Search Legislation

The A428 Black Cat to Caxton Gibbet Development Consent Order 2022

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about opening options

Opening OptionsExpand opening options

Changes over time for: SCHEDULE 10

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The A428 Black Cat to Caxton Gibbet Development Consent Order 2022, SCHEDULE 10. Help about Changes to Legislation

Articles 2 and 48

SCHEDULE 10E+WDOCUMENTS TO BE CERTIFIED

Commencement Information

I1Sch. 10 in force at 8.9.2022, see art. 1

(1)

Document

(2)

Reference number

the book of referenceTR010044/APP/4.3 revision 4
the classification of road plansTR010044/APP/2.9
the Crown land plansTR010044/APP/2.11 revision 3
the de-trunking plansTR010044/APP/2.5
the First Iteration EMPTR010044/APP/6.8 revision 4
the engineering section drawingsTR010044/APP/2.10
the environmental masterplanFigure 2.4 within TR010044/APP/6.2 revision 4
the environmental statementTR010044/APP/6.1-6.3
the general arrangement plansTR010044/APP/2.4
the land plansTR010044/APP/2.2 revision 2
the streets, rights of way and access plansTR010044/APP/2.6 revision 5
the traffic regulation measures plansTR010044/APP/2.7
the permanent speed limit plansTR010044/APP/2.8
the works plansTR010044/APP/2.3
the outline construction traffic management planTR010044/APP/7.4 revision 5
the archaeological mitigation strategyTR010044/EXAM/9.23 revision 3
the habitats planFigure 1 of Appendix 8.3 within TR010044/APP/6.3
the biodiversity pre-commencement planTR010044/APP/6.13 revision 2
the pre-commencement planTR010044/EXAM/9.48 revision 4
the tree constraints planAppendix 7.5 Part 2 and Part 3 within TR010044/APP/6.3 revision 2
scheme design approach and design principlesTR010044/EXAM/9.26 revision 3
flood risk assessmentAppendix 13.4 – Flood Risk Assessment, Appendix 13.4 – Flood Risk Assessment – Annex A – River Great Ouse Hydraulic Modelling Report, Appendix 13.4 – Flood Risk Assessment – Annex B – Ordinary Watercourse Modelling Report, Appendix 13.4 – Flood Risk Assessment – Annex C – Ordinary Watercourse Hydrology Report, within TR010044/APP/6.3, and Flood Risk Assessment Technical Note TR010044/EXAM/9.82 revision 2
Brook Cottages heritage strategyTR010044/EXAM/9.104

Back to top

Options/Help