The Hornsea Four Offshore Wind Farm Order 2023

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about opening options

Opening OptionsExpand opening options

Changes over time for: Paragraph 2

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Hornsea Four Offshore Wind Farm Order 2023, Paragraph 2. Help about Changes to Legislation

Details of licensed marine activitiesE+W+S

2.  Subject to the licence conditions at Part 2, this licence authorises the undertaker (and any agent or contractor acting on their behalf) to carry out the following licensable marine activities under section 66(1) (licensable marine activities) of the 2009 Act—

(a)the deposit at sea within the Order limits seaward of MHWS of the substances and articles specified in paragraph 4 below and within—

(i)the array area disposal site, when combined with the disposal authorised by the deemed marine licence granted under Schedule 11 of the Order, of up to 7,211,601 cubic metres (being a maximum, not an approximate upper figure) of inert material of natural origin produced during construction drilling or seabed preparation for foundation works and cable installation preparation and excavation of horizontal directional drilling pits works within the parts of Work No. 2 that lie within the array area; and

(ii)the cable corridor disposal site of up to 4,105,735 cubic metres (being a maximum, not an approximate upper figure) of inert material of natural origin produced during construction drilling or seabed preparation for foundation works and cable installation preparation and excavation of horizontal directional drilling pits works within Work Nos. 2 (which lie within the cable corridor), 3, 4 and 5;

(b)the construction of works in or over the sea or on or under the sea bed;

(c)dredging for the purposes of seabed preparation for foundation works and/or electrical circuit works;

(d)boulder clearance works by displacement ploughing or subsea grab technique or any other equivalent method;

(e)the removal of sediment samples for the purposes of informing environmental monitoring under this licence during pre-construction, construction and operation;

(f)removal of static fishing equipment; and

(g)site preparation works.

Commencement Information

I1Sch. 12 Pt. 1 para. 2 in force at 3.8.2023, see art. 1

Back to top

Options/Help

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?