The A47 North Tuddenham to Easton Development Consent Order 2022

PART 7E+W+SROADS TO BE DE-TRUNKED

Commencement Information

I1Sch. 3 Pt. 7 in force at 2.9.2022, see art. 1

(1)

Parish

(2)

Length of Road

The de-trunking plans – sheets 4, 5, 6, 7 & 8

East Tuddenham Parish

Hockering

A length of 2283 metres of the A47 Trunk Road from point A 303 metres north west of the centreline of the existing Mattishall Lane / existing A47 junction to point B.
The de-trunking plans – sheets 9, 11, 12 & 13
Honingham ParishA length of 1700 metres of the A47 Trunk Road from point C 174 metres south east of the centreline of the Berrys Lane / existing A47 junction, to point D.
The de-trunking plans – sheet 13
Honingham ParishA length of 948 metres of the A47 Trunk Road from point E 70 metres west of the access to St Andrew’s Church, to point F (sheet 14).
The de-trunking plans – sheet 15

Easton Parish

Honingham Parish

A length of 708 metres of the A47 Trunk Road from point G 683 metres west of the centrepoint of the existing A47 / Church Lane roundabout, to point H (sheet 16).
The de-trunking plans – sheet 16
Easton ParishA length of 39 metres of the A47 Trunk Road from point I 23 metres north of the centrepoint of the existing A47 / Church Lane roundabout, to point J.