There are outstanding changes not yet made by the legislation.gov.uk editorial team to The M3 Junction 9 Development Consent Order 2024. Any changes that have already been made by the team appear in the content and are referenced with annotations.
Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.
Whole provisions yet to be inserted into this Instrument (including any effects on those provisions):
Prospective
Articles 15 and 19
Commencement Information
I1Sch. 3 Pt. 1 in force at 9.10.2024 (as amended by S.I. 2024/1020, Sch.), see art. 1
(1) Area | (2) Length of road |
---|---|
Hampshire County Council (Winchester) | M3 northbound carriageway from a point 540 metres from the proposed M3 Junction 9 gyratory southern bridge to the proposed A34 northbound diverge between point 30 and 23 of sheets 6, 7 and 8 of the classification of road plans, comprising 878 metres. |
Hampshire County Council (Winchester) | M3 northbound carriageway from the proposed A34 northbound diverge to a point 221 metres from the proposed M3 Junction 9 gyratory northern bridge between points 23 and 31 on sheets 4, 5, and 6 of the classification of road plans, comprising 1186 metres. |
Hampshire County Council (Winchester) | M3 northbound offslip to the proposed M3 Junction 9 gyratory between point 32 and 27 on sheets 8 and 7 of the classification of road plans, comprising 468 metres. |
Hampshire County Council (Winchester) | M3 northbound onslip from the proposed A33 / M3 onslip roundabout to the M3 northbound carriageway to a point 790 metres from the proposed M3 Junction 9 gyratory northern bridge between points 14 and 33 on sheets 5 and 4 of the classification of road plans, comprising 468 metres. |
Hampshire County Council (Winchester) | M3 southbound carriageway from a point 1066 metres from the proposed M3 Junction 9 gyratory northern bridge to a point 790 metres from the proposed M3 Junction 9 gyratory southern bridge between point 34 and 35 on sheets 5 6, 7 and 8 of the classification of road plans, comprising 1984 metres. |
Hampshire County Council (Winchester) | M3 southbound merge from a point 182 metres from the proposed M3 underpass southern portal to a point 782 metres from the proposed M3 Junction 9 gyratory southern bridge between point 18 and 36 on sheets 6, 7 and 8 of the classification of road plans, comprising 1311 metres. |
Hampshire County Council (Winchester) | M3 southbound onslip from the proposed M3 Junction 9 gyratory to a point 48 metres from the proposed M3 Junction 9 gyratory southern bridge between point 37 and 38 on sheets 7 and 8 of the classification of road plans, comprising 797 metres. |
Hampshire County Council (Winchester) | M3 southbound offslip from a point 1059 metres from the proposed M3 Junction 9 gyratory northern bridge to a point 394 metres from the proposed M3 Junction 9 gyratory northern bridge between point 39 and 21 on sheets 5 and 6 of the classification of road plans, comprising 694 metres. |
Commencement Information
I2Sch. 3 Pt. 2 in force at 9.10.2024 (as amended by S.I. 2024/1020, Sch.), see art. 1
(1) Area | (2) Length of road |
---|---|
Hampshire County Council (Winchester) | A33 southbound from the proposed A33 / M3 northbound onslip roundabout to the proposed National Highways depot roundabout between point 5 and 6 on sheets 5 and 6 of the classification of road plans, comprising 520 metres. |
Hampshire County Council (Winchester) | A33 southbound from the proposed National Highways depot roundabout to the proposed M3 Junction 9 gyratory between point 7 and 8 on sheets 6 and 7 of the classification of road plans, comprising 227 metres. |
Hampshire County Council (Winchester) | A33 northbound from the proposed National Highways depot roundabout to the proposed M3 Junction 9 gyratory between point 9 and 10 on sheets 7 and 6 of the classification of road plans, comprising 246 metres. |
Hampshire County Council (Winchester) | A33 northbound from the proposed National Highways depot roundabout to the proposed A33 / M3 northbound onslip roundabout between point 11 and 12 on sheets 6 and 5 of the classification of road plans, comprising 524 metres. |
Hampshire County Council (Winchester) | A33 northbound from the proposed A33 / M3 northbound onslip roundabout to the commencement of the proposed M3 northbound onslip motorway between point 13 and 14 on sheets 5 and 6 of the classification of road plans, comprising 8 metres. |
Hampshire County Council (Winchester) | Proposed A33 / M3 northbound onslip roundabout extents as shown at point 15 on sheet 5 of the classification of road plans, comprising 87 metres. |
Hampshire County Council (Winchester) | Proposed National Highways depot roundabout extents as shown at point 16 on sheet 6 of the classification of road plans, comprising 87 metres. |
Hampshire County Council (Winchester) | A34 southbound from a point 659 metres from the proposed M3 underpass northern portal to a point 178 metres from the proposed M3 underpass southern portal between point 17 and 18 on sheets 5 and 6 of the classification of road plans, comprising 890 metres. |
Hampshire County Council (Winchester) | A34 southbound diverge from commencement of diverge to the proposed M3 Junction 9 gyratory between point 19 and 20 on sheets 6 and 7 of the classification of road plans, comprising 588 metres. |
Hampshire County Council (Winchester) | A34 southbound from a point 394 metres from the proposed M3 Junction 9 gyratory to a point 347 metres from the proposed M3 Junction 9 gyratory between point 21 and 22 on sheet 6 of the classification of road plans, comprising 49 metres. |
Hampshire County Council (Winchester) | A34 northbound from the proposed M3 / A34 northbound diverge to a point 223 metres from the proposed M3 Junction 9 gyratory northern bridge between point 23 and 24 on sheets 6 and 5 of the classification of road plans, comprising 1171 metres. |
Hampshire County Council (Winchester) | A34 northbound onslip from the proposed M3 Junction 9 gyratory to a point 68 metres from the proposed M3 Junction 9 gyratory between point 25 and 26 on sheets 7 and 6 of the classification of road plans, comprising 613 metres. |
Hampshire County Council (Winchester) | M3 northbound offslip from a point 60 metres from the proposed M3 Junction 9 gyratory southern bridge to a point 63 metres from the proposed M3 Junction 9 gyratory southern bridge between point 27 and 28 on sheet 7 of the classification of road plans, comprising 39 metres. |
Hampshire County Council (Winchester) | M3 Junction 9 gyratory extents as shown at point 29 on sheet 7 of the classification of road plans, comprising 583 metres. |
Commencement Information
I3Sch. 3 Pt. 3 in force at 9.10.2024 (as amended by S.I. 2024/1020, Sch.), see art. 1
(1) Area | (2) Length of Road |
---|---|
Hampshire County Council (Winchester) | A33 northbound carriageway between point 1 and 2 on sheets 3 and 5 of the de-trunking plans, comprising 1182 metres. |
Hampshire County Council (Winchester) | A33 southbound carriageway between point 3 and 4 on sheets 3 and 5 of the de-trunking plans, comprising 1261 metres. |
Hampshire County Council (Winchester) | A34 northbound carriageway between point 5 and 6 on sheets 5, 6 and 7 of the de-trunking plans, comprising 935 metres. |
Hampshire County Council (Winchester) | A34 southbound carriageway between point 7, 8, 9 and 10 on sheets 5, 6 and 7 of the de-trunking plans, comprising 902 metres. |
Hampshire County Council (Winchester) | M3 northbound onslip to M3 northbound carriageway from M3 Junction 9 gyratory between point 11, 12 and 13 on sheets 6 and 7 of the de-trunking plans, comprising 259 metres. |
Hampshire County Council (Winchester) | M3 southbound offslip from M3 southbound carriageway to M3 Junction 9 gyratory between point 14 and 15 on sheets 6 and 7 of the de-trunking plans, comprising 418 metres. |
Hampshire County Council (Winchester) | M3 southbound onslip to M3 southbound carriageway from M3 Junction 9 gyratory between point 16 and 17 on sheet 7 of the de-trunking plans, comprising 245 metres. |
Hampshire County Council (Winchester) | M3 northbound offslip from M3 northbound carriageway to M3 Junction 9 gyratory between point 18 and 19 on sheet 7 of the de-trunking plans, comprising 315 metres. |
Hampshire County Council (Winchester) | M3 Junction 9 gyratory as shown by point 20 on sheet 7 of the de-trunking plans, comprising 645 metres. |
Commencement Information
I4Sch. 3 Pt. 4 in force at 9.10.2024 (as amended by S.I. 2024/1020, Sch.), see art. 1
(1) Area | (2) Length of road |
---|---|
Hampshire County Council (Winchester) | A33 southbound from a point 17 metres from the existing Cart and Horses Junction (Kings Worthy) to the proposed A33 / M3 northbound onslip roundabout between points 1 and 2 on sheets 3 and 5 of the classification of road plans, comprising 1367 metres. |
Hampshire County Council (Winchester) | A33 northbound from the proposed A33 / M3 northbound onslip roundabout to the existing Cart and Horses Junction (Kings Worthy) between point 3 and 4 on sheets 3 and 5 of the classification of road plans, comprising 1367 metres. |
Hampshire County Council (Winchester) | Easton Lane southbound from a point 104 metres from the proposed M3 Junction 9 gyratory southern bridge to a point 196 metres from the proposed M3 Junction 9 gyratory southern bridge between point 44 and 45 on sheet 7 of the classification of road plans, comprising 100 metres. |
Hampshire County Council (Winchester) | Easton Lane northbound from a point 126 metres from the proposed M3 Junction 9 gyratory southern bridge to a point 145 metres from the proposed M3 Junction 9 gyratory southern bridge between point 46 and 47 on sheet 7 of the classification of road plans, comprising 38 metres. |
Hampshire County Council (Winchester) | A272 southbound from the proposed M3 Junction 9 gyratory to a point 132 metres from the proposed M3 Junction 9 gyratory southern bridge between point 40 and 41 on sheet 7 of the classification of road plans, comprising 204 metres. |
Hampshire County Council (Winchester) | A272 northbound from a point 103 metres from the proposed M3 Junction 9 gyratory to the proposed M3 Junction 9 gyratory between point 42 and 43 on sheet 7 of the classification of road plans, comprising 171 metres. |
Commencement Information
I5Sch. 3 Pt. 5 in force at 9.10.2024 (as amended by S.I. 2024/1020, Sch.), see art. 1
(1) Area | (2) Road name, number and length | (3) Speed limit |
---|---|---|
Hampshire County Council (Winchester) | Easton Lane northbound between point 31 and 32 on sheet 7 of the speed limits plans, comprising 15 metres. | 30mph |
Hampshire County Council (Winchester) | Easton Lane southbound between point 33 and 34 on sheet 7 of the speed limits plans, comprising 80 metres. | 30mph |
Hampshire County Council (Winchester) | A33 northbound and southbound between point 1 and 2 on sheet 3 of the speed limits plans, comprising 327 metres. | 40mph |
Hampshire County Council (Winchester) | A33 southbound between point 3 and 4 on sheet 5 of the speed limits plans, comprising 163 metres. | 40mph |
Hampshire County Council (Winchester) | A33 southbound from proposed A33 / M3 northbound onslip roundabout to the proposed National Highways depot roundabout between Point 5 and 6 on sheets 5 and 6 of the speed limits plans, comprising 527 metres. | 40mph |
Hampshire County Council (Winchester) | A33 southbound from proposed National Highways depot roundabout to the proposed M3 Junction 9 gyratory between point 7 and 8 on sheets 6 and 7 of the speed limits plans, comprising 222 metres. | 40mph |
Hampshire County Council (Winchester) | A33 northbound from the proposed M3 Junction 9 gyratory to the proposed National Highways depot roundabout between point 9 and 10 on sheets 7 and 6 of the speed limits plans, comprising 244 metres. | 40mph |
Hampshire County Council (Winchester) | A33 northbound from the proposed National Highways depot roundabout to the proposed A33 / M3 northbound onslip roundabout between point 11 and 12 on sheets 6 and 5 of the speed limits plans, comprising 527 metres. | 40mph |
Hampshire County Council (Winchester) | A33 northbound from the proposed A33 / M3 onslip roundabout to the A33 northbound between point 13 and 3 on sheet 5 of the speed limits plans, comprising 163 metres. | 40mph |
Hampshire County Council (Winchester) | A33 northbound from the proposed A33 / M3 northbound onslip roundabout to the M3 northbound onslip between point 14 and 15 on sheet 5 of the speed limits plans, comprising 46 metres. | 40mph |
Hampshire County Council (Winchester) | A33 / M3 northbound onslip roundabout extents as shown at point 16 on sheet 5 of the speed limits plans, comprising 83 metres. | 40mph |
Hampshire County Council (Winchester) | National Highways depot roundabout extents as shown at point 17 on sheet 6 of the speed limits plans, comprising 83 metres. | 40mph |
Hampshire County Council (Winchester) | A34 southbound diverge to the -proposed M3 Junction 9 gyratory between point 21 and 22 on sheets 6 and 7 of the speed limits plans, comprising 393 metres. | 40mph |
Hampshire County Council (Winchester) | A34 / M3 southbound offslip merge between point 23 and 24 on sheet 6 of the speed limits plans, comprising 50 metres. | 40mph |
Hampshire County Council (Winchester) | A34 northbound onslip between point 29 and 27 on sheet 7 of the speed limits plans, comprising 39 metres. | 40mph |
Hampshire County Council (Winchester) | Easton Lane northbound between point 30 and 31 on sheet 7 of the speed limits plans, comprising 23 metres. | 40mph |
Hampshire County Council (Winchester) | Easton Lane southbound between point 34 and 35 on sheet 7 of the speed limits plans, comprising 36 metres. | 40mph |
Hampshire County Council (Winchester) | A272 southbound between point 40 and 41 on sheet 7 of the speed limits plans, comprising 204 metres. | 40mph |
Hampshire County Council (Winchester) | A272 northbound between point 41 and 42 on sheet 7 of the speed limits plans, comprising 180 metres. | 40mph |
Hampshire County Council (Winchester) | M3 Junction 9 gyratory extents as shown at point 43 on sheet 7 of the speed limits plans, comprising 583 metres. | 40mph |
Hampshire County Council (Winchester) | M3 northbound offslip to the proposed M3 Junction 9 gyratory between point 36 and 37 on sheet 7 of the speed limits plans, comprising 40 metres. | 40mph |
Hampshire County Council (Winchester) | M3 southbound onslip from the proposed M3 Junction 9 gyratory between point 38 and 39 on sheet 7 of the speed limits plans, comprising 36 metres. | 40mph |
Hampshire County Council (Winchester) | A33 northbound and southbound between point 2 and 3 on sheets 3 and 5 of the speed limits plans, comprising 871 metres. | 50mph |
Hampshire County Council (Winchester) | A34 southbound to M3 southbound onslip merge between point 18 and 19 on sheets 5 and 6 of the speed limits plans, comprising 905 metres. | 50mph |
Hampshire County Council (Winchester) | A34 southbound diverge to proposed M3 Junction 9 gyratory between point 20 and 21 on sheet 6 of the speed limits plans, comprising 200 metres. | 50mph |
Hampshire County Council (Winchester) | A34 northbound between point 26 and 28 on sheets 6 and 5 of the speed limits plans, comprising 802 metres. | 50mph |
Hampshire County Council (Winchester) | A34 northbound from M3 northbound diverge to A34 northbound between point 25 and 26 on sheet 6 of the speed limits plans, comprising 390 metres. | 70mph |
Hampshire County Council (Winchester) | A34 onslip from proposed M3 Junction 9 gyratory between point 27 and 26 on sheets 7 and 6 of the speed limits plans, comprising 578 metres. | 70mph |
Hampshire County Council (Winchester) | M3 northbound offslip between point 44 and 36 on sheets 8 and 7 of the speed limits plans, comprising 486 metres. | 70mph |
Hampshire County Council (Winchester) | M3 southbound onslip between point 39 and 53 on sheets 7 and 8 of the speed limits plans, comprising 763 metres. | 70mph |
Hampshire County Council (Winchester) | M3 northbound between point 45 and 25 on sheets 8, 7 and 6 of the speed limits plans, comprising 876 metres. | 70mph |
Hampshire County Council (Winchester) | M3 northbound between point 46 and 47 on sheets 6, 5 and 4 of the speed limits plans, comprising 1186 metres. | 70mph |
Hampshire County Council (Winchester) | M3 northbound onslip between point 15 and 48 on sheets 5 and 4 of the speed limits plans, comprising 605 metres. | 70mph |
Hampshire County Council (Winchester) | M3 southbound between point 49 and 50 on sheets 5, 6, 7 and 8 of the speed limits plans, comprising 1980 metres. | 70mph |
Hampshire County Council (Winchester) | M3 southbound offslip between point 51 and 23 on sheets 5 and 6 of the speed limits plans, comprising 695 metres. | 70mph |
Hampshire County Council (Winchester) | M3 southbound onslip merge between point 19 and 52 on sheets 6, 7 and 8 of the speed limits plans, comprising 1305 metres. | 70mph |
Hampshire County Council (Winchester) | M3 southbound onslip from the proposed M3 Junction 9 gyratory between point 39 and 53 on sheets 7 and 8 of the speed limits plans, comprising 763 metres. | 70mph |
Commencement Information
I6Sch. 3 Pt. 6 in force at 9.10.2024 (as amended by S.I. 2024/1020, Sch.), see art. 1
(1) Area | (2) Road name, number and length | (3) Measures |
---|---|---|
Hampshire County Council (Winchester) | A33 southbound from the Cart and Horses Junction (Kings Worthy) to the proposed A33 / M3 northbound onslip roundabout between point 1 and 2 on sheets 3 and 5 of the traffic regulation measures plans, comprising 1366 metres. | Clearway |
Hampshire County Council (Winchester) | A33 southbound from the proposed A33 / M3 northbound onslip roundabout to the proposed National Highways depot roundabout between point 3 and 4 on sheets 5 and 6 of the traffic regulation measures plans, comprising 526 metres. | Clearway |
Hampshire County Council (Winchester) | A33 southbound from the proposed National Highways depot roundabout to the proposed M3 Junction 9 gyratory between point 5 and 6 on sheets 6 and 7 of the traffic regulation measures plans, comprising 224 metres. | Clearway |
Hampshire County Council (Winchester) | A33 northbound from the proposed M3 Junction 9 gyratory to the proposed National Highways depot roundabout between Point 7 and 8 on sheets 6 and 7 of the traffic regulation measures plans, comprising 242 metres. | Clearway |
Hampshire County Council (Winchester) | A33 northbound from the proposed National Highways depot roundabout to the proposed A33 / M3 northbound onslip roundabout between Point 9 and 10 on sheets 6 and 5 of the traffic regulation measures plans, comprising 527 metres. | Clearway |
Hampshire County Council (Winchester) | A33 northbound from the proposed A33 / M3 northbound onslip roundabout to a point 20 metres from the existing Cart and Horses Junction (Kings Worthy) between point 11 and 12 on sheets 5 and 3 of the traffic regulation measures plans, comprising 1365 metres. | Clearway |
Hampshire County Council (Winchester) | A33 northbound from the proposed A33 / M3 northbound onslip roundabout to a point 24 metres from the proposed A33 / M3 northbound onslip roundabout between point 13 and 14 on sheet 5 of the traffic regulation measures plans, comprising 10 metres. | Clearway |
Hampshire County Council (Winchester) | A33 / M3 northbound onslip roundabout the proposed roundabout extents as shown as point 15 on sheet 5 of the traffic regulation measures plans, comprising 84 metres. | Clearway |
Hampshire County Council (Winchester) | National Highways depot roundabout the proposed roundabout extents as shown as point 16 on sheet 6 of the traffic regulation measures plans, comprising 84 metres. | Clearway |
Hampshire County Council (Winchester) | A34 southbound from a point 662 metres from the proposed M3 underpass northern portal to a point 204 metres from the proposed M3 underpass southern portal between point 17 and 18 on sheets 6 and 5 of the traffic regulation measures plans, comprising 891 metres. | Clearway |
Hampshire County Council (Winchester) | A34 southbound from diverge to the proposed M3 Junction 9 gyratory between point 19 and 20 on sheets 6 and 7 of the traffic regulation measures plans, comprising 589 metres. | Clearway |
Hampshire County Council (Winchester) | A34 southbound from a point 393 metres from the proposed M3 Junction 9 gyratory northern bridge to a point 346 metres from the proposed M3 Junction 9 gyratory northern bridge between point 21 and 22 on sheet 6 of the traffic regulation measures plans, comprising 50 metres. | Clearway |
Hampshire County Council (Winchester) | A34 northbound from M3 / A34 northbound diverge to a point 1172 metres from the M3 / A34 northbound diverge between point 23 and 24 on sheets 6 and 5 of the traffic regulation measures plans, comprising 1172 metres. | Clearway |
Hampshire County Council (Winchester) | A34 northbound onslip from a point 32 metres from the proposed M3 Junction 9 gyratory northern bridge between Point 25 and 26 on sheets 7 and 6 of the traffic regulation measures plans, comprising 612 metres. | Clearway |
Hampshire County Council (Winchester) | Easton Lane northbound between point 27 and 28 on sheet 7 of the traffic regulation measures plans, comprising 23 metres. | Clearway |
Hampshire County Council (Winchester) | Easton Lane southbound between point 29 and 30 on sheet 7 of the traffic regulation measures plans, comprising 25 metres. | Clearway |
Hampshire County Council (Winchester) | M3 northbound offslip between point 31 and 32 on sheet 7 of the traffic regulation measures plans, comprising 40 metres. | Clearway |
Hampshire County Council (Winchester) | M3 Junction 9 gyratory extents as shown at point 33 (including points 34, 35, 36) on sheet 7 of the restrictions to traffic movement plans, comprising 635 metres. | Clearway |
Hampshire County Council (Winchester) | A33 overtaking between point 37 and 38 on sheets 6 and 5 of the traffic regulation measures plans, comprising 487 metres. | No overtaking |
Hampshire County Council (Winchester) | A33 overtaking between point 39 and 40 on sheets 5 and 3 of the traffic regulation measures plans, comprising 731 metres. | No overtaking |
Commencement Information
I7Sch. 3 Pt. 7 in force at 9.10.2024 (as amended by S.I. 2024/1020, Sch.), see art. 1
(1) Area | (2) Road name, number and length | (3) Title of Order | (4) Revocations or variations |
---|---|---|---|
Hampshire County Council (Winchester) | A34 northbound carriageway between point 1 and 2 on sheets 5 and 7 of the revoking existing clearway orders plans, comprising 926 metres. | The Winchester-Preston Trunk Road (A34) (24 Hours Clearway) (No.2) Order 1987 | Existing section of highway (in part) to be stopped up. Traffic regulation order to be revised to suit proposed highway arrangement. |
Hampshire County Council (Winchester) | A34 southbound carriageway between point 3 and 4 on sheets 5 and 7 of the revoking existing clearway orders plans, comprising 899 metres. | The Winchester-Preston Trunk Road (A34) (24 Hours Clearway) (No.2) Order 1987 | Existing section of highway (in part) to be stopped up. Traffic regulation order to be revised to suit proposed highway arrangement. |
Hampshire County Council (Winchester) | A33 between point 5 and 6 on sheets 3 and 5 of the revoking existing clearway orders plans, comprising 929 metres. | The South West of Basingstoke – Southampton Trunk Road (Prohibition of Waiting) (Clearways) Order 1968 | Existing section of highway (in part) to be stopped up. Traffic regulation order to be revised to suit proposed highway arrangement. |
Commencement Information
I8Sch. 3 Pt. 8 in force at 9.10.2024 (as amended by S.I. 2024/1020, Sch.), see art. 1
(1) Area | (2) Status and length of public right of way / footpath / cycle track / bridleway / footway and associated structures |
---|---|
Hampshire County Council (Winchester) | Cycle track between the Cart and Horses Junction (Kings Worthy) to the existing NCN Route 23 adjacent to Tesco and the proposed gyratory between points 16, 4 and 15 as shown on sheets 3, 5, 6 and 7 of the rights of way and access plans, comprising 2606 metres. |
Hampshire County Council (Winchester) | Bridleway between the proposed gyratory and Easton Lane between point 3 and 4 as shown on sheets 6 and 7 of the rights of way and access plans, comprising 277 metres. |
Hampshire County Council (Winchester) | Bridleway between Easton Lane and Long Walk between point 1 and 2 on sheets 4, 5, 6 and 7 of the rights of way and access plans, comprising 1197 metres. |
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: