OSBALDWICK SUBSTATION
Work No. 1 – Osbaldwick Substation and YR overhead electric line
In the city of York
Works at the existing Osbaldwick Substation to reconfigure the existing layout and YR overhead electric line shown on section A, sheet 1 of the works plan, comprising—
(a)the installation of conductors, insulators and fittings from YR001A to YR001C;
(b)the dismantling and removal of existing conductors, insulators and fittings on and between YR001A and YR001-T;
(c)the installation of gantry YR001C, support structures, switchgear and equipment, underground cables and cable terminations; and
(d)the dismantling and removal of gantry YR001-T, associated support structures, switchgear and equipment.