The A66 Northern Trans-Pennine Development Consent Order 2024

Detailed design

54.—(1) Subject to article 7 (limits of deviation) and the provisions of this article, the authorised development must be designed in detail and carried out so that it is substantially in accordance with—

(a)the design principles;

(b)the works plans;

(c)the engineering section drawings: plan and profiles and the engineering section drawings: cross sections; and

(d)the matters approved by the Secretary of State under paragraphs (5), (8) and (9).

(2) The undertaker in relation to the detailed design of the authorised development must have regard to the amended duty to further the purpose of conserving and enhancing the protected landscapes set out in—

(a)section 11A of the National Parks and Access to the Countryside Act 1949(1); and

(b)section 85 of the Countryside and Rights of Way Act 2008(2).

(3) The Secretary of State may approve a detailed design that departs from paragraph (1), following consultation with the relevant planning authority, the Environment Agency, Historic England and Natural England (on matters related to their statutory functions), provided that the Secretary of State is satisfied that any amendments to the design principles, the works plans, the engineering section drawings: plan and profiles and the engineering section drawings: cross sections would not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement.

(4) Where amended details are approved by the Secretary of State under paragraph (3), those details are deemed to be substituted for the corresponding design principles, works plans, engineering section drawings: plan and profiles and engineering section drawings: cross sections as the case may be and the undertaker must make those amended details available in electronic form for inspection by members of the public.

(5) No part of the authorised development comprised in scheme 06 is to commence until a detailed floodplain compensation scheme for that part has been submitted to and approved in writing by the Secretary of State, following consultation with the relevant planning authority and the Environment Agency.

(6) The floodplain compensation scheme prepared under paragraph (5) must provide suitable flood storage such that flood risk during construction and operation of scheme 06 to any land or property situated downstream is not increased as a result of flood waters that would be displaced by the Appleby to Brough scheme when compared to the baseline scenario as reported in the baseline hydraulic modelling agreed with the Environment Agency (in document HE565627-JBAU-XX-06-RP-HM-S3-P05-0001-Scheme6_Modelling_Report accepted on 15 May 2023) and arise from events with a magnitude up to and including the 1% annual exceedance probability, plus allowance for the climate change in line with the Environment Agency guidance applicable on the date when this Order was made.

(7) The floodplain compensation scheme approved under paragraph (5) must be implemented and maintained for the lifetime of scheme 06 unless otherwise agreed with the Environment Agency.

(8) The undertaker must not commence construction of any of the viaducts comprised in Work Nos. 0405-1A(xii), 0405-2A(x), 06-1C(vi) and 06-1C(x) until details of the design and external appearance of the viaducts have been submitted to approved in writing by the Secretary of State following consultation with the relevant planning authority.

(9) The undertaker must not commence the construction of Work No. 06-7 until detailed designs for these Works including the locations of any draining ponds and access roads and the associated ancillary works have been submitted to and approved in writing by the Secretary of State following consultation with the relevant planning authority.

(10) In this article, “commence” has the same meaning as in article 53(16).