated access road to the existing A47 (Work No. 39), shown on sheet number 13 of the works plans.

Work No. 39 –alteration and reconfiguration of the existing A47 between the proposed cycle track (Work No. 37) and Taverham Road to provide a single lane access road incorporating parking spaces, a vehicle turning area, a secure access gate and adjacent cycle track south east of St Andrew’s Church, shown on sheet numbers 13 and 14 of the works plans;

Work No. 40 – realigned new carriageway, footways, embankments, and drainage between Honingham roundabout and the proposed Norwich Road junction southern dumbbell roundabout (Work No. 46), shown on sheet numbers 13 and 14 of the works plans;

Work No. 41 – a new drainage basin and wetland area, associated drainage with new outfall to the River Tud and driveable access track, east of Taverham Road and between the River Tud and Work No. 47, shown on sheet 14 of the works plans;

Work No. 42 – a new carriageway, embankments and drainage to form the proposed Norwich Road junction eastbound off-slip road to the northern dumbbell roundabout, shown on sheet numbers 13 and 14 of the works plans;

Work No. 43 – a new carriageway, embankments and drainage to form the proposed Norwich Road junction westbound on-slip road from the southern dumbbell roundabout, shown on sheet numbers 13 and 14 of the works plans;

Work No. 44 – a new carriageway, embankments and drainage to form the proposed Norwich Road junction northern dumbbell roundabout, shown on sheet number 14 of the works plans;

Work No. 45 – a new Norwich Road junction underbridge and associated carriageway, embankments and drainage between the dumbbell roundabouts (Work Nos. 44 and 46), shown on sheet number 14 of the works plans;

Work No. 46 – a new carriageway, embankments and drainage to form the proposed Norwich Road junction southern dumbbell roundabout, shown on sheet number 14 of the works plans;

Work No. 47 – a new and altered carriageway, footways, embankment and drainage from the proposed Norwich Road junction northern dumbbell roundabout (Work No. 44) north 270 metres to Taverham Road, shown on sheet number 14 of the works plans;

Work No. 48 – new carriageway, embankments, approaches and drainage to form the proposed Norwich Road junction east bound on slip road from the northern dumbbell roundabout, shown on sheet numbers 14 and 15 of the works plans;

Work No. 49 – a new carriageway, embankments, approaches and drainage to form the proposed Norwich Road junction west bound off slip road to the southern dumbbell roundabout, shown on sheet numbers 14 and 15 of the works plans;

Work No. 50 – a realigned and new carriageway, embankments, approaches and drainage from the proposed Norwich Road junction southern dumbbell roundabout (Work No. 46) east 1,265 metres to Dereham Road, Easton, shown on sheet numbers 14, 15 and 16 of the works plans;

Work No. 51 – a new carriageway from the realigned Taverham Road (Work No. 47) to a new field access and a new cycle track to Church Lane, Easton, plus associated embankments and drainage, shown on sheet numbers 14, 15 and 16 of the works plans;

Work No. 52 – a new Easton footbridge, embankments, drainage and access ramps to carry a cycle track between Church Lane, north of the A47, and Dereham Road, Easton, shown on sheet numbers 15 and 16 of the works plans;

Work No. 53 – alterations to Church Lane carriageway, embankments and drainage to create a new driveable access road and new cycle track linking Work No. 52 with the junction of Church Lane with Ringland Road, shown on sheet number 16 of the works plans;

Work No. 54 – altering the southern corner of Rotten Row and Church Lane junction with associated drainage alterations, shown on sheet number 17 of the works plans;

Work No. 55 – southern end of a surface water drainage channel crossing the new driveable access track, between Church Lane and Hillcrest Cottage (Work No. 16) from the north side, shown on sheet number 8 of the works plans;

Work No. 56 – flood alleviation compensation and environmental mitigation area including earthworks, embankments, new ponds, new wetlands and watercourse alterations north of Work No. 2 and east of Lyng Road, shown on sheet 2 and sheet number 2 (inset A) of the works plans;

Work No. 57 – flood alleviation compensation and environmental mitigation area, including watercourse alterations and new wetlands, north of The Street and to the east of Hockering, shown on sheet number 6 and sheet number 6 (inset B) of the works plans;

Work No. 58 – a temporary material storage, management and processing area south of the proposed A47 mainline dual carriageway (Work No. 1), south east of Work No. 5, east of Lyng Road and north of Low Road, shown on sheet 2 of the works plans;

Work No. 59 – a traffic management site compound between the existing A47, Low Road, the proposed A47 mainline dual carriageway (Work No. 1) and the proposed Mattishall Lane Link Road (Work No. 9), shown on sheet 4 of the work plans;

Work No. 60 – a temporary material storage area between the existing A47, the proposed A47 mainline dual carriageway (Work No. 1), the proposed Mattishall Lane Link Road (Work No. 9) and existing Mattishall Lane, shown on sheet 4 of the works plans;

Work No. 61 – a temporary material storage, management and processing area, between the existing A47 and proposed A47 mainline dual carriageway (Work No.1) south east of Hockering, shown on sheet numbers 6 and 7 of the works plans;

Work No. 62 – a temporary compound area, including material storage, management and processing, south of the proposed A47 mainline dual carriageway (Work No. 1), east of Hillcrest Cottage and south west of the proposed A47 Wood Lane Junction southern dumbbell roundabout (Work No. 22), including a temporary connection to existing overhead 11kV electricity cables shown on sheets 8 and 9 of the works plans;

Work No. 63 – a temporary material storage area south and west of the proposed A47 Wood Lane Junction southern dumbbell roundabout (Work No. 22), shown on sheet 9 of the works plans;

Work No. 64 – a material storage area north of the proposed A47 mainline dual carriageway (Work No. 1) and east of the proposed A47 Wood Lane Junction northern dumbbell roundabout (Work No. 20), shown on sheet numbers 10 and 11 of the works plans;

Work No. 65 – a temporary main compound area, including material storage, management and processing, south of the existing A47 Honingham roundabout, shown on sheet 13 of the work plans;

Work No. 66 – a temporary material storage, management and processing area south of the existing A47 Honingham roundabout adjacent to east side of Work No. 65, shown on sheet 13 of the work plans;

Work No. 67 – a temporary material storage, management and processing area north east of the proposed A47 Norwich Road junction northern dumbbell roundabout (Work No. 44) and east of Work No. 41, shown on sheet 14 of the works plans;

Work No. 68 – a temporary material storage, management and processing area east of the proposed Norwich Road junction southern dumbbell roundabout (Work No. 46), shown on sheet numbers 14 and 15 of the works plans;

Work No. 69 –a temporary material storage, management and processing area north of the proposed A47 mainline dual carriageway (Work No. 1) situated between Work Nos. 93 and 94, shown on sheet number 15 of the works plans;

Work No. 70 –a temporary material storage, management and processing area north of the proposed A47 mainline dual carriageway (Work No. 1) situated between Work No. 93 and 94, shown on sheet number 15 of the works plans;

Work No. 71 – a temporary compound area north of the existing Easton roundabout and west of Church Lane, Easton, shown on sheet numbers 15 and 16 of the works plans;

Work No. 72 – a temporary material storage, management and processing area north of Work No. 71 and between Work No. 94 and Church Lane, Easton, shown on sheet numbers 15 and 16 of the works plans;

Work No. 73 – removal of the overhead electronic communications cables crossing Work No.1 and 2 between Poppy Wood and Oak Farm, shown on sheet numbers 1 and 2 of the works plans;

Work No. 74 – diversion of potable water pipes and overhead electronic communications and low voltage electricity utility cables along the route of and to the west of the existing Mattishall Lane and crossing Work Nos. 1, 8, 9, 10 and 11, shown on sheet number 4 of the works plans;

Work No. 75 – undergrounding an overhead electronic communications utility line along Mill Lane, Hockering, crossing Work No. 1, shown on sheet number 5 of the works plans;

Work No. 76 – diversion and undergrounding an overhead 11kV electricity line crossing Work No. 1 between the existing A47 and the River Tud, east of Mill Lane, Hockering, shown on sheet number 5 of the works plans;

Work No. 77 – diversion of a main effluent pipeline crossing Work No. 1 between Hockering Water Recycling Centre, Gypsy Lane, and the River Tud, shown on sheet number 6 of the works plans;

Work No. 78 – diversion and undergrounding of an overhead 11kV electricity line crossing Work No. 1 south east of Gypsy Lane and west of a private property at the western end of Trap’s Lane, shown on sheet numbers 6 and 7 of the works plans;

Work No. 79 – diversion and undergrounding of an overhead 11kV electricity line crossing Work No. 1 between the existing A47 and Trap’s Lane, west of Church Lane, shown on sheet number 7 of the works plans;

Work No. 80 – diversion of potable water pipeline and electronic communications cables crossed by Work No. 1, 15, 16 and 17 between the existing A47 and the Church Lane properties and between Church Lane and Hillcrest Cottage, shown on sheet numbers 7 and 8 of the works plans;

Work No. 81 – installation of ducts, cables and apparatus for utilities and electronic communications code operators in north side of the verge of Work No. 17 between the existing A47 and Wood Lane junction northern dumbbell roundabout (Work No. 20), shown on sheet numbers 7, 8 and 10 of the works plans;

Work No. 82 – removal of electronic communications overhead utility cables to Hillcrest Cottage replaced by Work Nos. 80 and 83, shown on sheet number 8 of the works plans;

Work No. 83 – installation of ducts, cables and apparatus for utilities electronic communications code operators along the track between Hillcrest Cottage and Wood Lane junction southern dumbbell roundabout (Work No. 22) crossing Work Nos 1 and 16, shown on sheet numbers 8 and 9 of the works plans;

Work No. 84 – diversion of a high pressure gas pipeline, potable water pipeline and overhead electronic communications and low voltage electricity utility cables along Wood Lane, the existing A47, Berrys Lane and Dereham Road, Honingham, affected by Works Nos. 1, 19, 22, 23, 24, 26, 27, 28, 29 and 32, shown on sheet numbers 9 and 10 of the works plans;

Work No. 85 – diversion and undergrounding of electronic communications overhead utility cables, east of Wood Lane, crossing Work Nos. 1, 17, 18, 20, 21, 22, 24, 25 and 26a, shown on sheet numbers 9 and 10 of the works plans;

Work No. 86 – diversion of 11kV electricity cables crossing the new junction between the new Hall Farm underpass and access road (Work No. 30) and the existing A47, shown on sheet number 11 of the works plans;

Work No. 87 – diversion and undergrounding of electronic communications overhead utility cables along the access track to Hall Farm from the existing A47 crossing Work Nos. 1 and 33, shown on sheet number 11 of the works plans;

Work No. 88 – diversion and undergrounding an overhead 11kV electricity cable crossing Work No. 1 between the existing A47 and Hall Farm, shown on sheet number 11 of the works plans;

Work No. 89 – diversion of a potable water pipeline, an effluent pipeline, overhead electronic communications and low voltage electricity utility cables between the existing Honingham roundabout and existing A47 east of St Andrew’s Church crossed by Works Nos. 1, 32, 37, 38, 39 and 40, shown on sheet numbers 12, 13 and 14 of the works plans;

Work No. 90 – diversion of electricity and electronic communications utility cables crossing the existing A47 and realigned Taverham Road (Works No. 39 and 47), shown on sheet number 14 of the works plans;

Work No. 91 – diversion of electronic communication utility cables crossed by Work Nos. 1, 39, 40, 42, 43 and 47, from Church Farm bridge south along Taverham Road and Blind Lane, then east along Red Barn Lane and Church Road to a connection beside Dereham Road, south-east of St Peter’s Church, Easton, shown on sheet numbers 14, 15, 16, 18 and 19 of the works plans;

Work No. 92 – diversions on the north side of the proposed A47 mainline dual carriageway (Work No. 1) of a potable water pipeline, an effluent pipeline and overhead electronic communications and low voltage electricity utility cables between Taverham Road and Dereham Road, Easton, crossed by the proposed A47 mainline dual carriageway (Work No. 1), Norwich Road junction northern dumbbell roundabout (Work No. 44) and connecting slip roads and side roads, shown on sheet numbers 14 and 15 of the works plans;

Work No. 93 – alterations to the overhead 132kV electricity line with associated temporary work areas between the pylons with temporary access routes to Taverham Road and Church Road, Easton, shown on sheet numbers 15, 19 and 20 of the works plans;

Work No. 94 – installation of the onshore connection works west of Easton consented as part of the Hornsea Three Offshore Wind Farm Order 2020, comprising up to six cable circuits and associated electrical circuit ducts under Works Nos. 1, 50 and 51, and associated link boxes, joint bays, cable ducts, cable protection, joint protection, manholes, marker posts, underground cable marker, tiles and tape, and lighting and other works associated with cable laying, haul roads, vehicular accesses and construction compounds or if horizontal direction drilling is to be used, horizontal direction drilling compounds shown on sheet numbers 15 and 19 of the works plans;

Work No. 95 – removal of existing 11kV overhead electricity utility cables and installation of new ground based sub-station beside Dereham Road with low voltage connection to existing network in highway boundary, shown on sheet numbers 15 and 16 of the works plans;

Work No. 96 – environmental mitigation, including watercourse improvements and creation of ponds and wetlands between the River Tud and proposed A47 mainline dual carriageway (Work No. 1), shown on sheet number 6 of the works plans;

Work No. 97 – River Tud crossing ecological and environmental mitigation, including earthworks, watercourse alterations and creation of ponds and wetlands between the River Tud, existing A47, the proposed A47 mainline dual carriageway (Work No. 1) and the drainage basin east of Hall Farm underpass (Work No. 31), shown on sheet numbers 11 and 12 of the works plans;

Work No. 98 – new carriageway 50m in length and associated embankments, approaches and drainage to provide the option for Norwich Western Link road to connect to the proposed A47 Wood Lane Junction northern dumbbell roundabout (Work No. 20), shown on sheet number 10 of the works plans;

Work No. 99 – temporary haul route from the new field access carriageway connecting to the realigned Taverham Road (Work No. 51) to land parcels between the River Tud, Taverham Road, the A47 mainline dual carriageway (Work No. 1) and Church Lane, north of Easton, to replace access for large vehicles following severance of direct A47 access from Church Lane, shown on sheet numbers 14 and 15 of the works plans;

And for the purposes of or in connection with the construction of any of those works mentioned above, further development within the Order limits which does not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement consisting of:

(a)alteration to the layout of any street permanently or temporarily, including as part of de-trunking or stopping up orders, including but not limited to increasing or reducing the width of the carriageway of the street by reducing or increasing the width of any kerb, footpath, footway, cycle track or verge within the street; altering the level of any such kerb, footpath, footway, cycle track or verge; installing low noise surfacing; and landscaping sections of abandoned sections;

(b)works required for the strengthening, improvement, maintenance or reconstruction of any street;

(c)ramps, means of access, non-motorised links, footpaths, cycle tracks and crossing facilities;

(d)embankments, viaducts, aprons, abutments, shafts, foundations, retaining walls, barriers, pumping stations, parapets, drainage, outfalls, ditches, wing walls, highway lighting, fencing and culverts;

(e)street works, including breaking up or opening up a street, or any sewer, drain or tunnel under it; tunnelling or boring under a street;

(f)works to place, alter, remove or maintain street furniture or apparatus in a street, or apparatus in other land, including mains, sewers, drains, soakaways, pipes, cables, ducts, traffic signals and lights;

(g)works to alter the course of or otherwise interfere with a watercourse;

(h)landscaping, noise bunds and barriers, works associated with the provision of ecological mitigation and other works to mitigate any adverse effects of the construction, maintenance or operation of the authorised development;

(i)works for the benefit or protection of land affected by the authorised development;

(j)site preparation works, site clearance (including fencing, vegetation removal, demolition of existing structures and the creation of alternative footpaths); earthworks (including soil stripping and storage, site levelling); remediation of contamination;

(k)the felling of trees;

(l)construction compounds and working sites, storage areas, temporary vehicle parking, construction fencing, perimeter enclosure, security fencing, construction-related buildings, temporary worker accommodation facilities, welfare facilities, construction lighting, haulage roads and other buildings, machinery, apparatus, works and conveniences;

(m)the provision of other works including pavement works, kerbing and paved areas works, signing, signals, gantries, road markings works, traffic management measures including temporary roads and such other works as are associated with the construction of the authorised development; and

(n)such other works, working sites, storage areas and works of demolition, as may be necessary or expedient for the purposes of, or for purposes ancillary to, the construction of the authorised development.

(1)

Section 22 was substituted by S.I. 2013/1883 and amended by section 1(6) of, and paragraph 153 of Schedule 1 to, the Infrastructure Act 2015 (c. 7).

(2)

Section 115(2) was amended by section 160(1) and (3) of the Housing and Planning Act 2016 (c. 22). There are other amendments to section 115(2) which are not relevant to this Order.

Back to top

Options/Help

Print Options

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources