(1) Component / Building / Area | (2) Work No. | (3) Maximum number | (4) Maximum length (m) | (5) Maximum width (m) | (6) Maximum height (m AGL) | (7) Maximum height (m AOD) |
---|---|---|---|---|---|---|
(1) Component to be located at elevation (i.e. located within the duct). Height stated is the maximum height component could be AGL. | ||||||
(2) Buildings / Structures may be coupled together. Total building volume will however not exceed volume required for maximum number of buildings. Maximum height stated is for all configurations. Switchrooms may also be doubled stacked. | ||||||
(3) The Rich Solvent / Lean Solvent Heat Exchangers would be located at elevation on the Main Process and Service Rack. | ||||||
Gas / Gas Heat Exchanger(1) | 1D(v)(aa) | 2 | 25 | 25 | 45 | 51.1 |
Quench Column | 1D(i)(aa) | 1 | 50 | 30 | 40 | 46.1 |
Absorber Column | 1D(i)(bb) | 1 | 50 | 30 | 95 | 101.1 |
Regenerator | 1D(iii)(aa) | 2 | 15 | 15 | 70 | 76.1 |
Carbon Dioxide Gas Compressor Building | 1E(i) | 4 | 45 | 40 | 30 | 36.1 |
Carbon Dioxide Main Vent Stacks | 1E(iii) | 1 | 10 | 10 | 30 | 36.1 |
Main Process & Service Rack(2)(3) | 1D(iii) | 1 | 150 | 20 | 25 | 31.1 |
(1) Component / Building / Area | (2) Work No. | (3) Maximum number | (4) Maximum length (m) | (5) Maximum width (m) | (6) Maximum height (m AGL) | (7) Maximum height (m AOD) |
---|---|---|---|---|---|---|
(1) Component to be located at elevation (i.e. located within the duct). Height stated is the maximum height component could be AGL. | ||||||
(2) Building / Structures may be coupled together. Total building volume will however not exceed volume required for maximum number of buildings. Maximum height stated is for all configurations. Switchrooms may also be double stacked. | ||||||
(3) The Rich Solvent / Lean Solvent Heat Exchangers would be located at elevation on the Main Process and Service Rack. | ||||||
Gas / Gas Heat Exchanger(1) | 1D(vi)(aa) | 2 | 25 | 25 | 45 | 51.1 |
Quench Column | 1D(ii)(aa) | 1 | 50 | 30 | 40 | 46.1 |
Absorber Column | 1D(ii)(bb) | 1 | 50 | 30 | 95 | 101.1 |
Regenerator | 1D(iv)(aa) | 2 | 15 | 15 | 70 | 76.1 |
Carbon Dioxide Gas Compressor Building | 1E(ii) | 4 | 45 | 40 | 30 | 36.1 |
Carbon Dioxide Main Vent Stacks | 1E(iv) | 1 | 10 | 10 | 30 | 36.1 |
Main Process & Service Rack(2)(3) | 1D(iv) | 1 | 150 | 20 | 25 | 31.1 |
(1) Component / Building / Area | (2) Work No. | (3) Maximum number | (4) Maximum length (m) | (5) Maximum width (m) | (6) Maximum height (m AGL) | (7) Maximum height (m AOD) |
---|---|---|---|---|---|---|
(1) Buildings / Structures may be coupled together. Total building volume will however not exceed volume required for maximum number of buildings. Maximum height stated is for all configurations. Switchrooms may also be double stacked. | ||||||
Carbon Capture Wastewater Treatment Plant Area | 1D(viii)(a) | 1 | 80 | 70 | 40 | 46.1 |
Solvent Storage and Make-up System Compound | 1D(vii) | 4 | 55 | 45 | 25 | 31.1 |
Combined Power Turbine Building(1) | 1C(iii)(bb) | 2 | 50 | 45 | 35 | 41.1 |
Pressure Reducing De-Superheating Station Building (1) | 1C(iii)(dd) | 2 | 15 | 45 | 15 | 21.1 |
Steam Pipe Bridge Connection (Connection with existing Drax Power Station Infrastructure) | 1C(iii)(ee) | 1 | 30 | 10 | 65 | 71.1 |
Steam Pipe Bridge | 1C(iii)(ee) | 1 | 300 | 20 | 25 | 31.1 |
Fire Water Tanks | 1D(viii)(dd) | 4 | 15 | 15 | 15 | 21.1 |
Switchroom Building(1) | 1F | 30 | 30 | 16 | 20 | 26.1 |
Carbon Dioxide Pipe Bridge | 2 | 1 | 500 | 20 | 20 | 26.1 |
Carbon Dioxide Delivery Terminal Compound (onshore carbon pipeline operator) | 2 | 1 | 100 | 100 | 12 | 18.1 |