SCHEDULE 1E+W+SAUTHORISED DEVELOPMENT

Commencement Information

I1Sch. 1 in force at 5.4.2024, see art. 1

OSBALDWICK SUBSTATIONE+W+S

Work No. 1 – Osbaldwick Substation and YR overhead electric lineE+W+S

In the city of York

Works at the existing Osbaldwick Substation to reconfigure the existing layout and YR overhead electric line shown on section A, sheet 1 of the works plan, comprising—

(a)the installation of conductors, insulators and fittings from YR001A to YR001C;

(b)the dismantling and removal of existing conductors, insulators and fittings on and between YR001A and YR001-T;

(c)the installation of gantry YR001C, support structures, switchgear and equipment, underground cables and cable terminations; and

(d)the dismantling and removal of gantry YR001-T, associated support structures, switchgear and equipment.