The Building (Higher-Risk Buildings Procedures) (England) Regulations 2023

Information to be provided where work is scheme workE+W

This section has no associated Explanatory Memorandum

39.—(1) Where work to existing HRB consists only of scheme work and Part B of Schedule 1 to the 2010 Regulations imposes a requirement in relation to the work, the certifier must give the fire safety information to the client and the responsible person no later than—

(a)where the building to which the building work relates is not occupied during the work, the date of completion of the work or the date of occupation of the building, whichever is the earlier;

(b)in any other case, the date of completion of the work.

(2) The responsible person must give the certifier a notice acknowledging receipt of the fire safety information and confirming the information provided is sufficient to enable them to understand, operate and maintain the building (and the fire safety systems in it) after the building work in question and give a copy of that notice at the same time to the client.

(3) The certifier must notify the client—

(a)confirming that they have given fire safety information to the responsible person, and

(b)stating that they have received a notice from the responsible person pursuant to paragraph (2) or where they have not received the notice, stating the steps taken to obtain the notice from the responsible person and the dates they were taken.

(4) The notification under paragraph (3) must be given no later than 7 days after the date referred to in paragraph (1).

(5) Within 30 days of receiving the notification under paragraph (4) the client must notify the regulator confirming receipt of the notification from the certifier.

(6) Where work to existing HRB consists only of scheme work and paragraph F1(1) of Schedule 1 to the 2010 Regulations imposes a requirement in relation to the work, the certifier must, not later than five days after the work has been completed, give sufficient information to the client and the responsible person about the building’s ventilation system and its maintenance requirements so that the ventilation system can be operated in such a manner as to provide adequate means of ventilation.

(7) Where work to existing HRB consists only of scheme work and paragraph L1 of Schedule 1 to the 2010 Regulations imposes a requirement in relation to the work, the certifier must, not later than five days after the work has been completed, provide to the client and the responsible person sufficient information about the building, the fixed building services and their maintenance requirements so that the building can be operated in such a manner as to use no more fuel and power than is reasonable in the circumstances.

(8) Where work to existing HRB consists only of scheme work and paragraph L2 of Schedule 1 to the 2010 Regulations applies in relation to the work, the certifier must, not later than five days after the work has been completed, provide to the client and the responsible person sufficient information about the system for on-site electricity generation in respect of its operation and maintenance requirements so that the system may be operated and maintained in such a manner as to produce the maximum electricity that is reasonable in the circumstances and delivers this electricity to the optimal place for use.

(9) In this regulation—

certifier” means—

(a)

where the work is described in column 1 of the Table in Schedule 3 to the 2010 Regulations and the work is to be carried out by a person described in the corresponding entry in column 2 of that Table, the person carrying out the work;

(b)

where the work is described in column 1 of the Table in Schedule 3A to the 2010 Regulations and the work is to be inspected by a person described in the corresponding entry in column 2 of that Table who has been appointed by the person intending to carry out the work, the person inspecting the work;

fire safety information” means information relating to—

(a)

the design and construction of the building and the services, fittings and equipment provided in or in connection with the building;

(b)

the design of the material change of use and building work to implement it;

(c)

the composition of materials used,

which will assist the responsible person to operate and maintain the building with reasonable safety;

responsible person” has the meaning given in article 3 of the Regulatory Reform (Fire Safety) Order 2005.

Commencement Information

I1Reg. 39 in force at 1.10.2023, see reg. 1(1)