PART 3DESIGN PARAMETERS ASSOCIATED WITH THE COMMON INFRASTRUCTURE REQUIRED FOR BOTH THE CARBON CAPTURE PLANT FOR UNIT 1 AND THE CARBON CAPTURE PLANT FOR UNIT 2
(1) Component / Building / Area | (2) Work No. | (3) Maximum number | (4) Maximum length (m) | (5) Maximum width (m) | (6) Maximum height (m AGL) | (7) Maximum height (m AOD) |
---|---|---|---|---|---|---|
(1) Buildings / Structures may be coupled together. Total building volume will however not exceed volume required for maximum number of buildings. Maximum height stated is for all configurations. Switchrooms may also be double stacked. | ||||||
Carbon Capture Wastewater Treatment Plant Area | 1D(viii)(a) | 1 | 80 | 70 | 40 | 46.1 |
Solvent Storage and Make-up System Compound | 1D(vii) | 4 | 55 | 45 | 25 | 31.1 |
Combined Power Turbine Building(1) | 1C(iii)(bb) | 2 | 50 | 45 | 35 | 41.1 |
Pressure Reducing De-Superheating Station Building (1) | 1C(iii)(dd) | 2 | 15 | 45 | 15 | 21.1 |
Steam Pipe Bridge Connection (Connection with existing Drax Power Station Infrastructure) | 1C(iii)(ee) | 1 | 30 | 10 | 65 | 71.1 |
Steam Pipe Bridge | 1C(iii)(ee) | 1 | 300 | 20 | 25 | 31.1 |
Fire Water Tanks | 1D(viii)(dd) | 4 | 15 | 15 | 15 | 21.1 |
Switchroom Building(1) | 1F | 30 | 30 | 16 | 20 | 26.1 |
Carbon Dioxide Pipe Bridge | 2 | 1 | 500 | 20 | 20 | 26.1 |
Carbon Dioxide Delivery Terminal Compound (onshore carbon pipeline operator) | 2 | 1 | 100 | 100 | 12 | 18.1 |