SCHEDULE 7CLASSIFICATION OF ROADS, ETC.
PART 2SCHEME 03 – PENRITH TO TEMPLE SOWERBY
NEW JUNCTION AT CENTER PARCS
In the administrative area of Westmorland and Furness Council
A 116 metre length of new road (Northbound Approach)
18.
A 116 metre length of new road to be classified as part of the A66, commencing from a point 472 metres to the south-west of Lane End continuing in a generally northerly direction to its junction with the westbound carriageway of the new A66 at a point 436 metres to the east of Lane End, identified by a red line on the classification of roads plan for scheme 03.
A 493 metre length of new road (Connector Loop)
19.
A 493 metre length of new road to be classified as part of the A66, commencing from its junction with the new A66 on the eastbound carriageway at a point 469 metres to the west of Lane End, continuing northwards for a distance of 157 metres, before turning eastwards and then southwards and passing under the new A66 at a point 361 metres to the south-west of Lane End, continuing generally south-eastwards to its junction with the new northbound approach at a point 472 metres to the south-east of Lane End, identified by a red line on the classification of roads plan for scheme 03.