Limits of deviation

7.—(1) The following provisions of this article have effect subject to the requirement that the undertaker must, save for any works or operations authorised under articles 14 (protective works to buildings) or 15 (authority to survey and investigate land), construct the authorised development within the Order limits.

(2) In constructing and maintaining the non-linear works comprised in the authorised development, the undertaker may deviate laterally within the limits of deviation for those works shown on the works plans, to the extent the undertaker considers necessary.

(3) In constructing or maintaining the linear works comprised in the authorised development the undertaker may deviate laterally from the lines or situations shown on the works plans to the extent of the Order limits, so far as the undertaker considers to be necessary, save that—

(a)in constructing or maintaining any linear work, other than Work No. 1F, in deviating laterally from the centrelines shown on the works plans, the situation of the centreline may be varied up to a maximum of 3 metres either side of the centreline of that work as shown on the works plans;

(b)in constructing or maintaining Work No. 1F, the undertaker may deviate laterally within the Order limits so far as the undertaker considers to be necessary, and the lateral limits of deviation provided for in sub-paragraph (a) does not apply; and

(c)in constructing or maintaining the authorised development comprised in Work No. 6(a), the undertaker may deviate laterally only within the bounds of the carriageway and verges of the existing A303 (to be de-trunked under this Order).

(4) Except in the case of Work No. 1F, in constructing or maintaining the authorised development, the undertaker may deviate vertically from the levels shown on the engineering section drawings (plan and profiles) and the engineering section drawings (cross sections)—

(a)to any extent upwards as the undertaker considers to be necessary but not exceeding 0.5 metres, or, in relation to the parts of the authorised development referred to in column (1) of the table below, not exceeding the permitted limit for each such part, set out in the corresponding entry in column (2) of that table; and

(b)subject to paragraph (5), to any extent downwards as the undertaker considers to be necessary, but not exceeding 1 metre, or, in relation to the parts of the authorised development referred to in column (1) of the table below, not exceeding the permitted limit for each such part, set out in the corresponding entry in column (3) of that table.

(1)

Part of authorised development

(2)

Upwards vertical limit of deviation

(3)

Downwards vertical limit of deviation

Works Nos. 1A and 21 metre1 metre
Work Nos. 1B and 1H0.5 metres0.5 metres
Work Nos. 1C, 3A, 3B, 3C, 4, 5 and 70.5 metres1 metre
(1) Work No. 1D, save for(1) 0.5 metres(1) 3 metres
(2) the level of the ground above the structure comprised in Work No. 1D(i), which is to be reinstated at existing ground level subject to the limits in columns (2) and (3) which are to apply by reference to existing ground level(2) 0.25 metres(2) 0.25 metres
(1) Work No. 1E, save for(1) 0.5 metres(1) 4 metres
(2) the level of the ground above the structures comprised in Work No. 1E(i), which is to be reinstated at existing ground level subject to the limits in columns (2) and (3) which are to apply by reference to existing ground level(2) 0.25 metres(2) 0.25 metres
(1) Work No. 1G save for(1) 0.5 metres(1) 3 metres
(2) the level of the ground above the structures comprised in Work No. 1G(i) and (ii), which is to be reinstated at existing ground level subject to the limits in columns (2) and (3) which are to apply by reference to existing ground level(2) 0.25 metres(2) 0.25 metres
Work No. 60.25 metres0.25 metres
Work No. 83 metres3 metres, but not lower than the existing ground levels

(5) In constructing and maintaining the authorised development comprised in Work No. 1F the undertaker may deviate vertically—

(a)upwards, to the maximum upper limit of deviation for the crown of the tunnel, as shown on the tunnel limits of deviation plan;

(b)upwards, to the maximum upper limit of deviation for the finished road level shown on the tunnel limits of deviation plan; and

(c)downwards, to a depth not exceeding the level at 36 metres above ordnance datum.

(6) The maximum vertical limits of deviation referred to in paragraphs (4) and (5) do not apply where it is demonstrated by the undertaker to the Secretary of State’s satisfaction and the Secretary of State certifies accordingly, following consultation with the planning authority and any other person the Secretary of State considers appropriate having regard to the proposed deviation in question and the statutory roles and responsibilities of such person, that a deviation in excess of these limits would not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement.

(7) Without limitation on the scope of paragraphs (2) to (6), in constructing or maintaining the authorised development the undertaker may—

(a)subject to sub-paragraph (b), deviate by up to 3 metres from the points of commencement and termination of any linear works;

(b)in relation to the points of commencement and termination of the parts of the authorised development referred to in column (1) of the table below, the undertaker may deviate from those points of commencement and termination so far as the undertaker considers it necessary, in a generally westerly direction by the corresponding limit set out in column (2) or in a generally easterly direction by the corresponding limit set out in column (3); and

(c)in constructing or maintaining Work Nos. 1E, 1F and 1G, deviate from the design of any tunnel or tunnel structure and vary the number of tunnel cross-passages shown on the engineering section drawings (plan and profiles) and the engineering section drawings (cross sections) to the extent that to do so would not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement.

(1)

Part of the authorised development

(2)

Deviation permitted in a generally westerly direction

(3)

Deviation permitted in a generally easterly direction

Point of commencement of Work No. 1E and point of termination of Work No. 1D200 metres1 metre
Point of commencement of Work No. 1F and point of termination of Work No. 1E200 metres1 metre
Point of commencement of Work No. 1G and point of termination of Work No. 1F1 metre30 metres
Point of commencement of Work No. 1H and point of termination of Work No. 1G1 metre30 metres

(8) In this article, references to—

(a)“linear works” are references to any works shown on the works plans by way of a centreline; and

(b)“non-linear works” are references to any other works shown on the works plans.

(9) Despite the provisions of article 2(4), the distances and lengths referred to in this article are not to be taken as being approximate.

Back to top

Options/Help

Print Options

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources