The A66 Northern Trans-Pennine Development Consent Order 2024

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)
 Help about opening options

Opening OptionsExpand opening options

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

THE NEW AND IMPROVED A66 TRUNK ROAD

In the administrative area of Westmorland and Furness Council
A 2.8 km length of new and improved A66 trunk road

1.  A 2.8 km length of new and improved highway to be classified as part of the A66, commencing from a point 150 metres to the south-west of the existing access to the Livestock Market, and following the existing alignment of the A66 for a distance of 2.4 km to a point 668 metres to the north-east of the new Kemplay Bank Roundabout, and comprising—

(a)a 390 metre length of improved highway commencing from a point 265 metres west of Skirsgill Business Park and following the existing alignment of the A66 for a distance of 390 metres, to a point on the existing A66 carriageway 100 metres south-east of the Livestock Market;

(b)a 600 metre length of improved circulatory carriageway of the M6 J40 roundabout;

(c)a 1.8 km length of improved highway commencing from a point 115 metres south of the North Lakes Hotel & Spa and following the alignment of the existing A66 in a generally westwards direction, passing beneath the bridges at the new Kemplay Bank Roundabout and following the existing alignment of the A66 in a north-easterly direction, then joining the existing A66 carriageway at a point 200 metres north-east of the Police Station,

identified by a red line on the classification of roads plan for scheme 0102.

Back to top

Options/Help

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?