SCHEDULE 1Correctable Errors
Provision | How correction is to be made | Text to be substituted, inserted or omitted |
---|---|---|
Article 2, Interpretation, Definition of traffic regulation order plan | For “article 498” substitute | “article 48” |
Article 19 (Discharge of Water) Paragraph 10 | Omit entire paragraph | “(10) Any application for consent under paragraph (3) or approval under paragraph (4)(a) must include a statement that the provisions of paragraph (9) apply to that application.” |
Article 19 (Discharge of Water) Paragraph 11 | For “(11) In relation to any works executed” substitute | “(10) In relation to any works executed” |
Article 21 (Authority to survey and investigate the land) Paragraph 1(a) | After “investigate the land” omit | “;” |
Article 48 (Certification of plans, etc.) Paragraph (k) | After “Figure 3.10-3.12” omit | “,” |
Article 48 (Certification of plans, etc.) Paragraph (k) | After “Figure 3.10-3.12” insert | “in” |
Schedule 3, Requirement 2 (Time Limits) Paragraph 2 | For “If any proceedings are begun to challenge that validity of this Order, the period specified in sub-paragraph (1) is extended by” substitute | “If any proceedings are begun to challenge the validity of this Order, the period specified in paragraph (1) is extended by” |
Schedule 3, Requirement 2 (Time Limits) Paragraph 3 | For “sub-section (2)(a)” substitute | “paragraph (2)(a)” |
Schedule 3, Requirement 10 (Replacement planting) Paragraph 1 | After “under Requirement 9” insert | “(retention and protection of existing trees)” |
Schedule 3, Requirement 10 (Replacement planting) Paragraph 2 | After “under Requirement 8” insert | “(landscaping at Overton, Tadcaster and Monk Fryston)” |
Schedule 3, Requirement 18, (Approval of details having regard to the Design Approach to Site Specific Infrastructure) Paragraph 2 | For “(2) Any non-linear site permanent security fencing at” substitute | “(2) Any permanent site security fencing for a non-linear work at” |
Schedule 3, Requirement 18, (Approval of details having regard to the Design Approach to Site Specific Infrastructure) Paragraph 3 | For “under sub-paragraphs” substitute | “under paragraphs” |
Schedule 3, Requirement 19 (Site specific mitigation scheme) Paragraph 2 | For “in sub-paragraph” substitute | “in paragraph” |
Schedule 3, Requirement 19 (Site specific mitigation scheme) Paragraph 3 | For “In the event that significant effects of notice or vibration are identified on receptors SEL16 and SEL17 as shown within the Noise and Vibration Figures (Document 5.4.14), the scheme referred to in sub-paragraph (1) must include mitigation measures to reduce the significant effects as far as practicable.” substitute | “In the event that significant effects of noise or vibration are identified on receptors SEL16 and SEL17 as shown within the Noise and Vibration Figures (Document 5.4.14), the scheme referred to in paragraph (1) must include mitigation measures to reduce the significant effects as far as practicable.” |
Schedule 3, Requirement 19 (Site specific mitigation scheme) Paragraph 4 | For “in sub-paragraph” substitute | “in paragraph” |
Schedule 15, Protective Provisions, Part 6 (For the protection of National Highways Limited) Paragraph 62 (Interpretation) Definition of “Highway detailed design information” sub-paragraph (d) | After “standards for Highways” insert | “;” |
Schedule 15, Protective Provisions, (For the protection of National Highways Limited), Paragraph 67, (Prior approvals and security) Sub-paragraph 2 (e) | For “under sub-paragraph (c)(v) above;” substitute | “under sub-paragraph (c)(iv) above;” |
Schedule 15, Protective Provisions, (For the protection of National Highways Limited), Paragraph 68, (Construction of the specified works) Sub-paragraph 7 | For “under sub-paragraph (6) or sub-paragraph (7)” substitute | “under sub-paragraph (5) or sub-paragraph (6)” |