Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
3.—(1) The total number of offshore electrical installations and offshore accommodation platforms must not exceed ten, consisting of a combination of no more than—
(a)six small offshore transformer substations;
(b)three large offshore transformer substations;
(c)three offshore HVAC booster stations;
(d)six small offshore HVDC converter stations;
(e)three large offshore HVDC converter stations; and
(f)one offshore accommodation platform.
(2) The dimensions of any small offshore transformer substation (including auxiliary structures, such as a helipad, crane, lightning protection, but excluding masts, radar and antennae) forming part of the authorised project must not exceed—
(a)100 metres in height when measured from LAT;
(b)90 metres in length; and
(c)90 metres in width.
(3) The dimensions of any large offshore transformer substation (including auxiliary structures, such as a helipad, crane, lightning protection, but excluding masts, radar and antennae) forming part of the authorised project must not exceed—
(a)100 metres in height when measured from LAT;
(b)180 metres in length; and
(c)90 metres in width.
(4) The dimensions of any offshore HVAC booster station (including auxiliary structures, such as a helipad, crane, lightning protection, but excluding masts, radar and antennae) forming part of the authorised project must not exceed—
(a)100 metres in height when measured from LAT;
(b)90 metres in length; and
(c)90 metres in width.
(5) The dimensions of any small offshore HVDC converter substation (including auxiliary structures, such as a helipad, crane, lightning protection, but excluding masts, radar and antennae) forming part of the authorised project must not exceed—
(a)90 metres in height when measured from LAT;
(b)100 metres in length; and
(c)100 metres in width.
(6) The dimensions of any large offshore HVDC converter substation (including auxiliary structures, such as a helipad, crane, lightning protection, but excluding masts, radar and antennae) forming part of the authorised project must not exceed—
(a)100 metres in height when measured from LAT;
(b)180 metres in length; and
(c)90 metres in width.
(7) The dimensions of any offshore accommodation platform forming part of the authorised project must not exceed—
(a)64 metres in height when measured from LAT;
(b)60 metres in length; and
(c)60 metres in width.
(8) Offshore accommodation platform foundation structures forming part of the authorised project must be one of either monopile foundations, mono suction bucket foundations, gravity base structures, jacket foundations or box–type gravity base structures.
(9) Offshore electrical installation foundation structures forming part of the authorised project must be one of the following foundation options—
(a)for small offshore transformer substations and offshore HVAC booster stations either monopile foundations, mono suction bucket foundations, jacket foundations, gravity base structures or box–type gravity base structures; and
(b)for large offshore transformer substations and offshore HVDC converter stations either monopile foundations, mono suction bucket foundations, jacket foundations, box–type gravity base structures, gravity base structures, pontoon gravity base type 1 structures, or pontoon gravity base type 2 structures.
(10) No offshore electrical installation or offshore accommodation platform—
(a)jacket foundation employing pin piles forming part of the authorised project may—
(i)have a pin pile diameter of greater than four metres; and
(ii)employ more than 16 pin piles per jacket foundation; and
(b)monopile foundation forming part of the authorised project may have a diameter greater than 15 metres.
(11) The total seabed footprint area for offshore accommodation platform foundations must not exceed—
(a)5,625 square metres excluding scour protection; and
(b)30,625 square metres including scour protection.
(12) The total seabed footprint area for offshore electrical installation foundations must not exceed—
(a)101,250 square metres excluding scour protection; and
(b)371,250 square metres including scour protection.
(13) The total number of gravity base structures may not exceed ten for offshore electrical installations and offshore accommodation platforms.
(14) The offshore electrical installations and offshore accommodation platform comprised in the authorised project must be constructed in accordance with parameters set out in the pro–rata annex.
(15) A bridge link forming part of the authorised development must be installed at a minimum height of 20 metres when measured from LAT.
Commencement Information
I1Sch. 1 Pt. 3 para. 3 in force at 3.8.2023, see art. 1
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: