Sch. 9 para. 28 in force at 10.3.2023, see art. 1

http://www.legislation.gov.uk/uksi/2023/218/schedule/9/paragraph/28/2023-03-10The A47 Wansford to Sutton Development Consent Order 2023enINFRASTRUCTURE PLANNINGStatute Law Database2024-04-02Expert Participation2023-03-10This Order authorises National Highways Limited to improve the A47 between Wansford and Sutton in Norfolk and carry out all associated works.SCHEDULESSCHEDULE 9PROTECTIVE PROVISIONSPART 3FOR THE PROTECTION OF ANGLIAN WATERExpenses and costs28.(1)

Subject to the following provisions of this paragraph, the undertaker must repay to Anglian Water all expenses reasonably incurred by Anglian Water in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in this Part of the Schedule.

(2)

There must be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part of this Schedule that value being calculated after removal.

(3)

If in accordance with the provisions of this Part of this Schedule—

(a)

apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or

(b)

apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 47 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to Anglian Water by virtue of sub-paragraph (1) must be reduced by the amount of that excess.

(4)

For the purposes of sub-paragraph (3)

(a)

an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and

(b)

where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.

(5)

An amount which apart from this sub-paragraph would be payable to Anglian Water in respect of works by virtue of sub-paragraph (1), if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on Anglian Water any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, is to be reduced by the amount which represents that benefit.

This XML file does not appear to have any style information associated with it. The document tree is shown below.
<akomaNtoso xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xsi:schemaLocation="http://docs.oasis-open.org/legaldocml/ns/akn/3.0 http://docs.oasis-open.org/legaldocml/akn-core/v1.0/cos01/part2-specs/schemas/akomantoso30.xsd">
<act name="uksi">
<meta>
<identification source="#">
<FRBRWork>
<FRBRthis value="http://www.legislation.gov.uk/id/uksi/2023/218"/>
<FRBRuri value="http://www.legislation.gov.uk/id/uksi/2023/218"/>
<FRBRdate date="2023-02-17" name="made"/>
<FRBRauthor href="http://www.legislation.gov.uk/id/government/uk"/>
<FRBRcountry value="GB-UKM"/>
<FRBRsubtype value="order"/>
<FRBRnumber value="218"/>
<FRBRname value="S.I. 2023/218"/>
<FRBRprescriptive value="true"/>
</FRBRWork>
<FRBRExpression>
<FRBRthis value="http://www.legislation.gov.uk/uksi/2023/218/2023-03-10"/>
<FRBRuri value="http://www.legislation.gov.uk/uksi/2023/218/2023-03-10"/>
<FRBRdate date="2023-03-10" name="validFrom"/>
<FRBRauthor href="#"/>
<FRBRlanguage language="eng"/>
</FRBRExpression>
<FRBRManifestation>
<FRBRthis value="http://www.legislation.gov.uk/uksi/2023/218/2023-03-10/data.akn"/>
<FRBRuri value="http://www.legislation.gov.uk/uksi/2023/218/2023-03-10/data.akn"/>
<FRBRdate date="2024-11-25Z" name="transform"/>
<FRBRauthor href="http://www.legislation.gov.uk"/>
<FRBRformat value="application/akn+xml"/>
</FRBRManifestation>
</identification>
<lifecycle source="#">
<eventRef refersTo="#made" date="2023-02-17" eId="date-made" source="#"/>
<eventRef refersTo="#coming-into-force" date="2023-03-10" eId="date-cif-1" source="#"/>
<eventRef date="2023-03-10" eId="date-2023-03-10" source="#"/>
<eventRef date="2023-06-17" eId="date-2023-06-17" source="#"/>
</lifecycle>
<analysis source="#">
<restrictions source="#">
<restriction refersTo="#extent-e+w+s" type="jurisdiction"/>
<restriction href="#schedules" refersTo="#extent-e+w+s" type="jurisdiction"/>
<restriction href="#schedule-9" refersTo="#extent-e+w+s" type="jurisdiction"/>
<restriction href="#schedule-9-part-3" refersTo="#extent-e+w+s" type="jurisdiction"/>
<restriction href="#schedule-9-paragraph-28" refersTo="#extent-e+w+s" type="jurisdiction"/>
<restriction refersTo="#period-from-2023-03-10-to-2023-06-17" type="jurisdiction"/>
<restriction href="#schedules" refersTo="#period-from-2023-03-10-to-2023-06-17" type="jurisdiction"/>
<restriction href="#schedule-9" refersTo="#period-from-2023-03-10-to-2023-06-17" type="jurisdiction"/>
<restriction href="#schedule-9-part-3" refersTo="#period-from-2023-03-10-to-2023-06-17" type="jurisdiction"/>
<restriction href="#schedule-9-paragraph-28" refersTo="#period-from-2023-03-10-to-2023-06-17" type="jurisdiction"/>
</restrictions>
<otherAnalysis source="">
<uk:commentary href="#schedule-9-paragraph-28" refersTo="#key-6a3a2eda610643c5a52a27ca4174d5b1"/>
</otherAnalysis>
</analysis>
<temporalData source="#">
<temporalGroup eId="period-from-2023-03-10-to-2023-06-17">
<timeInterval start="#date-2023-03-10" end="#date-2023-06-17" refersTo="#"/>
</temporalGroup>
</temporalData>
<references source="#">
<TLCEvent eId="made" href="" showAs="Made"/>
<TLCEvent eId="cif" href="" showAs="ComingIntoForce"/>
<TLCLocation eId="extent-e+w+s" href="" showAs="E+W+S"/>
</references>
<notes source="#">
<note ukl:Name="Commentary" ukl:Type="I" class="commentary I" eId="key-6a3a2eda610643c5a52a27ca4174d5b1" marker="I1">
<p>
Sch. 9 para. 28 in force at 10.3.2023, see
<ref eId="n987c9cf38ca0ff90" class="subref operative" href="http://www.legislation.gov.uk/id/uksi/2023/218/article/1">art. 1</ref>
</p>
</note>
</notes>
<proprietary xmlns:ukm="http://www.legislation.gov.uk/namespaces/metadata" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:dct="http://purl.org/dc/terms/" source="#">
<dc:identifier>http://www.legislation.gov.uk/uksi/2023/218/schedule/9/paragraph/28/2023-03-10</dc:identifier>
<dc:title>The A47 Wansford to Sutton Development Consent Order 2023</dc:title>
<dc:language>en</dc:language>
<dc:subject scheme="SIheading">INFRASTRUCTURE PLANNING</dc:subject>
<dc:publisher>Statute Law Database</dc:publisher>
<dc:modified>2024-04-02</dc:modified>
<dc:contributor>Expert Participation</dc:contributor>
<dct:valid>2023-03-10</dct:valid>
<dc:description>This Order authorises National Highways Limited to improve the A47 between Wansford and Sutton in Norfolk and carry out all associated works.</dc:description>
<ukm:SecondaryMetadata>
<ukm:DocumentClassification>
<ukm:DocumentCategory Value="secondary"/>
<ukm:DocumentMainType Value="UnitedKingdomStatutoryInstrument"/>
<ukm:DocumentStatus Value="revised"/>
<ukm:DocumentMinorType Value="order"/>
</ukm:DocumentClassification>
<ukm:Year Value="2023"/>
<ukm:Number Value="218"/>
<ukm:Made Date="2023-02-17"/>
<ukm:ComingIntoForce>
<ukm:DateTime Date="2023-03-10"/>
</ukm:ComingIntoForce>
<ukm:ISBN Value="9780348245295"/>
</ukm:SecondaryMetadata>
<ukm:Alternatives>
<ukm:Alternative URI="http://www.legislation.gov.uk/uksi/2023/218/pdfs/uksi_20230218_en.pdf" Date="2023-03-03" Size="714879"/>
</ukm:Alternatives>
<ukm:Statistics>
<ukm:TotalParagraphs Value="231"/>
<ukm:BodyParagraphs Value="52"/>
<ukm:ScheduleParagraphs Value="179"/>
<ukm:AttachmentParagraphs Value="0"/>
<ukm:TotalImages Value="0"/>
</ukm:Statistics>
</proprietary>
</meta>
<body>
<hcontainer name="schedules" eId="schedules">
<heading>SCHEDULES</heading>
<hcontainer name="schedule" eId="schedule-9">
<num>SCHEDULE 9</num>
<heading>PROTECTIVE PROVISIONS</heading>
<part eId="schedule-9-part-3">
<num>PART 3</num>
<heading>FOR THE PROTECTION OF ANGLIAN WATER</heading>
<hcontainer name="crossheading" class="schGroup7" eId="d25e85">
<heading>Expenses and costs</heading>
<paragraph eId="schedule-9-paragraph-28" uk:target="true" class="schProv1">
<num>28.</num>
<subparagraph eId="schedule-9-paragraph-28-1">
<num>(1)</num>
<content>
<p>Subject to the following provisions of this paragraph, the undertaker must repay to Anglian Water all expenses reasonably incurred by Anglian Water in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in this Part of the Schedule.</p>
</content>
</subparagraph>
<subparagraph eId="schedule-9-paragraph-28-2">
<num>(2)</num>
<content>
<p>
There must be deducted from any sum payable under sub-paragraph
<ref href="#schedule-9-paragraph-28-1">(1)</ref>
the value of any apparatus removed under the provisions of this Part of this Schedule that value being calculated after removal.
</p>
</content>
</subparagraph>
<subparagraph eId="schedule-9-paragraph-28-3">
<num>(3)</num>
<intro>
<p>If in accordance with the provisions of this Part of this Schedule—</p>
</intro>
<level class="para1" eId="schedule-9-paragraph-28-3-a">
<num>(a)</num>
<content>
<p>apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or</p>
</content>
</level>
<level class="para1" eId="schedule-9-paragraph-28-3-b">
<num>(b)</num>
<content>
<p>apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,</p>
</content>
</level>
<wrapUp>
<p>
and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article
<ref href="#">47</ref>
(arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to Anglian Water by virtue of sub-paragraph
<ref href="#schedule-9-paragraph-28-1">(1)</ref>
must be reduced by the amount of that excess.
</p>
</wrapUp>
</subparagraph>
<subparagraph eId="schedule-9-paragraph-28-4">
<num>(4)</num>
<intro>
<p>
For the purposes of sub-paragraph
<ref href="#schedule-9-paragraph-28-3">(3)</ref>
</p>
</intro>
<level class="para1" eId="schedule-9-paragraph-28-4-a">
<num>(a)</num>
<content>
<p>an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and</p>
</content>
</level>
<level class="para1" eId="schedule-9-paragraph-28-4-b">
<num>(b)</num>
<content>
<p>where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.</p>
</content>
</level>
</subparagraph>
<subparagraph eId="schedule-9-paragraph-28-5">
<num>(5)</num>
<content>
<p>
An amount which apart from this sub-paragraph would be payable to Anglian Water in respect of works by virtue of sub-paragraph
<ref href="#schedule-9-paragraph-28-1">(1)</ref>
, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on Anglian Water any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, is to be reduced by the amount which represents that benefit.
</p>
</content>
</subparagraph>
</paragraph>
</hcontainer>
</part>
</hcontainer>
</hcontainer>
</body>
</act>
</akomaNtoso>