Article 27
(1) Plot reference number shown on land plans | (2) Purpose for which rights over land may be acquired or restrictive covenants imposed | (3) Relevant part of the authorised development |
---|---|---|
Land Plan – Sheet 1 | ||
1/8b | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 3 |
1/8n | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 3 |
1/8t | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 15 |
1/8p | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 15 |
1/9d | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 15 |
1/9c | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 15 |
1/9f | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 15 |
1/10a | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 3 |
1/10f | Installation, maintenance and use of ducts, cables and apparatus for utilities and electronic communications operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 7, 19, 20 |
1/10j | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 7, 8, 11 |
1/10m | Installation, maintenance and use of ducts, cables and apparatus for utilities and electronic communications operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 7, 8, 19, 20 |
1/16g | Installation, maintenance and use of ducts, cables and apparatus for utilities and electronic communications operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 7, 8, 19, 20 |
1/21d | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 7, 8, 11 |
1/23c | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 6, 18 |
1/23h | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 7, 8, 11 |
1/23n | Construction of the realigned access track over Rockham Ditch. Temporary storage, laydown areas, access and working space to facilitate improvements to the A1 and the construction of the A1 southbound onslip road from the new Black Cat junction circulatory. | Work Nos. 15, 21 |
1/32b | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 6, 18 |
1/36a | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 22 |
1/40c | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 7, 8 |
1/42a | Right to pass and repass with or without plant and vehicles and including access to highways. | Work Nos. 15, 21 |
1/43b | Installation, maintenance and use of ducts, cables and apparatus for utilities and electronic communications operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 9, 15, 21 |
1/43f | Right to pass and repass with or without plant and vehicles and including access to highways. | Work Nos. 15, 21 |
1/46c | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 7, 8 |
Land Plans – Sheet 2 | ||
2/3c | Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 20, 21, 28, 36 |
2/8a | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work No. 32 |
2/8d | Installation, maintenance and use of pipes and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 29, 31 |
2/12b | Installation, maintenance and use of ducts, cables and apparatus for utilities and electronic communications operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 20, 28, 36 |
2/12c | Maintenance access to existing drainage infrastructure. Right to pass and repass with or without plant and vehicles and including access to highways. | - |
2/14b | Installation, maintenance and use of ducts, cables and apparatus for utilities and electronic communications operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 20, 28, 36 |
2/15a | Installation, maintenance and use of ducts, cables and apparatus for utilities and electronic communications operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 20, 28, 36 |
2/16b | Installation, maintenance and use of ducts, cables and apparatus for utilities and electronic communications operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 20, 28, 36 |
2/17a | Installation, maintenance and use of pipes and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 29, 31 |
2/18a | Installation, maintenance and use of pipes and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 29, 31 |
2/20a | Installation, maintenance and use of electric lines, cables, equipment, pipes and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 29, 31, 32 |
2/20b | Installation, maintenance and use of pipes and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 29, 31 |
2/20d | Installation, maintenance and use of pipes and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 21, 29, 31 |
2/24e | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 26, 27 |
2/27a | Installation, maintenance and use of pipes and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 22, 31, 37 |
2/28a | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 37 |
2/29a | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 37 |
2/30a | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 37 |
2/31a | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 37 |
2/33a | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 37 |
2/34a | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 37 |
2/35a | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 37 |
2/36a | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 22, 27, 37 |
2/37a | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 22, 27, 37 |
2/37b | Right to pass and repass with or without plant and vehicles and including access to highways. | - |
2/38a | Right to pass and repass with or without plant and vehicles and including access to highways. | - |
2/38b | Right to pass and repass with or without plant and vehicles and including access to highways. | - |
2/38c | Right to pass and repass with or without plant and vehicles and including access to highways. | - |
Land Plans – Sheet 3 | ||
3/1b | Installation, maintenance and use of pipes and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 1, 22, 24, 38, 39 |
3/3b | Installation, maintenance and use of pipes and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 1, 24, 38, 39 |
3/7b | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 39 |
3/7d | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 39 |
3/8b | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 39 |
3/8d | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 39 |
3/10c | Installation, maintenance and use of pipes and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 41, 43 |
3/10e | Installation, maintenance and use of pipes and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 41, 43 |
3/10j | Installation, maintenance and use of ducts, cables and apparatus for utilities and electronic communications operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 43, 44, 45, 47 |
Land Plans – Sheet 4 | ||
4/1b | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 40, 49 |
4/1d | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 50 |
4/1g | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 40, 49, 50 |
4/1h | Installation, maintenance and use of electric lines, cables, equipment and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 40, 50, 51, 52, 53 |
4/1j | Right to pass and repass with or without plant and vehicles and including access to highways. | Work Nos. 50, 51 |
4/1k | Installation, maintenance and use of electric lines, cables, equipment and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 40, 50, 51, 52 |
4/1m | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 40, 52 |
4/2c | Right to pass and repass with or without plant and vehicles and including access to highways. | Work Nos. 40, 50 |
4/2g | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 50 |
4/3d | Right to pass and repass with or without plant and vehicles and including access to highways. | Work Nos. 54, 55 |
Land Plans – Sheet 5 | ||
5/1a | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 54, 55, 56 |
5/1c | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 54, 55, 56 |
5/2b | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 57, 58, 59 |
5/2e | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 57, 58 |
5/2g | Installation, maintenance and use of pipes and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 57, 60, 61 |
5/2i | Installation, maintenance and use of pipes and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 57, 60, 61, 64 |
Land Plans – Sheet 6 | ||
6/2b | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 68, 69 |
6/2d | Installation, maintenance and use of electronic communications cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 65, 68 |
6/2f | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work No. 67 |
6/2h | Installation, maintenance and use of electric lines, cables, equipment and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 57, 62, 63, 64, 67, 68 |
6/2j | Installation, maintenance and use of pipes and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 57, 60, 61a, 64 |
6/2n | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 57, 64, 67, 68 |
6/3b | Installation, maintenance and use of electric lines, cables, equipment and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 57, 62, 63, 64, 65, 67, 68 |
6/6a | Installation, maintenance and use of electronic communications cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 65, 68 |
6/8b | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 68, 69 |
Land Plans – Sheet 7 | ||
Land Plans – Sheet 8 | ||
8/5g | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 80a |
Land Plans – Sheet 9 | ||
9/6c | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 57, 80a, 80b, 82 |
9/6f | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 57 |
9/7f | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 57, 80b, 82 |
9/7j | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 57 |
9/8a | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 57 |
Land Plans – Sheet 10 | ||
Land Plans – Sheet 11 | ||
11/4e | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 57, 89 |
Land Plans – Sheet 12 | ||
12/6a | Right to pass and repass with or without plant and vehicles and including access to highways. | Work Nos. 57, 91, 98a |
12/6d | Right to pass and repass with or without plant and vehicles and including access to highways. | Work Nos. 91, 92, 93, 98a |
12/6e | Right to pass and repass with or without plant and vehicles and including access to highways. | Work No. 91, 92, 98a |
12/6h | Installation, maintenance and use of ducts, cables and apparatus for utilities and electronic communications operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 95, 96, 97, 98a |
12/6k | Installation, maintenance and use of ducts, cables and apparatus for utilities and electronic communications operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 95, 96, 97, 98a |
Land Plans – Sheet 13 | ||
13/2c | Installation, maintenance and use of electric lines, cables, equipment and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 91, 98b, 98c, 99, 100, 103 |
13/3a | Installation, maintenance and use of ducts, cables and apparatus for utilities and electronic communications operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 95, 96, 98a, 98d |
13/4b | Installation, maintenance and use of apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 95, 98a, 98b |
13/4c | Right to pass and repass with or without plant and vehicles and including access to highways. | Work Nos. 92, 98a, 98b |
13/4e | Installation, maintenance and use of apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 91, 95 |
13/5a | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 99 |
13/6b | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 98c, 99 |
13/14c | Installation, maintenance and use of electric lines, cables, equipment and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 91, 98b, 99, 100 |
13/14d | Installation, maintenance and use of electric lines, cables, equipment and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 98e, 99, 100 |
13/14f | Installation, maintenance and use of apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 91, 98b, 98c, 99, 103 |
13/14g | Installation, maintenance and use of apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 91, 98b, 103 |
Land Plans – Sheet 14 | ||
14/2c | Installation, maintenance and use of apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 103, 104, 109b |
14/2d | Installation, maintenance and use of apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 103, 104 |
14/5c | Installation, maintenance and use of electric lines, cables, equipment and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 103, 104, 107, 110 |
14/6b | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 109a, 110 |
14/8d | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 91, 110 |
14/8e | Installation, maintenance and use of apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 103, 109d |
14/11c | Installation, maintenance and use of electric lines, cables, equipment and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 103, 104, 107, 110 |
14/11d | Installation, maintenance and use of apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 103, 104 |
14/15c | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 109b, 110 |
14/17a | Installation, maintenance and use of apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 103, 104 |
14/19a | Installation, maintenance and use of electric lines, cables, equipment and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 103, 104, 107, 110 |
14/19b | Installation, maintenance and use of electric lines, cables, equipment and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 103, 104, 107, 110 |
14/20a | Installation, maintenance and use of electric lines, cables, equipment and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 103, 104, 107, 110 |
14/21b | Installation, maintenance and use of apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 91, 103 |
14/21e | Installation, maintenance and use of electric lines, cables, equipment and apparatus. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 109a, 110 |
Land Plans – Sheet 15 | ||
15/3b | Installation, maintenance and use of electric lines, cables, equipment and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 103, 104, 107, 110 |
15/4a | Installation, maintenance and use of electric lines, cables, equipment and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 103, 104, 107, 110 |
15/5a | Installation, maintenance and use of electric lines, cables, equipment and apparatus for utilities operators. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | Work Nos. 103, 104, 107, 110 |