SCHEDULES

SCHEDULE 3PERMANENT STOPPING UP OF PUBLIC RIGHTS OF WAY

Article 13

PART 1PUBLIC RIGHTS OF WAY TO BE STOPPED UP AND FOR WHICH A SUBSTITUTE IS TO BE PROVIDED

(1)

Public right of way to be stopped up

(2)

Extent of stopping up

(3)

New highway to be substituted

TR8

Between RWST1.1 and RWST1.2 as shown on sheet 4 of the Access and Rights of Way Plans

Between RWDV1.1 and RWDV1.2 as shown on sheet 4 of the Access and Rights of Way Plans

PART 2PUBLIC RIGHTS OF WAY TO BE STOPPED UP AND FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED

(1)

Public right of way to be stopped up

(2)

Extent of stopping up

TR9

Between RWST2.1 and RWST2.2 as shown on sheet 4 of the Access and Rights of Way Plans