Modifications etc. (not altering text)
C1Pts. 2-6 excluded (temp.) (6.4.2024) by The Building (Registered Building Control Approvers etc.) (England) Regulations 2024 (S.I. 2024/110), regs. 1(3), 46(2)(c)
8.—(1) The regulator may, by notice in writing, require a client—
(a)to notify the regulator, within a specified period, when a specified point of the HRB work or a specified point of the stage of HRB work has been reached;
(b)not to cover up specified work for a specified period.
(2) In this regulation “specified” means specified by the regulator in the notice referred to in paragraph (1).