SCHEDULES

Article 37

SCHEDULE 7LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

(1)

Location

(2)

Plot Reference Number shown on land plans

(3)

Purpose for which temporary possession may be taken

(4)

Relevant part of the authorised development

Land Plans – Sheet 1
Roxton1/1lRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned A1 carriageway.Work No. 21
Roxton1/2aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Bedford Road.Work No. 4
Roxton1/2bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Bedford Road.Work No. 4
Roxton1/2cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Bedford Road.Work No. 4
Roxton1/7fRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the combined Kelpie Marina access track and realigned A1 carriageway.Work Nos. 7, 21
Wyboston, Chawston and Colesden1/8aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Roxton Road access track.Work No. 3
Wyboston, Chawston and Colesden1/8fRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned dual carriageway west of the Black Cat junction.Work No. 1
Roxton1/8gRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned dual carriageway west of the Black Cat junction and westbound on slip road from the junction.Work No. 1
Roxton1/8hRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Bedford Road.Work No. 4
Wyboston, Chawston and Colesden1/8mRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Roxton Road access track.Work No. 3
Roxton1/8oRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Bedford Road.Work No. 4
Roxton1/8qRequired to provide a temporary construction area. Required to provide temporary storage, laydown areas, access and working space for this construction area, the construction of the realigned Greenacres access track, the construction of the flood compensation area south east of the new Black Cat junction circulatory, and the quarry restoration works.Work Nos. 16, 17
Roxton1/9eRequired to provide a temporary construction area. Required to provide temporary storage, laydown areas, access and working space for this construction area, the construction of the realigned Greenacres access track.Work Nos. 15, 17
Wyboston, Chawston and Colesden1/10cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Roxton Road access track.Work No. 3
Roxton1/10gRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the combined Kelpie Marina access track and A1 northbound offslip road to the new Black Cat junction circulatory.Work Nos. 7, 21
Roxton1/10iRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the combined Kelpie Marina access track and bridleway, as well as the flood compensation area to the west of the track.Works No. 7,11
Roxton1/10lRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the combined Kelpie Marina access track and bridleway.Work No. 7
Roxton1/16eRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of a turn around area along School Lane.-
Roxton1/16hRequired to provide a temporary construction compound, including temporary storage, laydown areas, access and working space.-
Wyboston, Chawston and Colesden1/19aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Roxton Road.Work No. 3
Wyboston, Chawston and Colesden1/20aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Roxton Road.Work No. 3
Roxton1/20bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Bedford Road.Work No. 4
Roxton1/20cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Bedford Road.Work No. 4
Roxton1/21aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Roxton Road and required to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road Link (south).Work Nos. 3, 18
Roxton1/21cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the combined Kelpie Marina access track and bridleway, as well as the flood compensation area to the west of the track.Work Nos. 7, 11
Wyboston, Chawston and Colesden1/23bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road Link (south).Work No. 18
Roxton1/23gRequired to provide temporary soil storage, as well as temporary storage, laydown areas, access and working space to facilitate the construction of the attenuation basin and realigned Bedford Road, Black Cat junction including slip roads.Work Nos. 4, 5
Roxton1/23iRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the combined Kelpie Marina access track and the flood compensation area to the west of the track.Work Nos. 7, 11
Roxton1/23mRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned A1 carriageway, the realigned access track over Rockham Ditch at Greenacres, and flood compensation area south east of the new Black Cat junction circulatory.Work Nos. 15, 21, 24
Wyboston, Chawston and Colesden1/32cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road Link (south).Work No. 18
Wyboston, Chawston and Colesden1/33aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road Link (south).Work No. 18
Wyboston, Chawston and Colesden1/36bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the A1 Services link road and a construction area north east of the new Black Cat junction circulatory.Work Nos. 22, 23
Wyboston, Chawston and Colesden1/37bRequired to provide a temporary construction area, including temporary storage, laydown areas, access and working space.Work No. 23
Roxton1/40aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the combined Kelpie Marina access track and realigned Bedford Road.Work Nos. 4, 7a
Roxton1/42cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Greenacres access track and A1 southbound on slip road from the new Black Cat junction circulatory.Work Nos. 15, 21
Roxton1/43dRequired to provide a temporary construction area, including temporary storage, laydown areas, access and working space for this construction area, the construction of the realigned Greenacres access track, the construction of the realigned access track over Rockham Ditch, and the construction of the flood compensation area south east of the new Black Cat junction circulatory.Work Nos. 15, 17, 24
Roxton1/46bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the combined Kelpie Marina access track and bridleway.Work No. 7
Roxton1/47aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the combined Kelpie Marina access track and bridleway.Work No. 7
Roxton1/49aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned A1 carriageway.Work No. 21
Roxton1/49cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the combined Kelpie Marina access track and realigned A1 carriageway.Work Nos. 7, 21
Tempsford1/51aRequired to provide temporary storage, laydown areas, access and working space to facilitate improvements to the A1.Work No. 21
Land Plans – Sheet 2
Wyboston, Chawston and Colesden2/1aRequired to facilitate improvements to the A1 and to provide temporary access and working space.Work No. 21
Wyboston, Chawston and Colesden2/1bRequired to facilitate improvements to the A1 and to provide temporary access and working space.Work No. 21
Wyboston, Chawston and Colesden2/1cRequired to provide temporary storage, laydown areas, access and working space to facilitate improvements to the A1 and the construction of the access road to The Lane.Work Nos. 21, 36
Wyboston, Chawston and Colesden2/1dRequired to provide temporary storage, laydown areas, access and working space to facilitate improvements to the A1, the construction of the access road to The Lane, and the diversion of underground utilities.Work Nos. 20, 21, 28, 36
Wyboston, Chawston and Colesden2/1eRequired to provide temporary storage, laydown areas, access and working space to facilitate improvements to the A1, the construction of the access road to The Lane, and the diversion of underground utilities.Work Nos. 20, 21, 28, 36
Wyboston, Chawston and Colesden2/1fRequired to facilitate improvements to the A1 and to provide temporary access and working space.Work No. 21
Wyboston, Chawston and Colesden2/1gRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned A1 carriageway.Work No. 21
Wyboston, Chawston and Colesden2/1kRequired to facilitate the construction of a highway gantry in the A1 southbound verge and to provide temporary access and working space.-
Wyboston, Chawston and Colesden2/2aRequired to provide temporary access and working space to facilitate the construction of the realigned A1 carriageway and the diversion of an underground water utility.Work Nos. 21, 31
Wyboston, Chawston and Colesden2/3aRequired to facilitate improvements to the A1 and to provide temporary access and working space.Work No. 21
Wyboston, Chawston and Colesden2/3bRequired to facilitate improvements to the A1 and to provide temporary access and working space.Work No. 21
Wyboston, Chawston and Colesden2/3dRequired to facilitate improvements to the A1 and the construction of the realigned A1 carriageway and to provide temporary access and working space.Work No. 21
Wyboston, Chawston and Colesden2/3eRequired to facilitate improvements to the A1 and the construction of the realigned A1 carriageway and to provide temporary access and working space for these works, as well as to provide temporary access and working space to facilitate the construction of the A1 Services link road and the access road to The Lane.Work Nos. 21, 22, 36
Wyboston, Chawston and Colesden2/4aRequired to facilitate improvements to the A1 and to provide temporary access and working space.Work No. 21
Wyboston, Chawston and Colesden2/4bRequired to facilitate the construction of the realigned sections of The Lane, and to provide temporary access and working space for these works, as well as to provide temporary access and working space to facilitate the construction of Roxton Road link (north).Work Nos. 29, 36
Wyboston, Chawston and Colesden2/4cRequired to provide temporary access and working space to facilitate the construction of the realigned A1 carriageway and the Nagshead Lane link.Work Nos. 29, 31, 32
Wyboston, Chawston and Colesden2/4dRequired to provide temporary access and working space to facilitate the construction of Roxton Road link (north and south).Work Nos. 18, 19, 20, 28, 29
Wyboston, Chawston and Colesden2/5aRequired to facilitate improvements to the A1 and to provide temporary access and working space.Work No. 21
Wyboston, Chawston and Colesden2/6aRequired to facilitate improvements to the A1 and to provide temporary access and working space.Work No. 21
Wyboston, Chawston and Colesden2/7aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (north) and the flood compensation area east of the link.Work No. 29, 34
Wyboston, Chawston and Colesden2/8bRequired to facilitate the decommissioning and removal of diverted utilities.Work No. 32
Wyboston, Chawston and Colesden2/8cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (north).Work Nos. 29, 32
Wyboston, Chawston and Colesden2/8fRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (north).Work Nos. 29, 35
Wyboston, Chawston and Colesden2/9aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (north) and the flood compensation area east of the link.Work Nos. 29, 34
Wyboston, Chawston and Colesden2/10aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the flood compensation area east of Roxton Road link (north).Work No. 29, 34
Wyboston, Chawston and Colesden2/11aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (north), the flood compensation area east of the link, and the attenuation basin east of both Roxton Road link (north) and the Nagshead Lane link.Work Nos. 29, 33, 34
Wyboston, Chawston and Colesden2/11bRequired to facilitate the decommissioning and removal of diverted utilities.Work No. 32
Wyboston, Chawston and Colesden2/13aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the access road to The Lane.Work No. 36
Wyboston, Chawston and Colesden2/14aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the access road to The Lane.Work No. 36
Wyboston, Chawston and Colesden2/15bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the access road to The Lane.Work No. 36
Wyboston, Chawston and Colesden2/16aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the access road to The Lane.Work No. 36
Wyboston, Chawston and Colesden2/18cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (north).Work No. 29
Wyboston, Chawston and Colesden2/19aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (north), the Nagshead Lane link and the attenuation basin east of these links.Work Nos. 29, 33
Wyboston, Chawston and Colesden2/19cRequired to facilitate the decommissioning and removal of diverted utilities.Work No. 32
Wyboston, Chawston and Colesden2/19dRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned A1 carriageway and the Nagshead Lane link.Work Nos. 21, 29
Wyboston, Chawston and Colesden2/21aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (north).Work No. 29
Wyboston, Chawston and Colesden2/22aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (north).Work No. 29
Wyboston, Chawston and Colesden2/23aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned A1 carriageway.Work No. 21
Wyboston, Chawston and Colesden2/24bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (south).Work No. 18
Wyboston, Chawston and Colesden2/24cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the flood compensation area west of Roxton Road link (south).Work No. 26
Wyboston, Chawston and Colesden2/25aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (south).Work No. 18
Wyboston, Chawston and Colesden2/26aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (south) and the associated culvert across South Brook.Work No. 18, 25
Land Plans – Sheet 3
Wyboston, Chawston and Colesden3/1aRequired to provide a temporary construction area, including temporary storage, laydown areas, access and working space.Work No. 23
Wyboston, Chawston and Colesden3/1cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the River Great Ouse viaduct and the access track extending from the A1 Services link road.Work Nos. 22, 39
Wyboston, Chawston and Colesden3/2aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the River Great Ouse viaduct and the access track extending from the A1 Services link road.Work Nos. 22, 39
Roxton3/3cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the flood compensation area south east of the new Black Cat junction circulatory.Work No. 24
Roxton3/7aRequired to provide temporary access and working space to facilitate the construction of the River Great Ouse viaduct.Work No. 39
Tempsford3/8aRequired to provide temporary access and working space to facilitate the construction of the River Great Ouse viaduct.Work No. 39
Wyboston, Chawston and Colesden3/9aRequired to provide temporary access and working space to facilitate the construction of the River Great Ouse viaduct.Work No. 39
Tempsford3/10aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Barford Road.Work No. 43
Tempsford3/10bRequired to provide temporary access and working space to facilitate the construction of the realigned Barford Road.Work No. 43
Tempsford3/10fRequired to provide temporary access and working space to facilitate the construction of the River Great Ouse viaduct.Work No. 39
Tempsford3/10gRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Barford Road.Work No. 43
Tempsford3/10hRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Barford Road.Work Nos. 43, 44
Tempsford3/10iRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Barford Road.Work Nos. 43, 44, 45
Tempsford3/10lRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Barford Road, the attenuation basin and flood compensation areas east of this (north of the dual carriageway), and the dual carriageway.Work Nos. 40, 43, 46, 48
Tempsford3/10mRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Barford Road, the flood compensation area east of this (south of the dual carriageway), and the dual carriageway.Work Nos. 40, 43, 48
Tempsford3/10nRequired to provide temporary storage of soil and other materials, laydown areas, access and working space to facilitate the construction of the dual carriageway.Work No. 40
Tempsford3/11bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Barford Road.Work No. 43
Little Barford3/12aRequired to provide temporary access and working space to facilitate the construction of the realigned Barford Road.Work No. 43
Tempsford3/13aRequired to provide temporary access and working space to facilitate the construction of the realigned Barford Road.Work No. 43
Tempsford3/13bRequired to provide temporary access and working space to facilitate the construction of the realigned Barford Road.Work Nos. 43, 44
Tempsford3/17aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Barford Road, and the attenuation basin east of this.Work Nos. 43, 44, 46
Land Plans – Sheet 4
Tempsford4/1aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway.Work No. 40
Tempsford4/1cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the East Coast Main Line bridge.Work Nos. 40, 50
Tempsford4/1fRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway.Work No. 40
Tempsford4/1lRequired to provide temporary storage of soil and other materials, laydown areas, access and working space to facilitate the construction of the dual carriageway.Work No. 40
Tempsford4/1oRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the attenuation basin east of the East Coast Main Line bridge, as well as the access tracks from the dual carriageway.Work Nos. 40, 50, 53
Tempsford4/1pRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the attenuation basin east of the East Coast Main Line bridge, as well as the access tracks from the dual carriageway.Work Nos. 40, 50, 53
Tempsford4/1qRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the attenuation basin east of the East Coast Main Line bridge, as well as the access tracks from the dual carriageway.Work Nos. 40, 50, 53
Tempsford4/1rRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway, the attenuation basin east of the East Coast Main Line bridge, as well as the access tracks from the dual carriageway.Work Nos. 40, 50, 53, 54
Tempsford4/1sRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the access track from the dual carriageway.Work No. 50
Tempsford4/2aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the East Coast Main Line bridge.Work No. 50
Tempsford4/2bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the East Coast Main Line bridge.Work No. 50
Tempsford4/2dRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the East Coast Main Line bridge.Work No. 50
Tempsford4/2eRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the East Coast Main Line bridge.Work No. 50
Tempsford4/2fRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the East Coast Main Line bridge.Work No. 50
Tempsford4/2hRequired to provide temporary access and working space to facilitate the construction of the East Coast Main Line bridge.Work No. 50
Tempsford4/2iRequired to provide temporary access and working space to facilitate the construction of the East Coast Main Line bridge.Work No. 50
Little Barford4/3aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway.Work Nos. 40, 54
Little Barford4/3cRequired to provide earthworks temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and Top Farm access track.Work Nos. 54, 55
Land Plans – Sheet 5
Little Barford5/1bRequired to provide a temporary construction area, including temporary storage, laydown areas, access and working space to facilitate the construction of the Top Farm accommodate bridge and access tracks, as well as the dual carriageway.Work Nos. 54, 55
Little Barford5/1dRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Top Farm accommodate bridge and access tracks, as well as the dual carriageway.Work Nos. 54, 55, 56
Little Barford5/1eRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Top Farm accommodate bridge and access tracks, as well as the dual carriageway.Work Nos. 54, 55, 56
Little Barford5/1gRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway.Work Nos. 54, 57
Abbotsley; Little Barford5/2aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway, the flood compensation area between this and Potton Road, and a field access track from Potton Road.Work Nos. 54, 57, 59
Abbotsley5/2cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the realigned Potton Road, as well as the flood compensation area between the dual carriageway and Potton Road.Work Nos. 57, 59, 64
Abbotsley; Little Barford5/2dRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway.Work No. 57
Abbotsley5/2hRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway.Work No. 57
Abbotsley5/2jRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Potton Road.Work No. 64
Abbotsley5/3aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of a field access track from Potton Road.-
Abbotsley5/3bRequired to facilitate the diversion of an underground water utility and to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Potton Road.Work Nos. 60, 64
Abbotsley5/3cRequired to facilitate the diversion of underground power and electronic communications utilities, as well as the construction of the realigned Potton Road.Work Nos. 63, 64, 65, 66
Abbotsley5/5aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Potton Road and the diversion of underground utilities.Work Nos. 60, 61, 64
Abbotsley5/6aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Potton Road and the diversion of underground utilities.Work Nos. 60, 61, 64
Abbotsley5/8bRequired to facilitate the diversion of an underground power utility, as well as the construction of the realigned Potton Road.Work Nos. 63, 64
Abbotsley5/8cRequired to facilitate the diversion of underground power and electronic communications utilities, as well as the construction of the realigned Potton Road.Work Nos. 63, 64, 65
Land Plans – Sheet 6
Abbotsley; St Neots6/1aRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Abbotsley6/2aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046.Work No. 68
Abbotsley6/2cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046.Work No. 68
Abbotsley6/2eRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046 including the tie-in to the existing Potton Road being stopped up and retained as a private access.Work Nos. 64, 68
Part of the agricultural field and shrubbery; north of Potton Road and east of Rectory Farm Cottages, Eynesbury Hardwicke, St Neots.6/2gRequired to provide temporary storage of soil and other materials, laydown areas, access and working space to facilitate the construction of the dual carriageway and the realigned B1046.Work Nos. 57, 68
Part of the agricultural field, trees, shrubbery and ditches; east of Rectory Farm Cottage and south of Potton Road, Eynesbury Hardwicke, St Neots.6/2iRequired to provide temporary storage of soil and other materials, laydown areas, access and working space to facilitate the construction of the dual carriageway and the realigned Potton Road.Work Nos. 57, 64
Part of the agricultural field; north of Parkers Farmhouse and east of Potton Road, St Neots.6/2mRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Potton Road.Work Nos. 64, 66
Part of the agricultural field; north-east of Eynesbury Warehousing and south of St Neots Road, B1046, Eynesbury Hardwicke, St Neots.6/2oRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046.Work No. 68
Abbotsley6/3aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046.Work No. 68
Abbotsley6/8aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046.Work No. 68
Abbotsley6/8cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the realigned B1046, as well as the underpass and culvert at Hen Brook, including the stopping up of a section of Footpath 1/20 between the existing A428 and the new dual carriageway.Work Nos. 57, 68, 72
Abbotsley6/8fRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway, the realigned B1046, an attenuation basin and the flood compensation area north of the B1046, and the access track between the B1046 and the attenuation basins.Work Nos. 57, 68, 70, 71
Abbotsley6/8gRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway, the realigned B1046, the flood compensation area and an attenuation basin north of the B1046, and the access track between the B1046 and the attenuation basins, as well as the underpass and culvert at Hen Brook.Work Nos. 57, 68, 71, 72, 73
Abbotsley6/9aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the access track between the B1046 and attenuation basins.Work Nos. 57, 68
Land Plans – Sheet 7
Little Barford; St Neots; Wyboston, Chawston and Colesden7/1aRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Little Barford; St Neots7/1bRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Abbotsley; St Neots7/1cRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Abbotsley; St Neots7/1dRequired to provide temporary storage, laydown areas, access and working space to facilitate the introduction of the construction area north-west of the existing A428, between the B1046 and Hen Brook, as well as to facilitate the de-trunking of the existing A428 carriageway.Work No. 74
St Neots7/2aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046.Work No. 68
St Neots7/2bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046.Work No. 68
Abbotsley; St Neots7/2cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046.Work No. 68
Abbotsley7/2dRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046.Work No. 68
Little Barford7/3aRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Wyboston, Chawston and Colesden7/4aRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Abbotsley; Little Barford; St Neots7/4bRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Wyboston, Chawston and Colesden7/4cRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Wyboston, Chawston and Colesden7/4dRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
St Neots7/5aRequired to provide temporary storage, laydown areas, access and working space to facilitate the introduction of the construction area north-west of the existing A428, between the B1046 and Hen Brook.Work Nos. 68, 74
Abbotsley7/5bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046.Work No. 68
St Neots7/6aRequired to facilitate the introduction of the temporary construction area north-west of the existing A428, between the B1046 and Hen Brook.Work No. 74
Land Plans – Sheet 8
Abbotsley; St Neots8/1aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction and the de-trunking of the existing A428 carriageway.Work No. 80a
St Neots8/2aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction and the de-trunking of the existing A428 carriageway.Work No. 80a
Abbotsley8/3aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction and the de-trunking of the existing A428 carriageway.Work No. 80a
Abbotsley8/4aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway.Work No. 57
Abbotsley8/5aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway, footbridge and realigned footpath.Work Nos. 57, 77
Abbotsley8/5cRequired to facilitate the construction of the dual carriageway, Cambridge Road Junction, footbridge and realigned footpath, including the regrading of earthworks as well as temporary storage, laydown areas, access and working space.Work Nos. 57, 77, 80a
Abbotsley8/5eRequired to facilitate the construction of the dual carriageway, footbridge and realigned footpath, including the regrading of earthworks as well as temporary storage, laydown areas, access and working space.Work Nos. 57, 77
St Neots8/6aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction.Work No. 80a
St Neots8/6bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction and the de-trunking of the existing A428 carriageway.Work No. 80a
St Neots8/7aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction and the de-trunking of the existing A428 carriageway.Work No. 80a
Abbotsley8/8aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction and the de-trunking of the existing A428 carriageway.Work No. 80a
Land Plans – Sheet 9
St Neots9/1bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction.Work No. 80a
Abbotsley9/2bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction, accommodation bridge and realigned access track, as well as the de-trunking of the existing A428 carriageway.Work Nos. 80c, 85
St Neots9/3aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction.Work No. 80a
St Neots9/4aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction.Work No. 80a
St Neots9/5aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction.Work No. 80a
Abbotsley9/6aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction.Work No. 80a
Abbotsley9/6dRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and Cambridge Road Junction.Work Nos. 57, 80b
Abbotsley9/6gRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the accommodation bridge and realigned access track.Work No. 85
Abbotsley9/7aRequired to provide a temporary construction area, including temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction and the attenuation basin west of the junction.Work Nos. 79, 80a
Abbotsley9/7cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and Cambridge Road Junction.Work Nos. 57, 80b, 80c
Abbotsley9/7dRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and Cambridge Road Junction.Work Nos. 57, 80c
Abbotsley9/7hRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway.Work No. 57
Abbotsley9/7iRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction.Work No. 80c
Abbotsley9/7kRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway, attenuation basin east of the Cambridge Road Junction, and the access track to this basin from the realigned existing A428.Work Nos. 57, 80c, 84
Abbotsley9/7lRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway, accommodation bridge and realigned access track.Work Nos. 57, 85
Abbotsley9/8bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the accommodation bridge and realigned access track.Work No. 85
Abbotsley9/9cRequired to provide temporary storage, laydown areas, access and working space to facilitate works to existing Bridleway 1/18.Work No. 85
Abbotsley9/10aRequired to provide temporary storage, laydown areas, access and working space to facilitate works to existing Bridleway 1/18.Work No. 85
Abbotsley9/11bRequired to provide temporary storage, laydown areas, access and working space to facilitate works to existing Bridleway 1/18, as well as the de-trunking of the existing A428 carriageway.Work No. 85
Land Plans – Sheet 10
Abbotlsey; Croxton10/1aRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Abbotsley10/2aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the accommodation bridge and realigned access track.Work No. 85
Abbotsley10/4aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the accommodation bridge and realigned access track.Work No. 85
Abbotsley10/4bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway, the accommodation bridge and realigned access track, the culverts at Fox Brook and Gallow Brook, and the attenuation basin west of Toseland Road, as well as the de-trunking of the existing A428.Work Nos. 57, 85, 86, 87, 88
Abbotsley; Toseland10/4cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway, the accommodation bridge and realigned access track, the culverts at Fox Brook and Gallow Brook, and the realigned Toseland Road.Work Nos. 57, 85, 86, 87, 89
Abbotsley10/5bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the accommodation bridge and realigned access track.Work No. 85
Abbotsley10/5dRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the accommodation bridge and realigned access track.Work No. 85
Abbotsley10/5eRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the accommodation bridge and realigned access track.Work No. 85
Land Plans – Sheet 11
Croxton11/1aRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Croxton11/1bRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Croxton11/1cRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Croxton11/1dRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Croxton11/3aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Toseland Road and the de-trunking of the existing A428 carriageway.Work No. 89
Toseland11/4aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the realigned Toseland Road.Work Nos. 57, 89
Croxton11/4cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Toseland Road and the attenuation basin west of Toseland Road.Work Nos. 88, 89
Croxton; Yelling11/4fRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the realigned Toseland Road.Work Nos. 57, 89
Yelling11/4gRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway.Work No. 57
Land Plans – Sheet 12
Croxton12/1aRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Croxton12/1bRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Croxton12/1cRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Eltisley12/1dRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Eltisley12/1eRequired to provide temporary storage, laydown areas, access and working space to facilitate the diversion of underground utilities and the de-trunking of the existing A428 carriageway.Work No. 95
Croxton12/2aRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Croxton12/2bRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Eltisley12/2cRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Yelling12/3aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway.Work No. 57
Yelling12/3cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway.Work No. 57
Yelling12/4bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway.Work No. 57
Yelling12/5aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway.Work No. 57
Yelling; Eltisley12/6bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the access track west of Eltisley link.Work Nos. 57, 91, 98a
Yelling; Eltisley12/6cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the Combined bridleway and watercourse underpass to the north of Eltisley.Work Nos. 57, 91, 92
Eltisley12/6gRequired to facilitate the construction of the Combined bridleway and watercourse underpass to the north of Eltisley, also providing temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the Eltisley link.Work Nos. 91, 92, 98a, 98b
Eltisley12/6iRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Eltisley link.Work No. 98a
Land Plans – Sheet 13
Eltisley13/2eRequired to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway.-
Eltisley13/4fRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway.Work No. 91
Eltisley13/4gRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Eltisley link.Work No. 98c
Eltisley13/5bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Eltisley link and the diversion of an underground utility.Work Nos. 98c, 99
Eltisley13/6aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Eltisley link and the diversion of an underground utility.Work Nos. 98c, 99
Eltisley13/7aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Eltisley link.Work No. 98c
Eltisley13/10fRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Caxton Gibbet junction.Work No. 109a
Eltisley13/11aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the Eltisley link.Work Nos. 91, 98e
Eltisley13/12bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Eltisley link.Work No. 98e
Eltisley13/14aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Eltisley link.Work Nos. 98b, 98d, 98e
Eltisley13/14eRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the Eltisley link.Work Nos. 91, 98e
Eltisley13/14iRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the access track from the Eltisley South roundabout.Work Nos. 91, 98b
Land Plans – Sheet 14
Caxton14/2bRequired to provide temporary access and working space to facilitate the construction of the Caxton Gibbet junction and the diversion of underground utilities.Work Nos. 103, 104, 109b
Cambourne; Caxton14/4cRequired to provide temporary access and working space to facilitate the construction of the Caxton Gibbet junction and the diversion of underground utilities.Work Nos. 103, 104, 109b
Eltisley; Papworth Everard14/6aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Caxton Gibbet junction.Work No. 109a
Eltisley; Papworth Everard14/6cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Caxton Gibbet junction.Work No. 109a
Caxton14/8aRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the westbound onslip road from the Caxton Gibbet junction.Work Nos. 91, 103
Caxton14/8bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the westbound onslip road from the Caxton Gibbet junction.Work No. 91
Caxton14/8fRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the westbound onslip road from the Caxton Gibbet junction, and the Caxton Gibbet junction.Work Nos. 91, 109b, 109d
Papworth Everard14/10bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Caxton Gibbet junction and the diversion of underground utilities.Work Nos. 103, 104, 109b, 109d
Papworth Everard14/11aRequired to provide temporary access and working space to facilitate a construction area north-west of the Caxton Gibbet junction, the construction of the Caxton Gibbet junction, and the diversion of underground utilities.Work Nos. 104a, 106, 107, 109b
Cambourne; Caxton14/11bRequired to provide temporary access and working space to facilitate the construction of the Caxton Gibbet junction and the diversion of underground utilities.Work Nos. 103, 104, 109b
Papworth Everard14/13aRequired to provide temporary access and working space to facilitate the construction of the Caxton Gibbet junction.Work No. 109b
Elsworth; Papworth Everard14/15bRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Caxton Gibbet junction.Work No. 109b
Elsworth14/16bRequired to provide temporary storage, laydown areas, access and working space to facilitate a construction area north-east of the Caxton Gibbet junction, the construction of the Caxton Gibbet junction, and the diversion of overhead utilities.Work Nos. 109c, 110, 111
Eltisley14/21cRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the westbound onslip road from the Caxton Gibbet junction.Work Nos. 91, 103
Eltisley; Papworth Everard14/21dRequired to provide temporary storage, laydown areas, access and working space to facilitate a construction area north-west of the Caxton Gibbet junction, and the construction of the Caxton Gibbet junction.Work Nos. 106, 109a
Eltisley; Papworth Everard14/21fRequired to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Caxton Gibbet junction.Work No. 109a
Land Plans – Sheet 15
Elsworth15/2aRequired to provide temporary access and working space to facilitate the construction of the shared access and bridleway from the Caxton Gibbet junction north roundabout, and the diversion of overhead utilities.Work Nos. 109c, 110
Elsworth15/4bRequired to provide temporary access and working space to facilitate a construction area north-east of the Caxton Gibbet junction, the construction of the shared access and bridleway from the Caxton Gibbet junction north roundabout, and the diversion of overhead utilities.Work Nos. 109c, 110, 111
Elsworth15/6bRequired to provide temporary storage, laydown areas, access and working space to facilitate a construction area north-east of the Caxton Gibbet junction, the construction of the Caxton Gibbet junction, and the diversion of overhead utilities.Work Nos. 109c, 110, 111
Land Plans – Sheet 16
Great Barford16/1aRequired to provide access and working space to facilitate a temporary vehicle recovery area off the A421 eastbound carriageway.-
Tempsford16/1bRequired to facilitate the construction of a highway gantry in the A1 northbound verge and to provide temporary access and working space.-
Wyboston, Chawston and Colesden16/1cRequired to facilitate the construction of a highway gantry in the A421 eastbound verge and to provide temporary access and working space.-
Hail Weston16/2aRequired to provide access and working space to facilitate a temporary vehicle recovery area off Kimbolton Road/B645.-
Tempsford16/3aRequired to provide temporary access and working space to facilitate the construction of a highway gantry in the A1 northbound verge.-
Tempsford16/3bRequired to provide temporary access and working space to facilitate the construction of a highway gantry in the A1 northbound verge.-
Hail Weston16/5aRequired to provide a temporary vehicle recovery area off Kimbolton Road/B645.-
Hail Weston16/6aRequired to provide access and working space to facilitate a temporary vehicle recovery area off Kimbolton Road/B645.-
Great Barford16/7aRequired to provide a temporary vehicle recovery area off the A421 eastbound carriageway.-
Tempsford16/8aRequired to provide access and working space to facilitate a temporary vehicle recovery area off Tempsford Road.-
Tempsford16/9aRequired to provide a temporary vehicle recovery area off Tempsford Road.-
Tempsford16/10aRequired to provide temporary access and working space to facilitate the construction of a highway gantry in the A1 northbound verge.-