The A12 Chelmsford to A120 Widening Development Consent Order 2024

Permanent Works

Work No. 1 – As shown on sheets 1 and 2 of the permanent works plans improvement works to junction 19 (J19) of the A12, including—

(a)works to widen the carriageway of the existing A12 south and north of the existing J19, of 1618 metres in length including works to tie in to the existing A12;

(b)the widening of Boreham Bridge, alterations to Generals Lane Roundabout and Generals Farm roundabout;

(c)the construction of the J19 slip roads (northbound on-slip, southbound off-slip and southbound merge). The southbound off-slip includes alterations to the throughabout at Generals Farm Roundabout, which consists of widening the existing throughabout, through the centre of the existing roundabout;

(d)the widening of B1137 Main Road of 236 metres in length northeast of the Generals Farm roundabout and the provision of means of access to adjoining land;

(e)realigning the A138 south of the Generals Lane roundabout;

(f)alteration to the Generals Lane roundabout link to the A12 northbound on-slip;

(g)alterations to the realigned Beaulieu Park Radial Distributor Road to the A12 northbound;

(h)alterations to the segregated left turn from Boreham Bridge to the A130;

(i)alterations to the A130 to tie in with the Generals Lane Roundabout;

(j)widening the Realigned Beaulieu Park Radial Distributor Road to tie in with the Generals Lane Roundabout;

(k)alterations to the A138 link to the A12 northbound on-slip; and

(l)construction of segregated left turn lane from the realigned Beaulieu Park Radial Distributor Road to Boreham Bridge.